An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Long termpoliciesforoperatingroom planning A. Agnetis1, A. Coppi1, G. Dellino2, C. Meloni3, M. Pranzo1 1Dept. of Information Engineering, Universityof Siena, Italy 2 IMT InstituteforAdvancedStudies, Lucca, Italy 3Dept. ofElectronics and ElectricalEngineering, Polytechnicof Bari, Italy

  2. Outline • Introduction • Problemdescription • Optimizationmodels and heuristics • Case study • Preliminaryresults • Conclusions

  3. Introduction • Operatingtheatre (OT) among the mostcriticalresources in a hospital • Significant impact on costs • Affectsqualityof service • Improve the efficiencyof the OT management process • Focus on operatingroom (OR) planning

  4. Decisionproblemsin OT management MSSP SCAP Tue Wed Thu Fri Mon OR1 ESSP OR2 OR3 OR4 Gynecology Urology Daysurgery Generalsurgery Otolaryn-gology Orthopedicsurgery OR5 ____________________ ____________________ ____________________ ____________________ ____________________ ____________________ OR6

  5. Organizationalcomplexityvs. MSS variation • Staffing and shift planning • MSS fixedovertime ↑ stability, ↓ flexibility • MSS differentevery week  ↓ stability, ↑ flexibility

  6. Maincontributions • Alternative policiesproposedtotrade off efficient management of the surgerywaitinglists and organizationalcomplexity • MSSP and SCAP solvedthroughmathematicalprogrammingmodels and heuristics • Performance evaluationoverone-yeartimehorizon • Assumptions: • Deterministic data • Electivepatientsonly

  7. Problemdescription (1) • Input: waitinglistofelectivepatientsforeachsurgicalspecialty • Data foreach case surgery in the list: • Output: one-weekassignment (Mon-Fri) ofelectivesurgeriestoORs Waitinglist – Daysurgery Surgery code Surgeryduration (min) Priorityclass Entrancetime Waitingtime (days) Due date 6210 28 B 15/06/2010 27 15/08/2010

  8. Problemdescription (2) • OR sessions: morning/afternoon/full-day • Assignmentrestrictions • Objectives: • Max ORsutilization, withoutovertime • Schedule case surgerieswithintheirdue-date, reducingpatients’ waitingtime based on case surgeriesduration and a score, relatedto: • case surgerywaitingtime and priorityclass • case surgeryslacktime

  9. Optimizationmodels ILP mathematicalformulations, solvedby CPLEX • Unconstrained MSS model Determines MSS and SCA every week, based on the actualwaitinglistforeachspecialty • Constrained MSS model Determines MSS and SCA, bounding the numberofchanges in OR sessionassignmentstodifferentsurgicalspecialtiesw.r.t. a reference MSS • Fixed MSS model Determines SCA, givenan MSS

  10. Unconstrained MSS model • ‘Unconstrained’ w.r.t.long-term planning • Constraints • Bounds on the numberofweekly OR sessionsassignedto a specialty • MinnumberofORsassignedto a specialtyeveryday (eitherhalf-day or full-daysessions) • Max numberofparallel OR sessionsforeachspecialty • Restrictions on specialty-to-ORassignments • Max OR sessionduration (no overtime)

  11. Constrained MSS model • ‘Constrained’ w.r.t.long-term planning • Block time = # weeksduringwhich the MSS isfixed • Set a reference MSS • Distance (Δ) betweentwoMSSs: # ORsforeachday and sessiontypeassignedtodifferentsurgicalspecialties in the MSSs • Oneconstraintaddedto the previousmodel, boundingsuch a distancebetween the new MSS and the reference MSS

  12. Fixed MSS model • The MSS hasbeenalreadydetermined OR sessionsalreadyassignedtosurgicalspecialties • Assignmentof case surgeriesto OR sessions; i.e., SCAP issolved

  13. Heuristicmethods MSSP OR sessions = bins; Surgeries = items • Candidate OR sessions (half-day/full-day) foreachspecialty→first-fit-decreasingrule • Selectionof candidate sessionsassignedto OR • MSS isretained, discardingallsurgicalcasesfillingit SCAP

  14. Planning policies Unconstrained MSS model MSSP SCAP Exactly solved Exactly solved Constrained MSS model Heuristically solved Heuristically solved Δ = 1, block = 1 Δ = 2, block = 4 Fixed MSS model

  15. Case study: OT characteristics Medium-size public Italian hospital (Empoli, Tuscany) • OT = 6 operatingrooms; twoORs are bigger • 6 surgicalspecialties: generalsurgery, otolaryngology, gynecology, orthopedicsurgery, urology, daysurgery • Surgicalspecialtyrestrictions • Gynecologymustuse the same OR for the whole week • Orthopedicsneeds big ORs • Twoparallel OR sessions can bebothassignedtogeneralsurgery (the samefororthopedics) • Furtherrestrictions • One OR quicklymadeavailable, everymorning • One OR free everyafternoon

  16. Case study: experimental design • MSSP and SCAP solvedevery week • Simulationoveroneyear • Weeklyarrivals: • nonparametricbootstrappingfrom the initialwaitinglist • sample sizefrom a uniformdistributioncenteredaround the averageweeklyarrival rate • Twoscenariostested: base/stressed scenario

  17. PreliminaryresultsBase scenario f1 f2

  18. PreliminaryresultsStressed scenario f1 f2

  19. Preliminaryresults • Stabilityof the MSS • The unconstrained MSS modelhasanaveragedistancebetweentwoadjacent MSS of 12-13  20% of the MSS changesfromone week to the next • Worst case: 67% changes in the MSS • Trade-offprovidedby the constrained MSS model

  20. Conclusions • Long-termevaluationof alternative policiesfor OR planning ofelectivesurgeries • Simulation on a real case study (medium-size public hospital in Italy) • Promisingresultstoimprovewaitinglists’ management • For future research: • Surgeons and resourcesavailabilityconstraints • Differentobjectivefunctions and policies • Uncertainty on surgeryduration and surgeryarrivals

  21. Unconstrained MSS modelMathematicalformulation

  22. Constrained MSS • ‘Constrained’ w.r.t.long-term planning • Block time = # weeksduringwhich the MSS isfixed • Set a reference MSS • Distance (Δ) betweentwoMSSs: # ORsforeachday and sessiontypeassignedtodifferentsurgicalspecialties in the MSSs • Oneconstraintaddedto the previousmodel, boundingsuch a distancebetween the new MSS and the reference MSS

  23. Fixed MSS modelMathematicalformulation