60 likes | 187 Views
MUCOOL Collaboration Meeting October 2002. WELCOME. Liq. H RF Liq. H RF Liq. H. MUCOOL Goal: Develop & test all of the components needed for a cooling channel. 5T Cooling Channel Solenoid – LBNL & Open Cell NCRF Cavity operated at Lab G – FNAL. Bolometer detectors for
E N D
Liq. H RF Liq. H RF Liq. H MUCOOL Goal: Develop & test all of the components needed for a cooling channel 5T Cooling Channel Solenoid – LBNL & Open Cell NCRF Cavity operated at Lab G – FNAL Bolometer detectors for Window Beam profile Measurements– U. Chicago High-Gradient RF Tests in High Magnetic Field – FNAL Liq.H Absorber – KEK To be tested at FNAL Thin absorber windows Tested – new technique – ICAR Universities Tested Be-Windows for RF Cavities -- LBNL COOLING CHANNEL DESIGN
Lots to consider New Results New Ideas Timescales in the face of tough budgets Development of prototype MICE components
Tuesday Morning 10/22 08:00 Continental breakfastChair: D. Kaplan 08:30 S. Geer MUCOOL Introduction08:45 M. Popovic MUCOOL Test Facility - status & plans09:15 D. Errede MUCOOL Test Facility instrumentation - status & plans09:35 C. Johnstone MUCOOL Test Facility beamline - status & plans10:00 CoffeeChair: D. Errede 10:20 M-A. Cummings Absorber overview10:50 W. Lau Window design11:10 E. Black Forced-flow absorber design11:30 Discussion12:00 Lunch
Tuesday Afternoon 10/22 Chair: A. Bross 13:30 J. Greenwood Absorber window tests14:00 J. Norem Schlieren flow tests14:15 M.-A. Cummings Absorber safety14:45 D. Summers Absorber window manufacture15:05 Discussion15:20 Coffee Chair: M. Zisman 15:40 S. Ishimoto Convection-cooled absorber16:00 K. Cassel Convection analyses16:20 Yang/Lau Convection analyses16:40 Discussion17:00 K. Hoffman Bolometry17:30 A. Bross Fast timing detector R&D
Wednesday Morning 10/2308:00 Continental breakfast Chair: R. Johnson08:30 A. Moretti Lab G results - 109:00 D. Li Lab G results - 209:30 Y. Torun Lab G results - 310:00 Coffee Chair: S. Geer 10:20 Moretti/Norem Lab G plan10:50 Discussion 11:00 D. Li 201 MHz cavity design & plan11:20 J. Staples 201 MHz cavity simulations11:35 M. Alsharo'a Grid R&D design & plan11:55 R. Johnson High-pressure RF R&D12:15 MUCOOL wrap-up discussion12:30 Lunch13:30 Start of MICE Meeting