Calvert Cliffs Unit 3. Status Summary for PPRAC Meeting 26 August 2008. CPCN Case Background. Unit 3 proposed for Calvert Cliffs site, Calvert Co.
E N D
Calvert Cliffs Unit 3 Status Summary for PPRAC Meeting 26 August 2008
CPCN Case Background • Unit 3 proposed for Calvert Cliffs site, Calvert Co. • New unit would have net output of about 1600 MW, nearly doubling the capacity of the existing Units 1 and 2 combined – if constructed it would be the world’s largest reactor • Applicant for CPCN is Calvert Cliffs 3 Nuclear Project, a wholly owned subsidiary of UniStar Nuclear Energy (which is a joint venture of Constellation and Electricité de France) • PPRP filed initial recommended license conditions on 16 July 2008 • PSC evidentiary hearings held 11-12 August; also 3 public hearings in August
Key Issues • Water use • Ecology • Air Impact • Socioeconomics/Traffic
Water Use • During construction, use of ground water for uses such as concrete mixing and sanitary water supply • During operation, withdrawal of >50 mgd for cooling water • Operational water use is much less than Units 1 and 2 (which withdraw >3,000 mgd combined), but a greater percentage of the Unit 3 will be lost to evaporation and not returned to the Bay
Ecology • Calvert Cliffs 3 must construct facility in a way that minimizes impacts to wetlands, streams, forests • USACE and MDE actively reviewing joint state/federal wetlands permit • DNR’s review of Forest Conservation Plan near completion • Critical Area Commission provided project approval in early August
Air Impact • Use of Bay water in cooling tower gives rise to emissions with relatively high levels of dissolved solids – which constitutes particulate matter (PM) and requires detailed modeling of air quality impacts, use of Best Available Control Technology • Other sources include oil-fired emergency generating units • Much smaller emissions profile compared to similar-sized fossil fuel fired facility • PPRP and MDE currently evaluating revised air emissions data that Calvert Cliffs 3 submitted at the PSC hearings earlier this month
Socioeconomics/Traffic • Fiscal benefits to Calvert County and So. Maryland • ~4000 construction jobs • ~360 permanent jobs • Estimated $20 million in tax revenue to County • Calvert Cliffs 3 working on detailed traffic study; will require SHA approval of road upgrades to support increased construction traffic • MHT approval required for mitigation plans associated with impacts to historic resources on the site
Public Reaction • Public comments at hearings showed strong local support for Unit 3 project • Concerns raised by members of the public are being addressed by State’s recommended conditions, and/or through NRC licensing process • NRC has federal jurisdiction for radiological emergency planning, radiological health and safety, nuclear waste disposal
Current Status • PPRP and Calvert Cliffs 3 actively working to reach agreement on as many recommended license conditions as possible • PPRP/MDE evaluation of air quality impacts and water appropriations ongoing • Additional coordination also continuing with SHA, DNR Forestry, USACE/MDE • Expected date for CPCN issuance not yet determined, but we should be able to support Calvert Cliffs 3 proposed construction start date of May 2009
“Coming Attractions’ CP Crane Barge Unloader Catoctin Coal Testing at CP Crane