SW 52 nd Street Railroad to Gore Blvd Project # 2012-04

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SW 52nd Street Railroad to Gore Blvd Project # 2012-04 City Engineer: George Hennessee Project Manager: Billy Tramel City Inspector: Kirk Scott Presented by: City of Lawton Engineering Division Office Number: 580-581-3385

  2. SW 52nd Street Railroad to Gore Blvd Project # 2012-04

  3. SW 52nd Street Railroad to Gore Blvd Project # 2012-04 • 53rd Street Road Closure • Closure at NW Columbia Ave • - NW Compass Dr Local Traffic Only – No Through Traffic 53rd Street NW Columbia Ave Fire Station #5 Hard Closure Line – No Traffic NW Compass Dr SW Gore Blvd

  4. SW 52nd Street Railroad to Gore Blvd Project # 2012-04 Reason for Closing 53rd Street Closure for 60 days starting Future 66” RCP Storm Drain Pipes If in this area the trench fails the lane becomes to narrow for truck traffic. New Storm Drain Trench is 16’ Deep and 17’ Wide at trench box Current 22’ Drive Lanes Max distance to still make turn Minimum Trench Width 17’ Current 12’ Work Lane

  5. SW 52nd Street Railroad to Gore Blvd Project # 2012-04

  6. SW 52nd Street Railroad to Gore Blvd Project # 2012-04

  7. SW 52nd Street Railroad to Gore Blvd Project # 2012-04 New Sewer Line New Water Main New Gas Main Demolishing 52nd Roadway on the South side of Gore Blvd Existing Gas Main Installation of new water main on the West side of 52nd

  8. SW 52nd Street Railroad to Gore Blvd Project # 2012-04 GORE BLVD FUTURE DETOUR This will be reduced to 10 MPH This will be reduced to 10 MPH

  9. SW 52nd Street Railroad to Gore Blvd Project # 2012-04 Questions? Comments? Feedback?