170 likes | 314 Views
August Webinar. Agenda of Topics. New XL10 Controller Features, Pricing Commercial Details. Cscape 9.10B Now Available Features, enhancements Web Posting Monday. Lead Time Updates Trends & Problem Items. New XL10!. Next XL series Controller. Feature Set 10.4” TFT VGA Display
E N D
August Webinar • Agenda of Topics • New XL10 Controller • Features, Pricing • Commercial Details • Cscape 9.10B Now Available • Features, enhancements • Web Posting Monday • Lead Time Updates • Trends & Problem Items
New XL10! • Next XL series Controller • Feature Set • 10.4” TFT VGA Display • Same I/O Options as rest of XL Series • Full Ethernet, USB A&B • CsCAN, microSD • Two RS-232/RS-485 Ports • Slim Profile: • 1” depth at perimeter • 2” max depth + I/O $1995 (102 model) Shipping October!
New XL10 • Features & Benefits 10.4” VGA Screen 1” Depth @ Perimeter, 2” Max Depth
New XL10 • Features & Benefits USB Programming & microSD (hidden) XL Series I/O Options USB Host & Built-in Ethernet CsCAN, MJ1 & MJ2 Full Ethernet with Web Serving, FTP Suppport, Modbus/TCP Master & Slave
New XL10 • Part Numbers & Pricing 10.4” VGA All-in-one from $1995 with I/O
New XL10 • Important Dates • Open for Orders: 9/1 • Sales Material Online: 9/7 • Demos Available: 9/15 • Projected Stock Date: 10/6/10 • CE mid-4th Quarter • UL early 1st Quarter Accepting Orders 9/1/10
Cscape 9.10B • Important Maintenance Release • Cscape 9.1B • Important Bug Fixes • Some New Features • Located on ftp.heapg.com today (not advertised) • To Be Posted on www.heapg.com at normal location Monday or Tuesday
Cscape 9.10B • New Models Added (XL10e & QX501)
Cscape 9.10B • Connection Wizard Addresses one of the biggest difficulties for new customers: Establishing a connection with the OCS!
Cscape 9.10B • Semi-Automatic Web Updates Users with Internet Access can check for updates, and automatically install those updates if desired
Cscape 9.10B • Important Maintenance Release The communication medium (Serial/Ethernet/Modem/USB/Can) is now indicated in the status bar The Connection Method/Details is now indicated on the Status Bar
Cscape 9.10B • IEC Editor Enhancements User can also configure the compilation sequence of multiple blocks in main loop modules area of an IEC Program by accessing the “IEC Modules Compilation Sequence Configuration” Dialog. User can now access the main SFC Logic and its secondary editors simultaneously. User can now have access to the secondary editors set of multiple step/transition blocks of an SFC Logic Module simultaneously. User can now debug the main SFC Logic as well as the secondary logic and view them simultaneously.
Cscape 9.10B • Bug Fixes Fixed C/F selection on SmartRail RTD and THM modules not correct. Fixed IEC program variable window limited width Fixed RCX filenames and loader IDs. Reverted to non Unicode build to fix problems caused by download image size increase. Release Version number is shown on Splash screen again. Fix for failure to save when two identically named programs are in the same project. Fixed Search window pop's up after closing Gredit Fixed firmware update wizard for J1939 options. Restore registers correctly restores all registers. Various fixes and Enhancements to the printing functionality. Various fixes to the font editor, including font size matching, and improved usability. Fixes to DeviceNet for Smartload, node zero usage and slave nodes with no data not being automatically deleted. Fix to Bitmap compression algorithm which could lock up the firmware. Fix for automatic I/O recognition not loading default module settings. Fixed Remote terminal not working over ethernet. Fixed firmware update wizard not allowing adding/removing QX backpack.
Lead Times • Review of Current Status • XLt • High Demand Globally, along with a tight electronics supply chain – have taken us well outside our 2-4 week window • XLts will be allocated during September on a need basis • 2-4 Week window probably will not be regained until late Oct 105 I/O • XL Series 105 I/O Option • We’ve been running outside the 2-4 week window • By mid-to-late September, we should be back to a 2-4 week level 12 DC In, 12 DC Out, 2 +2 Universal Analog I/O
Lead Times • Review of Current Status • SmartStix I/O • Have Been Running outside of 2-4 week normal lead time • Situation improving for now • Distributor Stocking Orders HIGHLY RECOMMENDED for September • LX Controller (Mature) • Completely out of HE-LX280 & HE-LX280C100 • Only a few HE-LX300 & HE-LX300C100 left • Replaced by HE-XL1M0 & HE-XL100, respectively
Lead Times • Review for New Products • HE-RX371 • Have Been Running 8-10 weeks • All orders filled by 9/10 • HE-CX251 • Have Been Running 8-10 weeks • All orders filled by 9/10 • SmartRail • Running 2-4 weeks • CsCAN October • SmartBlock • THM & ACM only ship next month • Balance 4th/1st Quarters
Next Month • Select Agenda Items • QX OCS • New 10.4” QX Model • SmartRail • New CsCAN I/O Base • SmartBlock • Thermocouple & AC Power Monitor Details • Wireless • New Wireless option for Ethernet-based Controllers