An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 1. News from TPC DCS cooling prototype • Project overview: • Aim of the prototype: investigating and developing standard DCS solutions • and integrating them in the TPC community • 1-st version of the cooling prototype(IROC) was assembled in april 2001, • in 161-R024 • had as main features the cooling mechanical structure very similar to • the final version • control loop was consisting in monitoring the temperature and controlling • the input current for heater. Alice DCS workshop S.Popescu

  2. T1 T2 T4 T3 Thyr2 Thyr1 Wago mPLC + I/O modules PC Windows2000 3) IROC WAGO I/O 32 V 2.1 Ethernet OPC Schneider V2.2.1 2) PVSS client 2.12 1) On/Off Frigo 1) IROC circuit T6 Operational Panel 1st ver. 2) Frame circuit PUMP Heater1 T5 Heater2 3) FEC circuit System set-up Alice DCS workshop S.Popescu

  3. Control panel for 1 test set-up Alice DCS workshop S.Popescu

  4. Alice DCS workshop S.Popescu

  5. Alice DCS workshop S.Popescu

  6. Alice DCS workshop S.Popescu

  7. In progress : Step 1 qualification of Wago mPLC (in thermolab) consisting in: -test of system stability -test of system load (maximum nr. PID loops) -test of time response with a maximum load Step 2 studies of other possible solutions : ELMB (the Atlas Embedded Local Monitoring Board) The same type of tests will be performed in the next weeks PT1000 adaptators , software + connection to sensors finished and working properly Alice DCS workshop S.Popescu

  8. Near future: Step 3 Qualification of new electronics board (FEC), aim  control of LV full cable length Wiener PL500 + Slic.OPC + Control Panel September  161-R024 Implications on control side: - test of archiving, alarms and database handling Step 4 Test of cooling for IROC + electronics (45 FEC) October  TPC laboratory Step 5 Test for a complete control for 1 IROC: cooling, LV Wiener PS, FEC, HV Iseg PS news : Iseg OPC sever exist and is working good Alice DCS workshop S.Popescu