An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PipelinersAdding Value Wayne Sartore Vice President Northern Pipeline Development Enbridge Inc. Resource Development Council 22nd Annual Conference November 29, 2001 Anchorage, Alaska

  2. Enbridge:North & South America

  3. Pipeline Transportation End User Exploration & Production Gas Treatment EnergyValueChain Enbridge

  4. Customer requirements Customer Service • Safety Excellence • Environmental Stewardship • Cost Effective • Reliability of Operation • Stakeholder Relations • Creative and Innovative • “World Class” Service

  5. PrudhoeBay Anchorage Inuvik Whitehorse Norman Wells Yellowknife Edmonton “Northern” Pipeline Challenges Unique “Northern” P/L Issues • Capital Cost • Geography, Remote Access • Permafrost Enbridge Northern Expertise • Norman Wells Pipeline • Inuvik Gas Experience Applied to the Future • Sub-surface construction in permafrost • Pipeline integrity monitoring • Innovative cost reduction opportunities Enbridge is route neutral

  6. Northern Expertise • Built 1985  only major pipeline in NWT Alaska Inuvik • Right-of-Way =869 km(540 mi) • Pump stations = 3 • Pumps = 6 • Employees = 20 • 2000 payroll = $1.5M • 2000 capital costs = $568,000 • 2000 property taxes = $1.4M • 2000 power costs = $760,000 Norman Wells Norman Wells Pipeline Zama

  7. Northern Expertise • Involved in production, processing, transmission and distribution of northern natural gas to town of Inuvik. Alaska Inuvik Gas Cdn $44 million project: • Two wells • Production facility • 50 kilometre pipeline • 25 km distribution system • 500th customer Aug. 2001 • Owners • Inuvialuit Petroleum Corp. • AltaGas Services • Enbridge Inuvik Norman Wells Zama

  8. Northern Pipelines - Operations • Integrity Management in permafrost • Geo-pig % Strain vs. Time for Slope 92 3.5 3 2.5 2 Strain 1.5 1 0.5 0 1988 1990 1992 1994 1996 1998 2000 Year

  9. Northern Pipelines - Operations • Geo-pig • scheduled pipeline repair

  10. Northern Pipelines - Maintenance • access equipment • pipeline repair techniques

  11. The “Measured Approach” Build two smaller lines “consecutively” in the same right-of-way

  12. The “Measured Approach” BENEFITS • Cost estimates 48-inch vs. 2x36-inch within 7% • Reduced project risks • Socio-economic benefits • Improved schedule for first gas to market • Pipeline capacity better matched to market needs Build two smaller lines “consecutively” in the same right-of-way

  13. Success requires: • Continental decision-making • Robust project economics • A Producer decision to proceed • Common understanding • Cooperation of all stakeholders

  14. PipelinersAdding Value Wayne Sartore Vice President Northern Pipeline Development Enbridge Inc. Resource Development Council 22nd Annual Conference November 29, 2001 Anchorage, Alaska