540 likes | 1.25k Views
DOT/PF INCIDENT RESPONSE FLOOD MAY 09 DISASTER EVENT. SITREP (Situation Report). WASHTO Committee on Maintenance . Eagle/Yukon River Ice Jam. Where in the World is Eagle. City and Village of Eagle. Established in 1897 during the Klondike Gold Rush
E N D
DOT/PF INCIDENT RESPONSE FLOOD MAY 09 DISASTER EVENT SITREP (Situation Report) WASHTO Committee on Maintenance
Eagle/Yukon River Ice Jam EAGLE/ YUKON RIVER ICE JAM/ FLOOD MAY 09 DISASTER EVENT
City and Village of Eagle • Established in 1897 during the Klondike Gold Rush • Eagle population is approximately 140 • Eagle Village pop is approximately 70 • Eagle is a National Historic Landmark EAGLE/ YUKON RIVER ICEJAM/ FLOOD MAY 09 DISASTER EVENT
The Flood/Ice Dam • A long cold winter combined with higher than usual snow pack (up to 150% of normal), higher than usual ice formation on the river (up to 140% of normal) and several days of unseasonably warm weather, which caused rapid melting and ice movement downstream on the Yukon
Flood Photos EAGLE/ YUKON RIVER ICEJAM/ FLOOD MAY 09 DISASTER EVENT SITREP 05.11.09 - 2-
Flood Photos Before After
Flood Photos Before After
Flood Photos Before After
SITUATIONDESCRIPTION EAGLE/ YUKON RIVER ICEJAM/ FLOOD MAY 09 DISASTER EVENT
DamagePHOTOS EAGLE/ YUKON RIVER ICEJAM/ FLOOD MAY 09 DISASTER EVENT
DamagePHOTOS EAGLE/ YUKON RIVER ICEJAM/ FLOOD MAY 09 DISASTER EVENT
DamagePHOTOS EAGLE/ YUKON RIVER ICEJAM/ FLOOD MAY 09 DISASTER EVENT
DamagePHOTOS EAGLE/ YUKON RIVER ICEJAM/ FLOOD MAY 09 DISASTER EVENT
DamagePHOTOS EAGLE/ YUKON RIVER ICEJAM/ FLOOD MAY 09 DISASTER EVENT
DOT/PF TOP PRIORITY EAGLE/ YUKON RIVER ICEJAM/ FLOOD MAY 09 DISASTER EVENT
Emergency Access Options • Initially considered cutting through ICE/Debris on Mission road – to create 24’ vehicular Road access • NEGATIVE IMPACTS: $$$, potential for damage to cultural /personal property embedded in ice; potential for high risk safety issues; potential to create more mess when ice thaws and fills into the roadway cut • Because of safety and potential for additional damage, decision was made to allow ice mass to thaw naturally until debris is retrievable and safer to remove. EAGLE/ YUKON RIVER ICEJAM/ FLOOD MAY 09 DISASTER EVENT
Considerations in planning alternate temp Vehicular route • Looked at temp detours/alt routes for pre-fab road mat system which would lay down with minimal ground prep and min ground disturbance to wetlands. • 2 viable routes: • Existing 4-wheeler trail that was being used, passable at the time only by 6-whlrs since it was getting more saturated daily due to high use and thawing ground. Trail was also very curvy and with lots of hills and dips • Preferred Option: Straight route determined along a survey line cut from east end of airport straight through to mission rd just south of village EAGLE/ YUKON RIVER ICEJAM/ FLOOD MAY 09 DISASTER EVENT
Mission Road proposed temporary by-pass EAGLE/ YUKON RIVER ICEJAM/ FLOOD MAY 09 DISASTER EVENT
Detour Route • 5.21 MAINLINE Completed with all mat quantities installed. • 400 Durabase (composite material interlocking semi-flexible) • 200 MudMats (cordura-like fabric with sandwiched bamboo poles), Eventually OVERLAYED w/ DuraBase mats • 100 Carolina (rigid wooden type) – also decided to replace these on the mainline with Durabase. EAGLE/ YUKON RIVER ICEJAM/ FLOOD MAY 09 DISASTER EVENT
mudmats EAGLE/ YUKON RIVER ICEJAM/ FLOOD MAY 09 DISASTER EVENT
Mudmats • ISSUES with Mudmats: bamboo “reinforcement poles” bend and break even after pickup truck driving over it; bicyclists cannot drive on it;, water is seeping through the fabric. Project was reluctant to allow trucks and heavy equipment to drive over mudmats.
Carolina Mats • ISSUES w Carolina mats: many of them shift quite noticeably and need heavy equipment to adjust after several passes of heavy vehicle traffic. Very rigid, do not flex to meet end to end without need for shims of lumber to bridge.
Durabase Mats EAGLE/ YUKON RIVER ICEJAM/ FLOOD MAY 09 DISASTER EVENT SITREP
Installing Durabase Mats EAGLE/ YUKON RIVER ICEJAM/ FLOOD MAY 09 DISASTER EVENT
Durabase Mats EAGLE/ YUKON RIVER ICEJAM/ FLOOD MAY 09 DISASTER EVENT SITREP
Mission Rd temp by-pass EAGLE/ YUKON RIVER ICEJAM/ FLOOD MAY 09 DISASTER EVENT
Mission Rd temp by-pass EAGLE/ YUKON RIVER ICEJAM/ FLOOD MAY 09 DISASTER EVENT
Mission Rd temp by-pass EAGLE/ YUKON RIVER ICEJAM/ FLOOD MAY 09 DISASTER EVENT
Next Step - Debris Removal • Debris removal contract and Rd repair contract with 5 day bid period (6/5) • Contractor started work 6/13 • ADEC provided Term-Contractor for Hazmat removal • Worked with ADEC /DNR/SECC and City to locate debris storage site. EAGLE/ YUKON RIVER ICEJAM/ FLOOD MAY 09 DISASTER EVENT
Debris/Ice Removal EAGLE/ YUKON RIVER ICEJAM/ FLOOD MAY 09 DISASTER EVENT SITREP
Completed Repairs EAGLE/ YUKON RIVER ICEJAM/ FLOOD MAY 09 DISASTER EVENT SITREP
Rebuilding Efforts • Mennonite Disaster Services and Samaritan’s Purse Volunteers • Built 13 houses
Rebuilding Efforts • Eagle and 3 other villages had an immediate need for 8000 lbs of dog food per week