REVITALIZACIJA SISTEMA ZAŠTITE I UPRAVLJANJA U 400kV TRAFOSTANICAMA CGES-a. Ivan Asanović, Ivan Bulatović CGES A.D. I.Višić, S.Smoljo, D.Poljak, Pro Integris d.o.o. Denis Bukva SIEMENS AG

fern
Download Presentation

REVITALIZACIJA SISTEMA ZAŠTITE I UPRAVLJANJA U 400kV TRAFOSTANICAMA CGES-a

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. REVITALIZACIJA SISTEMA ZAŠTITE I UPRAVLJANJA U 400kV TRAFOSTANICAMA CGES-a Ivan Asanović, Ivan Bulatović CGES A.D. I.Višić, S.Smoljo, D.Poljak, Pro Integris d.o.o. Denis Bukva SIEMENS AG Marko Tasić Institut Mihajlo Pupin III. savjetovanje CG KO CIGRÉ, Pržno, 13. - 16. 05. 2013.

  2. DINAMIKA PROJEKTA 2011. – Objava tendera za projekat rekonstrukcije zaštita i upravljanja u postrojenjima 400 kV i 400/x kV Crnogorskog elektroprenosnog sistema (CGES), 2011- početak 2012. – Izrađen i revidovan Glavni projekat rekonstrucije zaštita i upravljanja u 400 kV i 400/x kV postrojenjima. 2012. – Radovi na postrojenjima 2013. Dostavljena dokumentacije izvedenog stanja III. savjetovanje CG KO CIGRÉ, Pržno, 13. - 16. 05. 2013.

  3. OPSEG PROJEKTA • Radovi u TS Podgorica 2, TS Pljevlja 2 i TS Ribarevine, • Ugradnja 16 ormara upravljanja i 10 ormara • zaštite, • Prežičenje i adaptacija već postojeća 4 ormara zaštite, • Parametriranje postojećih SCADA sistema, • Releji proizvođača SIEMENS, generacije SIPROTEC 4. III. savjetovanje CG KO CIGRÉ, Pržno, 13. - 16. 05. 2013.

  4. KONCEPCIJA SISTEMA NADZORA I UPRAVLJANJA • U ormar upravljanja ugrađena je upravljačka jedinica 6MD66 i mjerni pretvarači 7KG, • Upravljačka jedinica prikuplja mjerenja i signale iz polja, obrađuje ih, vizualizuje po potrebi i, optikom po protokolu IEC 61850, prosljeđuje lokalnoj SCADA-i, • - U sve tri transformatorske stanice uveden je jednak princip upravljanja prikazan u tabeli. III. savjetovanje CG KO CIGRÉ, Pržno, 13. - 16. 05. 2013.

  5. PRINCIP UPRAVLJANJA U TRANSFORMATORSKIM STANICAMA III. savjetovanje CG KO CIGRÉ, Pržno, 13. - 16. 05. 2013.

  6. KONCEPCIJA SISTEMA NADZORA I UPRAVLJANJA • - Ethernet switchevi, optički i ethernet kablovi su okosnica komunikacione infrastrukture, • Veza između SCADA sistema i distribuiranih upravljačkih jedinica i zaštitnih releja ostvarena je protokolom IEC61850. • Svi SIPROTEC uređaji ugrađeni u relejnim kućicama opremljeni su dvostrukim optičkim portom koji omogućava komunikaciju u optičkoj petlji („prsten”). III. savjetovanje CG KO CIGRÉ, Pržno, 13. - 16. 05. 2013.

  7. TS Podgorica 2 • SCADA proizvođača Siemens, • 2 SICAM PAS sistema u redundantnoj izvedbi; • Svaki od SICAM PAS sistema prikuplja informacije od zaštitnih releja i upravljačkih jedinica u polju nezavisno jedno od drugog, • Svaki od sistema komunicira s relejima zaštite i upravljačkim jedinicama po IEC61850 protokolu dok je za vezu prema nadređenom centru upravljanja predviđen komunikacioni protokol IEC 60870-5-101. III. savjetovanje CG KO CIGRÉ, Pržno, 13. - 16. 05. 2013.

  8. III. savjetovanje CG KO CIGRÉ, Pržno, 13. - 16. 05. 2013.

  9. TS Pljevlja i TS Ribarevine • Adaptirane postojeće IMP SCADA-e prema novom sistemu zaštite i upravljanja, • Akvizicija pogonskih podataka iz procesa se obezbjeđuje kroz komunikaciju s “procesnim stanicama”, • Prikupljeni pogonski podaci iz procesa se prosljeđuju VIEW2 Serveru, gdje se skladište i čuvaju u memorijski rezidentnoj bazi podataka RTDB. III. savjetovanje CG KO CIGRÉ, Pržno, 13. - 16. 05. 2013.

