1 / 13

Review meeting 05 th December

Review meeting 05 th December. Status WP2 – iCargo Components. Status WP2. Deliverable D2.1 – Final completed Technical workshops (Madrid, Amsterdam) Dissemination: White papers for eFreight 2012 InnoTrans 2012 in Berlin ITS Vienna 2012 Several workshops for clients. D1.1.

felice
Download Presentation

Review meeting 05 th December

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Review meeting 05thDecember Status WP2 – iCargo Components

  2. Status WP2 • Deliverable D2.1 – Final completed • Technical workshops (Madrid, Amsterdam) Dissemination: • White papers for eFreight 2012 • InnoTrans 2012 in Berlin • ITS Vienna 2012 • Several workshops for clients

  3. D1.1 Policy, Market and Technology survey WP1 iCargo detailed requirements D1.2 D1.5 Consolidated high-level requirements WP2 D2.2 Cloud resources, Semantic services & semantic tools iCargo Components design D2.3 Knowledge base infrastructure & tools D2.1 D2.1 D2.1 D2.1 Final Preliminary version D2.4 Mobile infrastructure & semantic gateways WP3, 4 D3.1 Specification of orchestrated iCargo application objects D4.1 iCargo Infrastructure architecture and design

  4. Business (driven) vision 1 Technical vision • Semantic interoperability • Common Framework Interpretation of data • Seamless connectivity • Controlled & secure access Accessibility of data 2 • Entity-centric approach • Reduction of complexity Organisation of data

  5. Logistic chain composition External devices External services iCargo Applications and services Access point Access point Access point iCargo Generic components Logistic network awareness Semantic gateway Semantic Tooling Emission monitoring Entity repository Entity discovery Semantic models Service registry Distributed storage Service repository Semantic repository e.g. Common Framework Hybrid service network Lifecycle management Service provisioning Service orchestration Service authorisation Resource management iCargo IT infrastructure

  6. Logistic chain composition External devices External services iCargo Applications and services Access point Access point Access point iCargo Generic components Logistic network awareness Semantic gateway Emission monitoring Semantic Tooling Entity discovery Entity repository Service repository Semantic repository Hybrid service network Lifecycle management Service provisioning Service orchestration Service authorisation Resource management iCargo IT infrastructure

  7. Onboard Unit Local Access Point, Semantic gateway, Entity centric services

  8. Logistic chain composition Semantic models Entity discovery Entity repository Emission monitoring Logistic chain awareness Onboard Unit Service registry Distributed storage Semantic repository

  9. Questions ?

  10. Business (driven) vision [D1.1] 1 3 Technical vision [D2.1] Technical capabilities [D2.1] Business requirements [D1.2] User requirements [D5.x] + + 2 System Requirements

  11. Logistic chain composition Coop X+Y Y X Organisation Logistic service Logistic demand BSD Sx BSD DY Services Place B Cargo Box-12345 Truck 25-KGJ-8 Emission monitoring Order X-YYY Transaction C A Trip A->B B Execution

  12. Logistic chain composition External services Coop Z+Y Coop X+Y Coop Z+Y iCargo Applications and services BSD Sx Org Z BSD Sx Org X Org Y BSD Sx BSD DY Access point Access point Org Z Access point Place D Place D Place Vessel Cargo Box-12345 Train 25-KGJ-8 Truck 25-KGJ-8 iCargo Generic components Semantic gateway Emission monitoring Order Z-9999 Order X-YYY Order X-YYY Trip C->D Trip C->D Trip A->B

  13. Next steps • The detailed technical specification of the interfaces • Dependencies on other work-packages results • Continue to organise technical workshops • Tomorrow: Scenario’s + Semantic Architecture • More intense participation is welcome • Strong dependency on Semantic architecture and tooling in particular.

More Related