240 likes | 268 Views
This document outlines the scope, organization, status, and technical highlights of the X-Ray Transport, Optics, and Diagnostics (XTOD) at LCLS Week in April 2005. It covers the work plan, instrumentation status, staff information, meetings, simulations, tasking, personnel assignments, engineering plans, goals, and presentations.
E N D
X Ray Transport, Optics, and Diagnostics, Overview LCLS Week April 4-6, 2005
Outline • XTOD Scope & Organization • XTOD Status and Technical Highlights • XTOD FY05 Work plan
1.5 Scope: Front End Enclosure/ Near Experimental Hall NEH PPS PPS Muon shield Flipper Mirror Front End Enclosure PPS Comissioning: Spectrometers, Total Energy Solid Attenuator Slit A NFOV Direct Imager Indirect Imager Slit B Photon Beam WFOV Direct Imager Gas Attenuator Muon shield Fast close valve Other: Direct Imager Fixed masks Electron Beam Electron Dump
FEH 1.5 Scope: NEH, Tunnel, FEH Pulse Split and Delay X-Ray Beam Transport Tunnel System Monochrometer Far Hall Direct Imager and Tank NEH Flipper Mirror
XTOD Staff-up complete for FY05 R. Bionta LLNL LCLS Project Leader D. McMahon XTOD Project Engineer J. McNamara Admin. Rodney Victorine Resource Manager Jolyn Scholes Resource Analyst M. Eberstein G. Otani Procurement R. Beale Hazards Control EE E. Ables ME P. Duffy M. Mckernan S. Shen J. Trent Comp K. Fong S. Lewis L. Ott Physics S. Friedrich S. Hau-Reige M. Pivovaroff D. Ryutov DNT R. London UC Davis H. Baldis Remainder of FY05 P3 labor "loosly" matrixed, i.e L. Li - thermal analysis, Bajt, multilayers, shops, finance…
Standing Meetings at LLNL • XTOD Staff Meeting • @LLNL, every Monday, 11:00 AM, B142 1st floor conf. Rm. • Discussion of work plan for the week • XTOD Topical Meeting • @LLNL, every Wednesday, 2:00 PM, B142 2nd Floor • Topics vary ie. Gas Attenuator, M&V, Controls, etc. • LCLS Community welcome to attend any of these meetings • E-mail Jane mcnamara20@llnl.gov at least 1 day ahead for badge.
HEPOM* Simulations 3 cm dia. Al Collimators 5 cm dia. Ta Collimators 5 cm dia. Al Collimators *High Energy Pick Off Mirror
Wide Field of View Direct Imager Photoelectrons Optic Camera Scintillators
Indirect Imager Simulation 1 m Spontaneous + e FEL 2.90068 degrees 101 mm Be/SiC 300 layer pairs 60 Angstrom period Gamma = 0.2 On 0.5 mm thick Si 10 cm diameter ~5% efficient @ 8keV 0.1% FEL with E>2 keV
100 W R T Total Energy Calorimeter Concept Energy Absorbed in 500um Silicon (0.01% FEL+Spontaneous) Cooler CMR Sensor Xray Beam Sapphire heat sink Si or Be 1x1x.5 mm SINDA T vs. t Direction of heat flow CMR W vs T Electrothermal Feedback: Apply constant V Measure I Calculate P Cool Down Time is about 0.6 ms
TTF Damage experiment set to test models at 40 eV Sample cassette
XTOD work flow will follow ISMS practices for each WBS element WBS Dictionary LCLS Physics Requirements ICDs IWS (Integrated Work Sheet) is LLNL wide e-form for documenting ISMS for each work package: Scope Hazards Controls Roles (RI…) Responsibilities Training Signoff Hardware Installation Operations Servicing ERDs Designs Eng. Safety Notes Certified Parts Lists
Short term IWS: Cover Prototype development and testing, offsite and on-site: Gas Attenuator prototype in B132 (in progress) Direct Imager B272, SSRL X-Ray Box tests … Drive Laser R&D, B480 Add SLAC personnel to IWS + training Long Term IWS: Cover Each WBS deliverable: Fabrication & Assembly Bench testing Transport to SLAC Installation Commissioning Operation Servicing IWSs for LCLS XTOD Prototypes and WBS Elements
FY05 Goals • Mechanical and Vacuum • Cost estimate and Engineering Plan through NEH • IWS's, ICD's, and ERD's • Detailed plans / parts for prototype: • Gas Attenuator, Control system tests, concepts for monitoring beam and attenuation • Total Energy, 1 pixel • Direct Imager, for 826 eV tests at SSRL • Monte-Carlo simulations of FEE instruments and alignment • Document in ERDs • Apertures, Expected light levels, Reflectivity, …
FY05 Goals (cont.) • Conceptual designs and sample optics for • Indirect Imager • Spectrometer • Controls • Cost estimate and Engineering Plan • Prototype Controls • Gas Attenuator • Direct Imager • TTF Damage Experiment • Samples Fabricated and Documented
Other XTOD presentations this week • XTOD Controls - Steve Lewis in Controls breakout session • XTOD Front-End Instrumentation - Bionta in Photon breakout session • Also available during breakout sessions: • Don McMahon - XTOD Project Engineering • Elden Ables - Imaging Cameras, Total Energy • Linda Ott - XTOD Beam Modeling and Imaging Software Release • Stewart Shen - Gas Attenuator • Dmitri Ryutov - Thermal deformation sensor
XTOD Overview Summary • FY05 staffing plan implemented • FY05 work plan begun • Near term emphasis on Commissioning and FEE