1 / 1

AWF-8

WRC-12 に向けた主な会合スケジュール. 参考資料 5. ITU-R 各 SG での技術的検討. 勧告案、研究課題などの検討. RA-12 *. 1/16 ~ 20. CPM テキスト. CPM レポート. CPM テキスト案の作成. WRC-12. CPM-2. 7/16. 2/14 ~ 25. 1/23 ~ 2/17. 各 SG による作業完了. APT 共同提案. 1 ~ 3 月頃. 10 ~ 1 月頃. 3 月(タイ). 3 月 ( 東京 ). AWF-8. AWF-9. AWF-10. AWF-11. APG

flann
Download Presentation

AWF-8

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WRC-12に向けた主な会合スケジュール 参考資料5 ITU-R 各SGでの技術的検討 勧告案、研究課題などの検討 RA-12* 1/16~20 CPM テキスト CPM レポート CPMテキスト案の作成 WRC-12 CPM-2 7/16 2/14~25 1/23~2/17 各SGによる作業完了 APT共同提案 1~3月頃 10~1月頃 3月(タイ) 3月(東京) AWF-8 AWF-9 AWF-10 AWF-11 APG 2012-4 APG 2012-5 APG 2012-3 APT暫定 見解の策定 APT共同提案の策定作業 我が国の意見反映 我が国の意見反映 我が国の意見反映 11~2月頃 9~12月頃 3~5月頃 各分科会 パブ コメ 各分科会 パブ コメ 各分科会 WRC関係機関連絡会 WRC関係機関連絡会 WRC関係機関連絡会 *RA-12:2012年無線通信総会

More Related