1. Senior Personnel - RNMC. Senior personnel have an average of 22 years mine experience.Goal is to have all process personnel in place by November 1st.Benefits will average around 35%.. . 2. Environmental. PermittingAll permits in place. Groundwater permit NEV92105 currently under renewal by State of Nevada.Use of Liberty Pit for short-term mine waste backfill under development with submittal to NDEP before October 30, 2004. Demonstration will involve a modification to the current Waste M34434
E N D
1. 0 Quadra Mining Limited
Robinson Nevada Mining Company
September 30, 2004
2. 1 Senior Personnel - RNMC
3. 2 Environmental Permitting
All permits in place. Groundwater permit NEV92105 currently under renewal by State of Nevada.
Use of Liberty Pit for short-term mine waste backfill under development with submittal to NDEP before October 30, 2004. Demonstration will involve a modification to the current Waste Management Plan which will also address mine dump development and concurrent dump closure.
4. 3 WEEKLY MINE PERFORMANCE (YTD, 2004)ROBINSON MINE
5. 4 Budget / LOM Plan 2004-2014Metric
6. 5 MINE OPERATIONSWorking Equipment Schedule
7. 6 Production Fleet – Robinson Mine
8. 7 Production Fleet – Robinson Mine
9. 8 Production Fleet – Robinson Mine
10. 9 Production Fleet – Robinson Mine
11. 10 Production Fleet – Robinson Mine
12. 11 Production Fleet – Robinson Mine
13. 12
14. 13
15. 14 MANPOWER RAMP-UP SCHEDULEWGN Mining Contractor
16. 15 Mining Contract -- Washington
17. 16 Mill Projects Improvements and Recommissioning Prior to Start-up
Replaced bucket conveyor with conventional conveyor.
Updated process control instrumentation.
Completed tailings dam extension.
Aligned SAG and ball mill gears.
Replaced bus bars for 480 volt transformers.
Replaced concave and mantle liners at primary crusher.
Re-spliced all conveyors.
Replaced trommel screens on Sag and Ball Mills
18. 17
19. 18
20. 19 Mill Production Actual Production
First mill production August 31, 2004.
Over 600,000 tons milled through 9/28/04.
Over 5,000 tons of concentrate produced through 9/28/04.
Full mill production during October, 2004.
Gravity gold circuit to be operational November, 2004
21. 20
22. 21
23. 22
24. 23 Concentrate Haulage From Mine Site to PortCURRENT STATUS
25. 24 Quadra Mining Limited
Robinson Nevada Mining Company
September 30, 2004