An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tunnel Electronics Baseline Issues Snowmass Workshop August 25, 2005 Ray Larsen for SLAC ILC Group

  2. Outline • Motivation: Cost Reduction • Risks: Radiation Damage, Lower Availability • Fy2000 Study • New Developments • Proposed R&D • Baseline Recommendations Tunnel Electronics R.S. Larsen

  3. NLC Cost Reduction Study Fy2000 • Lehman cost model: 1 Tunnel - Alcoves every 235m • Electronics near sensors in concrete wall “TEE’s” • Eliminate long-haul cables • Sacrificial short-hauls (pigtails) • Protect COTS electronics against gammas, neutrons • Serial digitized data out on copper, fiber • Consider Wireless for slow data, Robotics servicing • BPMs, LLRF, vacuum pumps-gauges-valves, magnet movers, temperature, MPS-BCS-PPS... • Gigabit links to next level - BW not an issue. Tunnel Electronics R.S. Larsen

  4. TEE Basic Models**Preliminary - S. Rokni & S. Roessler Tunnel Electronics R.S. Larsen

  5. Tunnel Electronics R.S. Larsen

  6. Fy2000 Results • Radiation protection “would likely work” • Concrete wall depth marginal– extra bumps easy if casting. Civil cost not estimated. • Packaging, cooling seems feasible • All connectors on module rear for robotic remove/replace • RF coax plug-in connectors a major issue • Robotic economic study done (J. Cornuelle w/ Stanford ME dept.) – seems feasible. • Significant cost reductions possible Tunnel Electronics R.S. Larsen

  7. Lehman ($253K) vs. CD 0.4 ($118K) TEE Cost Reduction$135M (53%) Tunnel Electronics R.S. Larsen

  8. Two versions for MK Access every n Km Lateral penetrations every ~40 m for short WG or cable feeds Fig. A:Instrumentation in Aux. Tunnel, long cables to sensors Fig. B:Instrumentation in Beam Tunnel, short cables to sensors, data cables to Aux tunnel ILC Proposed Tunnel ModelsDual Shallow or Deep Tunnels Cables I,M (X) KB (A) Cables + WG MK (X) I, B (B) Tunnel Electronics R.S. Larsen

  9. 2-Tunnel Model w/~Penetrations ~6in. Penetration Module Tray Tunnel Electronics R.S. Larsen

  10. ILC Linac Instrumentation (~40m) ~1m ATCA Standard Module Tunnel Electronics R.S. Larsen

  11. Proposed New StudyIn-Tunnel Instrumentation • 2-Tunnel instrument model never estimated. • Radiation modeling for electronics just starting • New state-of-art circuit, packaging models needed • BPMs, LLRF, tuners, movers, cryo temperature, vacuum, etc. • Standard module designs, mezzanine cards, hot swap • Robotic module replacement Tunnel Electronics R.S. Larsen

  12. New Commercial Developments Since Fy2000 • High density plug connectors up to 5 GHz available (ATCA) – interface on rear adapters • High Availability standard architectures (ATCA) • Hot swap modules demonstrated (ATCA) • New cooling options available including liquid leak-less plugs on backplane (Rittal, ATCA) • Gigabit communications w/ embedded processor chips, $5 Wireless chips, high speed 12-14 bit sampler ADC-DAC commodity products, more to come….. • Cannot afford to NOT explore latest technologies. Tunnel Electronics R.S. Larsen

  13. Baseline Recommendation • BCD R&D: • Re-model all systems to state-of-art electronics, HA packaging, communications • Estimate BCD model - all electronics in Auxiliary tunnel, short penetrations to beam tunnel (10m) at ~40m • ACD R&D: • Redefine tunnel packaging, protection scenarios for cold machine, COTS electronics • Study Rad-Hard design for vac-ion pumps • Study Robotics maintenance model • Re-estimate potential cost-availability benefits Tunnel Electronics R.S. Larsen