1 / 10

Phase 3: Scheduling and Cost Estimate

Phase 3: Scheduling and Cost Estimate. Provide the following: Detailed Project Schedule: Bar Chart Cost Estimate List of Trades Construction Process. Scheduling and Cost Estimate Process:. Task. Scope of Work (Drawings and RFP).

eyal
Download Presentation

Phase 3: Scheduling and Cost Estimate

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Phase 3: Scheduling and Cost Estimate Provide the following: Detailed Project Schedule: Bar Chart Cost Estimate List of Trades Construction Process

  2. Scheduling and Cost Estimate Process: • Task • Scope of Work (Drawings and RFP) Identify all scope of work items for the Project (Design work, Site preparation, Removals, Installation, etc) Identify all construction activities (Task) for each item • Task

  3. Scheduling and Cost Estimate Process (cont’d): • Line Item • Labor Break Tasks into more specific Line Items Identify materials and labor needed for each item Determine material costs and labor wages Determine Construction expenses (Profit, Professional Fees, etc) Bring the information together: Summary of all costs Schedule for all tasks • Task • Line Item • Mate-rials • Line Item

  4. CSI Divisions: Master Format • Minimum: • General Requirements • Metals • Openings • Finishes • arch tool box

  5. Detailed Bar Chart: Project Schedule • CPM (Critical Path Method)- Project network logic diagram, calculates the longest path and the latest/earliest start dates • List all activities required to complete the project • Time or duration the activity will take to complete • Dependencies between activities

  6. Detailed Bar Chart: Project Schedule • Ghant Chart • Scope of work • CSI Divisions • Hierarchy • Duration • Start and Finish dates • Relationship between work items

  7. Cost Estimate • Scope of Work (CSI Division Format) • Units • Materials • Labor • Allowances • Equipment

  8. Cost Estimate • Summary • Professional Expenses • General Conditions • Overhead & Profit • Totals *Use CSI Division Format*

  9. List of Trades • Wage Determinations • Department of Labor • WageDeterminationsOnLine.GOV

  10. Cite all Sources! Cite all Sources! Cite all Sources! • MLA Format • In-Text Citations • Footnotes • Works Cited Page