A NEW APPROACH
WHAT CAUSED THE MAINE DOT TO CONSIDER CBE? • LACK OF COMPETITION • VOLITILE MATERIAL COST • LACK OF FUNDING • CONTRACTOR TAKING ADVANTAGE OF LUMP SUM ITEMS AND ERRORS IN PLANS • INCREASE IN NUMBER AND COST OF CONTRACT MODIFICATIONS
WHY SHOULD MAINE DOT USE CBE
Reviewing the plans for constructibility will create better plans and will result in better prices. • Increase Credibility of the Department • Review and Verify bid Quantities and Specifications • Market Analysis • Material Cost Analysis • Review Contract Documents from Consultant Design Firms • Assist in the defense of claims • Ability to question contractors bidding practices • Train MDOT designers and construction personnel • Assist Residents in validating contract modifications
EXAMPLES OF MAINE DOT COST BASED ESTIMATING
Cost Estimate Report The additional estimated cost of using PGAB 58-34 in lieu of the traditional PGAB 64-28 for a MDOT project located in Jackman and Long Pond TWP, Maine. February 2006
AN EXAMPLE OF A SUBTLE UNBALANCE BID; A $10 MARK-UP COST $30,000 THE 3,000 HRS OVER-RUNS 37% TO 4,167 HRS THE $30,000 INVESTMENT RESULT IN A $41,670 RETURN
206.061 Structural Exc-Below Grade; 5,850 cy @ $8/cy = $46,800