1 / 17

Flood modeling and logistical support system for natural disaster management authorities

FLOODLOG HUSK/1001/2.1.2/0009. Flood modeling and logistical support system for natural disaster management authorities. Project meeting. Kosice, 2012. november 27. Technical University of Kosice. Major activities There are six groups of activities being done in the project framework :

Download Presentation

Flood modeling and logistical support system for natural disaster management authorities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FLOODLOG HUSK/1001/2.1.2/0009 Floodmodeling and logisticalsupportsystemfornaturaldisaster management authorities

  2. Project meeting Kosice, 2012. november 27. Technical University of Kosice

  3. Major activities • There are six groups of activities being done in the project framework: • Specification of the model details: The result is the framework criteria system that the model outputs have to fulfil. • 2. Development of the input data set: The result is a complete set of harmonized data layers covering the whole Bódva catchment. • 3.The modification and completion of existing cross-border databases for testing the tools and models. • 4. Development of an integrated, operational WEB-based, and desktop-based GIS database. • 5. Environmental Impact and Risk Assessment of the floods. • 6. Logistical modelling.

  4. Activities • Model definitions • Flood modeling • Logistical modleing • Environmnetal impact assessment model Database structure, list of data layers needed for the models

  5. Activitiy 2. • Database development... • Two sided activity, needs significant harmonization activity • Satellite images (SPOT) to be covered jointly • Some of the data layers are covered totally by the Hungarian side: Recent and historical landuse Digital terrain model (SRTM, 90 meter resolution)

  6. Location of the pilot area

  7. Existing, complete input layers of the Floodlog database (Hungary) • 1. Data layers in raster format: • SRTM DEM for the entire area(with removed vegetation) • 10m spatial resolution DEM • Map of II. Military survey (1806-1869)

  8. 2. Data layers in vector (.shp) format: • catchment of Bodva river • geology (formations) • geology (linear elements) • administrative border of settlements • Urban/built up areas • nature reserve areas (national parks) • planned nature reserve areas • Natura2000 SCI sites • Natura2000 SPA sites • ex lege protected areas • reservoirs • lakes

  9. 2. Data layers in vector (.shp) format: • dirt road • meadow road • public roads: • highway • local highway • ’B’ road • street • railways • rivers • streams • springs • canals • houses (with number/age of inhabitants) • other objects (e.g. wells, caves, mines)

  10. Problems : Missing input layers (.shp,Aquaprofit database, Flood Management Plans, 2010) Missing .shp files!

  11. Problems: Existing layers (.shp) but missing attributes:

  12. Problems: Existing, but empty layers (.shp) :

  13. Full list of existing layers but empty/missing attributes: • flooded area • dike opening • dike failure • dike heightening • sandbag dike • pumping • highest water level • sand deponia • drainage ditch • host location (befogadóhely) • meeting points (for Disaster Management and other authorities) • evacuation route • evacuation area • height incomleteness (magassági hiány) • structures (műtárgy) • storehouses • emergency reservoirs

  14. Dissemination activity

  15. Introduction to the FLOODLOG project Dobos, E.,Vágó, J., Kiss, I., Németh R., Verrasztó, Z.,   István, Zs., Ladányi R.,Chrabák, P., Zelenakova, M. FLOODLOG HUSK/1001/2.1.2/0009 20.11.2012 - 21.11.2012, Stará Lesná

  16. Current actions needed! Continuation of the database development for the Bodva catchment Deadline is 31st of March, 2013 Public procurement is needed!!!!!!!!! Updating the existing data layers for the Ipoly and the Bodrogköz regions Dissemination activity!!

  17. Thank You for your attention!

More Related