  10. TS Pljevlja i TS Ribarevine • Hardverska platforma uz pomoć koje je realizovana konverzija protokola iz IEC 61850 u IEC 60870-5-101 je RTU (Atlas-Max-RTL), • Atlas-Max-RTL uređaj se s jedne strane nalazi na IEC 61850 prstenu odakle prikuplja podatke iz postrojenja, dok se sa druge strane nalazi na zasebnoj mreži (nadređeni centar – SCADA) gde prosleđuje prikupljene podatke po IEC 60870-5-101 III. savjetovanje CG KO CIGRÉ, Pržno, 13. - 16. 05. 2013.

  11. III. savjetovanje CG KO CIGRÉ, Pržno, 13. - 16. 05. 2013.

  12. III. savjetovanje CG KO CIGRÉ, Pržno, 13. - 16. 05. 2013.

  13. KONCEPCIJA SISTEMA ZAŠTITE III. savjetovanje CG KO CIGRÉ, Pržno, 13. - 16. 05. 2013.

  14. ZAŠTITA VODA • Uzdužna diferencijalna / distantna zaštite 7SD52 glavna zaštita, • Distantna zaštita 7SA rezervna zaštita, • Oba releja imaju uspostavljenu komunikaciju pomoću optičkih vlakana s identičnim relejima na drugoj strani voda za potrebe komunikacije diferencijalne zaštite voda, kao i za ubrzanje distantne zaštite prilikom prorade u prvom stepenu, te usmjerene zemljospojne zaštite. • Jedinica polja sabirničke zaštite 7SS523 III. savjetovanje CG KO CIGRÉ, Pržno, 13. - 16. 05. 2013.

  15. ZAŠTITA TRANAFORMATORA • - Diferencijalna zaštita transformatora 7UT61 • glavna zaštita, • Prekostrujna zaštita 7SJ80 na 400kV strani, • Distantna zaštita transformatora 7SA61 na • 110kV strani, • Prekostrujna zaštita 7SJ80 na 110kV strani, • Jedinica polja sabirničke zaštite 7SS523 III. savjetovanje CG KO CIGRÉ, Pržno, 13. - 16. 05. 2013.

  16. ZAŠTITA U SPOJNOM POLJU / ZAŠTITA SABIRNICA • - Prekostrujna zaštita 7SJ612 spojnog polja, • Jedinica polja sabirničke zaštite 7SS523, • Distribuirana zaštita sabirnica i zaštita od otkaza prekidača 7SS52 • Optikom je povezana sa svim jedinicama polja. • Sakuplja mjerenja i informacije, obrađuje ih te prosljeđuje naloge za isklop pojedinog polja. III. savjetovanje CG KO CIGRÉ, Pržno, 13. - 16. 05. 2013.

  17. ZAKLJUČAK Rezultati projekta: Sigurnije upravljanje visokonaponskom opremom sa svih komandnih pozicija u trafostanici, a samim tim veću bezbijednost pogonskog osoblja. - Upravljanje aparatima u 400 kV postrojenju preko komandne table sa svim žičanim blokadama je zadržano, tako da se očuvala i dosadašnja koncepcija upravljanja. III. savjetovanje CG KO CIGRÉ, Pržno, 13. - 16. 05. 2013.

  18. ZAKLJUČAK Rezultati projekta: Integracijom novougrađene opreme u lokalni SCADA sistem omogućeno je upravljanje kompletnom opremom u rekonstruisanim poljima, kao i prenos svih signala iz polja do lokalne SCADA-e protokolom putem optičkih kablova. Na ovaj način je lokalni SCADA sistem dobio svoju punu funkcionalnost, a integracija u budući RDC(Rezervni dispečerski centar)-SCADA sistem biće jednostavnija, III. savjetovanje CG KO CIGRÉ, Pržno, 13. - 16. 05. 2013.

  19. ZAKLJUČAK Rezultati projekta: Upravljanje prekidačima 400 kV u polju iz NDC-a preko upravljačkih jedinica polja, uz ispitivanje svih blokadnih uslova i integrisanom funcijom sinhronizacije prilikom uključenja, Zadržan je postojeći koncept položajne signalizacije prekidača za prenos u NDC, ali je zato ugradnjom redudantnih mjernih pretvarača u poljima obezbijeđen pouzdaniji rad postojećeg NDC-SCADA sistema. III. savjetovanje CG KO CIGRÉ, Pržno, 13. - 16. 05. 2013.

  20. HVALA NA PAŽNJI! III. savjetovanje CG KO CIGRÉ, Pržno, 13. - 16. 05. 2013.