Title I Design Status

Explore the innovative layout and infrastructure of our cutting-edge research facility, including beam transport halls, experimental halls, and office complexes. Discover key features like beam transport configurations and specialized equipment installations. Follow the progress of our facility as it undergoes upgrades and enhancements to support future research endeavors.

gcarlos
Download Presentation

Title I Design Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Title I Design Status • RSY – CLOC • Research Yard • Beam Transport Hall • Undulator Hall • Electron Beam Dump • Front End Enclosure • Near Experimental Hall • X-Ray Transport & Diagnostics Tunnel • Far Experimental Hall • Central Lab Office Complex

  2. Research Yard & Beam Transport Hall • Demo building 102A • BTH entrance • BTH tunnel -164 meters • BTH head-house, 63 meters • Removable ports • Ability to accommodate future ± 2° and 4° beam-lines

  3. Beam Transport Hall-Head House • New Head House-63 Meters • Ceiling Height Reduced to 10’

  4. Beam Transport Hall-East End • Tunnel entrance • Building being relocated on top the berm • Removable cap for future equipment installation

  5. Undulator Hall – West End • Undulator Hall- 175 meters • Critical temperature control • .2 Degree C • Critical slab stability • Large alcoves being deleted • Critical HVAC equipment above ground • ~60’ cover Plan View Cross Section

  6. Undulator Hall – East End Plan View • Mechanical & Electrical Rooms • ~20’ Cover Cross Section

  7. Electron Beam Dump&Front End Encl. • Electron Beam Dump • Front End Enclosure • Equipment access from NEH • Construction will be cut and cover • ~15’- 20’ cover Plan View • 3’ and 4’ steel shielding Cross Section

  8. Near Experimental Hall-Subbasement • Shops • Preparation and Control Area • Shielding • Experimental Hutches Plan View

  9. Near Experimental Hall-Basement • Parking space (14) • Mechanical Equipment Area • Service Dock • Wet Lab • Laser Bay Plan View

  10. X-Ray Transport & Diagnostics Tunnel • X-Ray Transport Tunnel • 250 meters Plan View • Elimination of HVAC system • Entrance and Exiting Improvements Cross Section

  11. Far Experimental Hall • Shop Complex • Preparation and Control Area • Experimental hutches • Laser bay • Layout is currently under review for possible changes to increase hutch sizes Plan View

  12. FEH 2nd Floor - Office Area • Office and Conference area • General Purpose area • Elevator Plan View Cross Section

  13. Typical Sections Cross Section Cross Section Cross Section Cross Section

  14. Central Lab Office Complex 1st Flr – 18,143 sf 2nd Flr – 28,544 sf 3rd Flr – 26,172 sf Total - 72,859 sf • Large Conference Center • Office Facilities for 282 Personal • 6 Laser Labs • Six pods consisting of Experimental/ Research Clusters • Other groups include laser, ic and vacuum techs; mech/elec eng; computer network, etc First Floor Plan Second Floor Plan Third Floor Plan

  15. Central Lab Office Complex • West Complex 3 Story • East Complex 2 Story Building Cross Section Looking North • Conference Center • NEH 1st and 2nd flrs Building Cross Section Looking East