Case studies from Slovenia. ‘The Geothermal Heat Pumps market in Central & Eastern Europe’. Evgen Torhač Project manager. Bratislava, 12.11.2007. Introduction. Nafta Geoterm profile Current status in Slovenia Lendava geothermal city – project example HTH pump Future development.

eris
Download Presentation

Case studies from Slovenia

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Case studies from Slovenia ‘The Geothermal Heat Pumps market in Central & Eastern Europe’ Evgen Torhač Project manager Bratislava, 12.11.2007

  2. Introduction • Nafta Geoterm profile • Current status in Slovenia • Lendava geothermal city – project example • HTH pump • Future development

  3. Nafta Geoterm (NG) Profile • NG is a daughter company of Nafta Lendava, with extensive experience in exploration of underground resources since 1945; • Located in north-eastern Slovenia rich with geothermal energy potential • A key player for the further development of geothermal field in this part of central & eastern Europe

  4. NG strategic activities • Increasing the proportion of production and use of environment-friendly geothermal energy with: • direct use of geothermal water and • increasing the efficiency with Heat Pumps • Providing Turn-key solutions on the field of geothermal energy exploration and its utilization • The future built on • Exploring • Developing • Deploying • Bringing clean energy to your house!

  5. Development in Slovenia • A lot of potential for direct use, especially north-eastern part of Slovenia – 45 MWt installed at 27 locations • GSHP installed – 2,33 MWt • GHP installed – 3,94 MWt • Geothermal system utilization increased substantially in last three years (no official data available yet) • Utilization not optimal with regards to the potential available! Source: Proceedings World Geothermal Congress 2005

  6. Current situation in Slovenia • HEALTH RESORTS • ANDRECREATION CENTERS • (24 loc. – 17,6 MWt) • INDUSTRIAL APPLICATIONS: • GREENHOUSES (12,7 MWt) • OTHER (1 MWt) • DISTRICT HEATING SYSTEMS • (4 loc. – 7 MWt)

  7. Lendava Geothermal city • Production geothermal well Le-2g • Geothermal - gas boiler house • Surface heat conducting system • Injection geothermal well Le-3g • Surface injection system • Monitoring system

  8. Surface heat conduction system • PRIMARY CIRCUIT: • PIPELINE DIAMETER • 150 mm • PIPELINE LENGTH • 2000 m • SECONDARY CIRCUIT: • PIPELINE DIAMETER • 150 m • PIPELINE LENGTH • 1200 m

  9. Facts and figures • Fully automated system • Thermomineral water temperature: 67ºC • Flow rate: 90 m3/h • Heat exchangers: • 1x 2,70 MWt • 1x 0,45 MWt • 1x 0,17 MWt • Gas boilers for backup & peak loads: 2 x 1,320 MWt • Price of geothermal energy lower than conventional

  10. Unexploited potential • System based on district heating with high peak loads • Energy potential not used in summer periods • Wasted water temperature: up to 40ºC • With the use of special high temperature GHP the installed power could be doubled! • OPTIMIZATION NEEDED!

  11. HTH pump project • EUREKA project • Goal: to develop a high power (over 250kW) high temperature (up to 80ºC) GHP for exploitation of low temperature (up to 40ºC) geothermal sources • Increasing the overall efficiency of geothermal systems • Enable faster deployment of applications like (district heating, greenhouses, …) • Development of geothermal systems in the areas with lower gradient

  12. HTH pump project • Input temperature: up to 40ºC • High COP • Output temperature: up to 80ºC • Additional 2,5 MW in geothermal city Lendava • Very high utilitzation potential • COOPERATION ON THE PROJECT POSSIBLE AND PREFFERABLE!

  13. Future projects • High temperature water • for electricity production EXPLORE ! DEPLOY ! • Geothermal • community DEVELOP ! • Bubble-3Well