What Happened

Learning points: IP deviated from the set scope of the maintenance IP used non insulated tools Recommended Actions: Always use electrical insulated tools when working on live electrical equipment

fay
Download Presentation

What Happened

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Learning points: IP deviated from the set scope of the maintenance IP used non insulated tools Recommended Actions: Always use electrical insulated tools when working on live electrical equipment Never deviate from the pre-set scope of the maintenance and if necessary carry out hazards identification before proceeding Discuss this alert in HSE meetings and Tool Box talks and Distribute to your contractors Post on HSE notice boards Include in your HSE induction  What Happened A certified Competent Electrical Person (CEP) isolated the electrical control panel in an attempt to carry out routine maintenance as per maintenance craft procedure The control panel was isolated by turning off the main switch and removing the fuses of the 415 V panel feeder During the maintenance activity the IP decided to clean the live terminal upstream switch using a non-insulated paint brush The metal sleeve of the brush touched the live electrical terminals causing electrical flashover which resulted in burns to the IP Contact MSE511 for further information or visit HSE website Alert No 04 June 2010

More Related