3D-modelling for hydraulic assembly Preliminary design of the TS “Balcony unit” in USA15. Kirill Egorov Indiana University. TS “Balcony unit”… Where is the balcony?. It’s here! USA15 level 3. Where is the compressor room to connect the “balcony unit”?. Keep in mind this white column!!!.

fuller
Download Presentation

Kirill Egorov Indiana University

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 3D-modelling for hydraulic assembly • Preliminary design of the TS “Balcony unit” in USA15. Kirill Egorov Indiana University 5th Thermosyphon Workshop

  2. TS “Balcony unit”… Where is the balcony? It’s here! USA15 level 3 5th Thermosyphon Workshop

  3. Where is the compressor room to connect the “balcony unit”? Keep in mind this white column!!! …and this cable tray 5th Thermosyphon Workshop

  4. The white column is a part of the USA15 ventilation system. Where is the bottom part? 5th Thermosyphon Workshop

  5. Keep in mind these two red areas in front of and behind the tank 1 2 This is the bottom part of the white column This is the bottom part of the cable tray Compressor room door 5th Thermosyphon Workshop

  6. The compressor room is found! 1 The tank is under this white area The compressor room entrance is under this line 2 3 5th Thermosyphon Workshop

  7. …and without drilling of ceiling 30 cm 3 3 5th Thermosyphon Workshop

  8. “Balcony unit” – 3D modelling of components 31kW electric heater Heat-exchanger for sub-cooling 56kW heater Dummy-load Filters Flowmeter 5th Thermosyphon Workshop

  9. “Balcony unit” – 3D assembling There are ~760 3D-solids here This assembling doesn’t include a support frame 5th Thermosyphon Workshop

  10. “Balcony unit” – 3D assembling Blue pipes need thermal insulation 5th Thermosyphon Workshop

  11. “Balcony unit” – 3D integration 3 2 There are four fixing point for the balcony ~2450 kg without support frame 4 The support #4 is standing on the roof of the compressor room 1 5th Thermosyphon Workshop

  12. “Balcony unit” – 3D integration cold vapor to condenser warm liquid to detector cold liquid from condenser warm vapor from detector 5th Thermosyphon Workshop

  13. “Balcony unit” – 3D integration >3 m <1,2 m 1,4 m 5th Thermosyphon Workshop

  14. Conclusion • There are 3D models for all “Balcony unit” components. • The preliminary design is ready. • The design of the supporting frame will be ready soon after approval of all the components. • The strength of the balcony needs a confirmation from the CERN civil engineering. 5th Thermosyphon Workshop