Damien Tan Andreas Toh Roy Chia Tavence Heng. DART Jetpack. The DART Jetpack project was started by 4 engineers in 2010. They wanted to merge business with engineering in their venture by trying to market their jetpack using skills learnt from Project Management. Introduction.
E N D
Damien Tan Andreas Toh Roy Chia TavenceHeng DART Jetpack
The DART Jetpack project was started by 4 engineers in 2010. They wanted to merge business with engineering in their venture by trying to market their jetpack using skills learnt from Project Management. Introduction
Improve convenience in human lives Military usage Project Objectives
Estimated duration -Research (3mnths) -Brainstorm (1Month) -Planning/blueprint stage (2months) -Miniature Model (1month) -Trouble shooting (1month) -Prototype stage (2years) Scope of Project
Estimated cost -Planning stages $50 -Prototype stage $1000 Scope of Project
Responsibility matrixProject leader DamienDesigner AndreasAccountant RoyScheduler Tavence Responsibility matrix
Choose which way to start the jetpack - Fan - Chemical Reactions - Hydro Logistical problem Budget constraint Technological problems/inability Safety issue Jetpack stabiliser problems Human testing Current Issues
Overall In-charge Researcher Planner Operational In-charge Marketer Sales person Technician Logistics In-charge Production In-charge Safety In-charge Manpower requirements
Resources, $1,240,305.00 Human Resource, Manpower, $ 165,000.00 Marketing , $ 50,600.00 A.O.M, insurance, $ 110,000.00 Total Budget $ 1,565,905.00 Cost Analysis
Number of workers 100 Price per jetpack $5,000 Life time company insurance Hiring of Public Relations Staff in media coverage Jetpacks sold per month 500 Amount of jetpacks made per month 500 Material cost per jetpack $2,000 The budget cost is per monthly basis sell to retailer to sell to public 10% contingency Total Income $ 2,500,000.00 ROI 60% Assumptions
Scheduling the Project Time Microsoft Office Project Project Scheduling Listing the tasks Placing them according to tasks and sub tasks Placing them according to prerequisites Inserting the estimated Time for the tasks Generate the Gantt chart
Activity-On-Node (AON) Easier to see the Time allocation Easier to see the Predecessors. AON
Earliest Start Time (EST) : the early start of a project • Duration : how long will this project completes • Earliest Finish Time (EFT): EST + duration • Latest Start Time (LST) : the latest time a project can start • Latest Finish Time (LFT) = LST + duration • Total Float = LFT – EST – duration AON 2 1 3 Create Prototype 6 4 7
OUR AON -It took us 153 days to for the production of jetpacks -Our assumption is 180days -Creation of prototype is the only predecessor for cost analysis and test of prototype
Top 5 risks -Machinery malfunction during mass production -Faulty machinery during installation -Unable to meet quality check expectations -Production halted due to safety issues -Prototype malfunction
Video 1-fail launch Video 2-disintegrated rocket Creation of prototype
Gained valuable experience Know how to manage a project Hope to make this a reality Conclusion