Explore the innovative layout and infrastructure of our cutting-edge research facility, including beam transport halls, experimental halls, and office complexes. Discover key features like beam transport configurations and specialized equipment installations. Follow the progress of our facility as it undergoes upgrades and enhancements to support future research endeavors.
E N D
Title I Design Status • RSY – CLOC • Research Yard • Beam Transport Hall • Undulator Hall • Electron Beam Dump • Front End Enclosure • Near Experimental Hall • X-Ray Transport & Diagnostics Tunnel • Far Experimental Hall • Central Lab Office Complex
Research Yard & Beam Transport Hall • Demo building 102A • BTH entrance • BTH tunnel -164 meters • BTH head-house, 63 meters • Removable ports • Ability to accommodate future ± 2° and 4° beam-lines
Beam Transport Hall-Head House • New Head House-63 Meters • Ceiling Height Reduced to 10’
Beam Transport Hall-East End • Tunnel entrance • Building being relocated on top the berm • Removable cap for future equipment installation
Undulator Hall – West End • Undulator Hall- 175 meters • Critical temperature control • .2 Degree C • Critical slab stability • Large alcoves being deleted • Critical HVAC equipment above ground • ~60’ cover Plan View Cross Section
Undulator Hall – East End Plan View • Mechanical & Electrical Rooms • ~20’ Cover Cross Section
Electron Beam Dump&Front End Encl. • Electron Beam Dump • Front End Enclosure • Equipment access from NEH • Construction will be cut and cover • ~15’- 20’ cover Plan View • 3’ and 4’ steel shielding Cross Section
Near Experimental Hall-Subbasement • Shops • Preparation and Control Area • Shielding • Experimental Hutches Plan View
Near Experimental Hall-Basement • Parking space (14) • Mechanical Equipment Area • Service Dock • Wet Lab • Laser Bay Plan View
X-Ray Transport & Diagnostics Tunnel • X-Ray Transport Tunnel • 250 meters Plan View • Elimination of HVAC system • Entrance and Exiting Improvements Cross Section
Far Experimental Hall • Shop Complex • Preparation and Control Area • Experimental hutches • Laser bay • Layout is currently under review for possible changes to increase hutch sizes Plan View
FEH 2nd Floor - Office Area • Office and Conference area • General Purpose area • Elevator Plan View Cross Section
Typical Sections Cross Section Cross Section Cross Section Cross Section
Central Lab Office Complex 1st Flr – 18,143 sf 2nd Flr – 28,544 sf 3rd Flr – 26,172 sf Total - 72,859 sf • Large Conference Center • Office Facilities for 282 Personal • 6 Laser Labs • Six pods consisting of Experimental/ Research Clusters • Other groups include laser, ic and vacuum techs; mech/elec eng; computer network, etc First Floor Plan Second Floor Plan Third Floor Plan
Central Lab Office Complex • West Complex 3 Story • East Complex 2 Story Building Cross Section Looking North • Conference Center • NEH 1st and 2nd flrs Building Cross Section Looking East