TPC DCS update. TPC (1). 2. 10. 1. 18. 216. 18. 1. 2. 2. 1. 6. 12. 1. 1. 1. 16. 72. 2..4. 108. 288. 500. 216. 23/01/07. Database(s). CR3. Control room (ACR). 1. User interface. WTS PVSSII. Ethernet. CR3. CR3. CR3. CR3. CR4-Z08. CR3. 2. 3. 4. 5. 12. 6.
E N D
TPC(1) 2 10 1 18 216 18 1 2 2 1 6 12 1 1 1 16 72 2..4 108 288 500 216 23/01/07 Database(s) CR3 Control room (ACR) 1 User interface WTSPVSSII Ethernet CR3 CR3 CR3 CR3 CR4-Z08 CR3 2 3 4 5 12 6 PVSS II PVSS II PVSS II PVSS II PVSS II PVSS II OPC client Modbus/TCP OPC client OPC client DIMclient Virtual Serial ISEG OPCserver Wiener OPCserver ELMB OPCserver E E E CR3 [FED] U U DIMserver 9 10 E CR4-Z08 Systec USB-CAN DIMclient PEAK USB-CAN PLC C E C C ACC S CR4-Y08 CR4-Z08 ISEG Heinzinger ACC ACC UX-A/C Eth.-RS232 UX-A/C UX-A/C PS Calibr.pulser Wiener Ethernetswitch Gatingpulser E HV LV ELMB HV ELMB DDL Chambers Chambers Chambers,detector RCU HVrod HVrod Chambers DIMsrv Low Voltage Temp. Monitor FEE Very High Voltage VHV Curr. Monitor Pulser system High Voltage
TPC(2) 4 16 1 2 2 40 4 18? 29/01/07 Ethernet CR3 CR3 CR3 CR3 7 8 PVSS II PVSS II PVSS II PVSS II DIMclient Modbus/TCP DIMclient DIP E E E E SG2 CR3 CR3 11 [Vision] DIMserver/filesystem [Motion][Laser] DIMserver [Goofie] DIMserver 13 [GWG] 11 GasPVSS DIMcl V.Ser. FrameGrab [TS/CV] E E SG2 PLC SG2 Drift velocityanalysis TS/CVSCADA SG2 Video Gas LHut UX-C UX-C LHut Eth.-RS232 PLC DCS board PLC DIMsrv LHut Mirrorcontrol CR5 Gas LHut CoolingPlant (ch) CoolingPlant (TS) Laser PicoMotor PicoMotor Videocameras Chambers,detector HVrod ThermalScreen(s) Detector Laser calibration system. Chamber Cooling VHV rod Cooling Thermal Screen(s) Gas system Drift velocity mon.
HV • Status: • PVSS + FSM based on OPC 4.03 • PVSS 3.1 • FSM based on standard from 2005 • To Do • PVSS 3.6 • Update to latest OPC new • Adopt to FSM configuration new • New USB interface • Performance? • Adopt to Oracle DB • Bring closer to Alice standards
LV • Status • Version for PL508 incl. FSM • PVSS 3.1 • To Do • PVSS 3.6 • New device: PL512 • Similar but details are important for FSM • Adopt to FSM configuration • Adopt to Oracle DB • Bring closer to Alice standards • Interlock • soft interlock to shut down FECs • delayed interlock from cooling system
Temperature monitoring • Status • System put in operation during pre-commissioning • PVSS 3.1 • Pre-commissioning including Amanda server • To Do • Re-cable CAN BUS in-between ELMBs • PVSS 3.6 • New interface • Add FSM • Simple: ON/OFF • Adopt to Oracle DB • Finalize Sensor information
FEE • Status PVSS • API implementation in PVSS • Panels + Archiving • To Do PVSS • Debug + benchmark • Add FSM • Mirror of State on level of RCU • To Do • System integration • FEE Laboratory
VHV • Status • Available during pre-commissioning • To Do • Installation in CR4
Pulser • Status • Gating pulsers tested • Power supplies + port server available • To Do • Power supply • Zentro PS with RS232 • Ongoing, prototype • PVSS control + FSM • Pulser monitoring + control • RS232 • Previous design but HW not yet available • DCS Board • Firmware • PVSS integration
Laser system • Status • Laser Control used during pre-commissioning • Auto tracker used during pre-commissioning • To Do • Mirror Control • Visualize • Frame grabber -> PVSS
Drift Velocity Monitor • Status • Hardware + Analyze Software • Goofy system stand alone • To Do • Integration PVSS • FSM States: ON OFF ..
Cooling • Status • Cooling plant • TS/CV SCADA • To Do • Import parameters into sub-detector DCS • Control from sub-detector DCS • Common for all sub-detectors • SCY file to configure FW component • Interlock pressure valves • Connected to DSS • Monitoring via DSS
Gas • Status • Gas system with control • To Do • Import parameters into sub-detector DCS • Common for all sub-detectors • interface
DSS System • Ambient pressure? • Pressision? • Humidity?
FSM Hierarchy TPC Detector GAS ROC FC FERO TEMP Screen LASER D mon GasD GasD CO2 RCool VHV SSW Cone ROC TSen ....... +500x … HV Gating ESC CalibP ESC LaserC MirrorC 36x ....... IROC OROC MISC GPulser PS FED LV ECool CPulser PS Crate PS Calib Image Mirror Ch Ch Ch Ch Ch RCU Ch Ch ....... ....... ....... ....... ....... ....... ....... ....... 36x (2x) 36x 10x 98x ??x 6x 72x ??x
TPC Commissioning 2007DCS usage dates DCS Commissioning Meeting 23.01.07 with ACC team