An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of Beamline Design / CommissioningMICE-VC K. Tilley, MICE-VC, 10/05/07

  2. Plan Status of Beamline Design

  3. Design • Some additional comments received re: Response to BL review. Aim to include & get response to PD/Tech Board next week. To reviewers 25th?

  4. Efforts to establish a trustworthy model of the Beamline (i) Design Pre-CM17 case … Downstream lattice:: List of possible causes Current

  5. Efforts to establish a trustworthy model of the Beamline (ii) Design Strategy: - to aid cleaner interpretation Needs focussed code/processing time. Have ~2.5weeks to milestone. Mainly KW/fraction of KT. Do need others actively involved.

  6. Optimisation Design • Albeit code comparison ongoing – - techniques being exercised to produce (6,200) in G4BL - being undertaken by Dazhang Huang (IIT) & Tom (MuonsInc)

  7. Pre-commissioning: Magnet tests Commissioning - Extensive discussion on dipole/quad magnet tests/method important measurements: polarities of magnets current to field relationship magnetic alignment: need simple tools to check field centres; Standardisation procedure? ideal measurements: field quality/uniformity effective length - Outline above needs-> new doc? (KT) - Need to identify individual now. to help drive this through (jig design/kit &/or measurements) requires 3xjigs & kit for July measurements. - Need to confirm workshop now to produce eqpt. FOR July. (possibly ISIS w/shop / but…?) - Decay solenoid?

  8. Online prePhase1 beam commissioning planning: Commissioning - At time of writing we (BL group) have made ~ 2 separate, incomplete run plans.- + initial discussions with RIKEN people re: commissioning RIKEN/ISIS beamline • -Forward planning has been insufficient attention. • Intention to begin deeper focussed discussions this week (Friday 11th May 10:30 BST): all welcome • Hope to have at least outline, complete plans for discussion at CM18 by MICE.

  9. Basic beam monitors: Commissioning - Already established need 2x detectors- Applications: Upstream: Beam present / flux Beam size / centre (esp. vertically) BBA still being discussed Downstream: Beam present / flux Beam size / centre (mainly for gross errors) BBA still being discussed - Specifications: Upstream: Size ~20x20cm suitable : Resolution ~ 6mm ok for flux/ctr/size (1mm if BBA). Build with 1mm’s : Rates: order of magnitude estimate for nominal case ~10^9Hz inst : Fields: given Downstream: Size ~ 44.8x44.8cm suitable : Resolution ~1.4cm ok for flux/ctr/size (1mm if BBA). Build with 1mm’s : Rates: order of magnitude estimate for nominal case. ~10^8Hz inst : Fields: given Final readout solutions for both monitors in development.

  10. Plan + progress along these items… Status of Beamline Design

  11. Basic Beamline monitors Supplementary re: detectors Specification / applications Upstream: Main home Measure at Nominal pos: Beam PresentBeam FluxAverage y centre/sizeSpeculative within Quads (fault finding) Beam Present/flux u/str No concensus yet on BBA. Difficult here. (-> a later detector if rqd?) Poss v. temp locations (fault finding/startup?) Size: 20x20cm good(beamsize Y<=12cm @ nom posn)Fields:max 130Gauss verticallyRate estimate (TJRcm7): (mostly protons). Nominal target dip, assumptions etc -> ~ 1x10^6/ms (believed spread evenly over whole 15.2x112cm area) Upstream

  12. Basic Beamline monitors Supplementary re: detectors Specification / applications Downstream Main home Commissioning / fault finding locations Measurements:Beam PresentBeam FluxGross errors in position etc No concensus yet on BBA. (-> a later detector if rqd?) Size: 44.8x44.8cm good(mostly covers Q35 aps)Fields:max 190Gauss vertically(if Decay Sol<->B2)Rate estimates: - see next slides`

  13. Basic Beamline monitors Rates: Estimated based on G4BL TOF0 CM14-6-200 Rate (3.22MHz): - which usesnormal target insertion, production & normalisation assumptions………..Then using Turtle pion+muon local fluxes & scaling 3.22MHz appropriately.Note the figure is for beam over all area. If a second (lower) figure given – this is implies the rate for the smaller 44.8x44.8cm is as given & is lower. Supplementary re: detectors: d/str rate ests Specification / applications Downstream Main home Commissioning / fault finding locations Before C2H4 (protons included): pi+mu ~ 1212MHz After C2H4 (protons removed): pi+mu ~ 121MHz b4t0: pi+mu ~ 3.22MHz b4Q5 : pi+mu ~ 5.6MHz b4q8: pi+mu ~ 2.0MHz @MICE: pi+mu ~ 1.69 MHz b4Q4 : pi+mu ~ 116MHz(~115MHz 44.8x44.8cm) b4q9: pi+mu ~ 1.78MHz b4q7: pi+mu ~ 3.18MHz(~3.16MHz 44.8x44.8cm) b4Q6: pi+mu ~ 3.8MHz