1 / 4

UNITAR -Thailand GHS Capacity Building Project

UNITAR -Thailand GHS Capacity Building Project. Country Pilot Project (May 2005- April 2007). Project Coordinating Arrangement. GHS. Contributing sectors / Lead Agencies :. Industry. Transport. Agriculture. Consumer. Min.of Industry Dept. of Industrial Works. Min. of Transport.

erica
Download Presentation

UNITAR -Thailand GHS Capacity Building Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UNITAR -Thailand GHS Capacity Building Project Country Pilot Project (May 2005- April 2007)

  2. Project Coordinating Arrangement GHS Contributing sectors / Lead Agencies: Industry Transport Agriculture Consumer Min.of Industry Dept. of Industrial Works Min. of Transport Min.of Agriculture and Cooperatives Dept. of Agriculture Min. of Public Health FDA Project Coordinator: Chemical Safety Group, FDA, National Focal Point for IFCS

  3. Framework of Activities • Phase 1 (2005): • GHS situations/ Gap Analysis • Comprehensibility study of symbols and labels • Phase 2 (2006): • National GHS Workshop • Drafting GHS Implementing Legislation / Regulations • Capacity Building and Strategy Development in Business and Trade • Capacity Building and Strategy Development for Civil Society • Phase 3 (2007): • National Review Workshop Endorsement of the National Strategic Plan/ Roadmap for GHS implementation by 2008

  4. Thank you

More Related