1 / 6

Job Performance Requirement 10-17

Job Performance Requirement 10-17. Horseshoe Load. A Start the load at a rear corner of the hose bed with the hose on its side. JPR 10-17A. B Lay the hose toward the front wall of the hose bed and then along the wall to the other side and back toward the rear. JPR 10-17B.

feo
Download Presentation

Job Performance Requirement 10-17

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Job PerformanceRequirement 10-17 Horseshoe Load

  2. A Start the load at a rear corner of the hose bed with the hose on its side. JPR 10-17A

  3. B Lay the hose toward the front wall of the hose bed and then along the wall to the other side and back toward the rear. JPR 10-17B

  4. C At the rear, fold the hose alongside itself and head back to where it started. Fold it again and another “U” is formed. JPR 10-17C

  5. D When the bed is filled, start a new layer by laying the hose flat on its side and continue to the front of the bed. Continue the hose down the side of the bed toward the rear, or JPR 10-17D

  6. E lay a few flakes of hose on top longways for quick access. Attach a hose strap, ball valve, hose bag, or other set of appliances or devices deemed necessary for quick deployment. JPR 10-17E

More Related