An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. I-210Corridor System Management PlanStakeholders Kick-off MeetingSeptember 25, 2007System Metrics Group, Inc (SMG)

  2. Corridor System Management 25 miles I-5 to SR57 20 miles

  3. Corridor System Management

  4. Corridor-wide Performance Focused WB-210 @Lake Speed Flow

  5. Corridor-wide Performance Focused EB-210 @Citrus Speed Flow

  6. Corridor-wide Performance Focused WB-210 @Baldwin Speed Flow Productivity drops by 30% when speeds drop below 30 mph (1 lane equivalent). Productivity picks up when speeds are above 40 mph.

  7. Corridor-wide Performance Focused WB-210 @Santa Anita Speed Flow Productivity drops by 30% when speeds drop below 30 mph (1.5 lane equivalent). Productivity picks up when speeds are above 40 mph.

  8. Corridor-wide Performance Focused WB-210 @Huntington Speed Flow Productivity drops by 30% when speeds drop below 30 mph (1 lane equivalent). Productivity picks up when speeds are above 40 mph.

  9. Corridor-wide Performance Focused EB-210 @Huntington Speed Flow Productivity drops by 30% when speeds drop below 30 mph (1 lane equivalent). Productivity picks up when speeds are above 40 mph.

  10. Base Performance Assessment (PeMS, TASAS, Other) Bottleneck Identification (HICOMP, PeMS, Aerial Photographs, CHP Logs, Other) Future Planned, Performance Improvement Programmed and (Micro-Simulation, Scenarios other Regional Models) Improvements Scenario Performance Evaluation (Micro and Meso Models) Recommendations and Performance Improvement Estimates CSMP Steps • Current Corridor-wide Performance Assessment • Bottleneck Identification • Baseline Model Development and Calibration • Future Model Development and Future Performance • Improvement Scenario Development and Evaluation • Recommended Improvements

  11. CSMP Report Elements • BASELINE (2006) AND CURRENT (2007) CONDITIONS • Corridor-wide Performance Assessment • Bottleneck Identification and Causes • FUTURE YEAR (2020) MICRO-SIMULATION MODELING  • Existing Projects Under Development • Existing Programmed and Planned Projects • Team Recommended Additional Mitigation Strategies • Future Project Scenarios • PREDICTED FUTURE CONDITIONS ASSESSMENT • Scenario 1 – X • Benefit-Cost • CONCLUSIONS AND RECOMMENDATIONS • Prioritized list of existing projects by benefit-cost • New projects

  12. District 7 Detection

  13. Caltrans PeMS

  14. Reliability Productivity Safety Mobility 1. Corridor-wide Performance Assessment Performance

  15. 1. Corridor-wide Performance Assessment

  16. 1. Corridor-wide Performance Assessment Congestion Delay

  17. 1. Corridor-wide Performance Assessment Congestion Delay

  18. 1. Corridor-wide Performance Assessment 2,070,000 vehicle-hours Congestion Delay 2,085,000 vehicle-hours

  19. 1. Corridor-wide Performance Assessment Travel Time

  20. 1. Corridor-wide Performance Assessment Reliability (Travel Time Variability)

  21. 1. Corridor-wide Performance Assessment WESTBOUND I-210 SR134 I-605 SR57 SPEED (mph)

  22. 1. Corridor-wide Performance Assessment EASTBOUND I-210 SR57 I-605 10-MILE MAXIMUM QUEUE SR134 5-HOUR PERIOD SPEED (mph)

  23. 1. Corridor-wide Performance Assessment CHP Reported Incidents WB-210 11/16/06 2006 Total 7,244 total incidents (~30/day)

  24. 1. Corridor-wide Performance Assessment CHP Reported Incidents EB-210 11/16/06 2006 Total 7,258 total Incidents (~30/day)

  25. 2. Bottleneck Identification WESTBOUND I-210 SR134 Hill Altadena Baldwin Santa Anita I-605 Azusa SR57 SPEED (mph)

  26. 2. Bottleneck Identification WESTBOUND I-210 Rte66/Foothill SR57 Azusa I-605 Mountain SR134 SPEED (mph)

  27. 3.-4. Base and Future Model Microscopic simulation: • a software tool to model traffic system, including roads, drivers, and vehicles, in fine details. Micro-simulation models • PARAMICS, VISSIM, AIMSUN2, CORSIM, MITSIM … Micro-simulation applications • Evaluate traffic flow and performance improvements for multiple investment types, including expansion, operational improvements, and ITS • Develop and evaluate new traffic models, algorithms, control strategies I-5 Orange County I-405 Network

  28. 5. Improvement Scenarios Existing Bottlenecks and Potential Solutions

  29. 5. Improvement Scenarios Existing Projects

  30. 5. Improvement Scenarios

  31. 6. Recommendations Short to Medium Range • Transportation Management Systems • Intelligent Transportation Systems • Transit Systems • Operational Improvements (aux lanes, ramps) • Maintenance (pavement) • Arterials Long Range • Operational Improvements • Capital Improvements (interchanges) • Expansion (freeway, transit, arterials)

  32. Example of Recommended Improvements Transportation Management System • Widen ramps (increase storage) • Convert HOV bypass lanes to metered lanes • Connector metering (reduce demand) • Central control adaptive ramp metering (SWARM) Operational Improvements • Auxiliary lanes • Minor geometric modifications • Interchange modifications • Arterial connections/transitions

  33. Example of Recommended Improvements Freeway to Freeway Connector Ramp Metering NB-57 to WB-210 Connector Ramp

  34. Example of Recommended Improvements Freeway to Freeway Connector Ramp Metering EB-105 to NB-605 Connector Ramp (Metered) 2300 vph Mainline Speed 70 mph 720 vph 20 mph Ramp Flow

  35. Example of Recommended Improvements Central Control Adaptive Ramp Metering (SWARM)

  36. Example of Recommended Improvements Central Control Adaptive Ramp Metering (SWARM) • 2001 initial application test • Speed improvements (10 to 20% in peak hour) • Travel time improvements (15% in peak hour) • Mainline flow increase (5% in peak hour) • Ramp flow decrease (5%) • Ramp queue increase (20%) • 2007/2008 application test • Widen ramp storage • Queue detection control (queue does not exceed ramp) • Fwy to fwy connector metering control • Rates based on downstream bottlenecks

  37. So What? WB-210 @Huntington Speed Flow Productivity drops by 30% when speeds drop below 30 mph (1 lane equivalent). Productivity picks up when speeds are above 40 mph. 2000 more cars on the freeway will mean 2000 less on arterials (Foothill/Huntington Blvd)

  38. PROJECT DISCUSSION • 2006 Baseline Year • Open to I-215 since July 2007 • Current connector metering project construction 2008 • Good freeway historical data to 2001 • Micro-simulation Model • VISSIM Model • e/o SR-57 to w/o SR-134 only • Westbound AM only; Eastbound PM only • Data needs and collection • Budget and schedule constraints • Freeway simulation only

  39. STAKEHOLDERS Stakeholders Role • Local issues and concerns • Relevant existing studies to consider • Simulation modeling input • Data resources • Review results How • Follow-up workshops

  40. Contact info:Philip Law, SCAG – law@scag.ca.gov, 213-236-1841Elhami Nasr, Caltrans – elhami_nasr@dot.ca.gov, 213-897-0227Tom Choe, SMG – tom_choe@sysmetgroup.com, 213-382-6875