An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UPR-R(river) P(rock) X Progress Report April 28, 2011

  2. Team Members Students: Faculty Support: • Angelica Betancourt • Joseph Casillas • Luis Maldonado • Pedro Melendez • Marisara Morales • Joshua Nieves • Oscar A. Resto • Omar Rocafort • Carlos Rodriguez • Esteban Romero • SamalisSantini • Marimer Soto • Yashira Torres • Vladimir Makarov • Gerardo Morell • Ricardo Morales • Gladys Muñoz • Guillermo Nery • Oscar Resto

  3. Mission Overview In representation of the University of Puerto Rico, as a team we intend to get involved in the pilot project RockSat X 2011 to expand our knowledge and that of others in aerospace related areas.Carefully selected, the experiment that will be carried out includes mass spectroscopy to analyze molecular species and their respective partial pressures in near space. In this way we will contribute with valuable information for interstellar travel and advances benefiting the space bound crew to collect and replenish essential resources such as water and fuel.

  4. Functional Block Diagram

  5. Mass Spectrometer to plate Interface

  6. Payload Plate

  7. Plate/MS Assembly

  8. Mass Spectrometer Inspection

  9. Mass Spectrometer Integration

  10. Medium Power Speakers just 500kW20 to 20k Hz

  11. Real Test Up to 150 G’s, op’s…

  12. Environmental Video

  13. What we found at the end of the Day

  14. Results of Environmental test • What went wrong? • The ceramics in our Mass Spectrometer did not survive the vibrations of the environmental test. • What went right? • The filament of the RGA survived the environmental test. • Mass spectrometer tests with some compounds. • RockSat-X Plate fits well with the base and the mass spectrometer.

  15. Issues and Concerns • Our main concern will be to make the deadline of May 16, because we are still waiting for some of the materials that are crucial for the test. First, the ceramics that will be used to fix the RGA that was destroyed in the environmental test. • We are also waiting for different parts to arrive. The ones that we will be using to construct the boom arms.