An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NCSA Project Management Committee Meeting April 4th , 2007 10:00 am EEAA Premises 6th floor

  2. Content of the presentation • NCSA Project outputs • What did we achieve? • Where we are now? • How we intend to end?

  3. NCSA Project outputs“original in project document” • Three stocktaking & gap identification reports of the three thematic areas: • Desertification. • Biodiversity. • Climate change. • Synergy and prioritization report. • In-depth studies report. • Capacity Development Action plan. -------------------------------------------- • Management of PMU • Awareness raising (Bezra and others)

  4. 2) What did we achieve? • Three thematic reports ( biodiversity- climate change – desertification). • Nationalization of MDG 7. • Synergy and prioritization report. • In-depth studies of 5 cross cutting capacity constrains ( draft ready for consultation) . • Implementation of Bezra summer/school campaign. • Development of CB2 project proposal “mainstreaming of the global environment in national development plans and policies by strengthening the monitoring and reporting system for multilateral environmental agreements in Egypt”

  5. 3) Where we are now? • Consultation of in-depth studies Review of in-depth studies by panel of advisors • Development of the action plan . • Two consultation workshops (National & Donors) for discussion of the action plan. • High level endorsement of the action plan. • Preparation of Environmental awareness campaign (Protecting our Global Environment – our right) in cooperation with El Sawy culture Wheel.

  6. 4) How we intend to end? • Finalizing & printing of the in-depth studies report (end of May 2007) • Production of the capacity development action plan that links the 3 conventions with possible funding sources ( end of july – August 2007) • Conduct & evaluate the Environmental awareness campaign with El Sawy culture Wheel ( end of june 2007) . • Production of NCSA process report (final project report indicating the experience & lessons learned)( September 2007).