100 likes | 266 Views
E166 Collaboration Meeting SLAC, October 24-26, 2003 J. C. Sheppard. E166 Collaboration Meeting. Where Friday: Fuji Room, Bldg. 214 Saturday-Monday: ROB Redwood Room, Bldg 48 Who Naomi Nagahashi: Admin, Bldg 214 Nick Arias: Computers, Bldg 214 Vinod Bharadwaj: Talks, Schedule, Complaints.
E N D
E166Collaboration MeetingSLAC, October 24-26, 2003J. C. Sheppard
E166 Collaboration Meeting Where Friday:Fuji Room, Bldg. 214 Saturday-Monday:ROB Redwood Room, Bldg 48 Who Naomi Nagahashi: Admin, Bldg 214 Nick Arias: Computers, Bldg 214 Vinod Bharadwaj: Talks, Schedule, Complaints
SLAC Hotel E166 Collaboration Meeting Redwood Room, ROB Fuji Room, B214
E166 Collaboration Meeting What Friday-Saturday Noon: E166 Background Test Saturday PM-Sunday Noon: E166 Polarized Positron Production Test Then Sunday PM-Monday PM: POWER Meeting (see Gudi Moortgat-Pick)
E-166 Activities EPAC/SLAC Approval in June, 2003 Formation of Background Test Review Committee, June 2003 Mini-Workshop on E166 Backgrounds: July, 2003 E166 Collaboration Meeting: October, 2003 Background Test Review: October 31, 2003 SLAC Tech. Div. Schedule Discussion: Week of November 3, 2003 EPAC Status Report: November 14-15, 2003
E-166 Activities, cont’d T467: Detector and DAQ Development in FFTB: since April, 2003 Installation of Background Test equipment: February, 2004 Background Tests: February-July, 2004, tbd E166 Polarized Positron Production: January, 2005
E166 Background Test T467: Background Test and Beam Results: Achim Weidemann Beam Tuning Strategies: Franz-Josef Decker Simulations: Overview-what do we want: John Sheppard Background simulation for E166: Yuri Batygin CsI Shielding: Gary Bower Results from FLUKA: Vinod Bharadwaj