1 / 6

MUCOOL Collaboration Meeting October 2002

MUCOOL Collaboration Meeting October 2002. WELCOME. Liq. H RF Liq. H RF Liq. H. MUCOOL Goal: Develop & test all of the components needed for a cooling channel. 5T Cooling Channel Solenoid – LBNL & Open Cell NCRF Cavity operated at Lab G – FNAL. Bolometer detectors for

xanti
Download Presentation

MUCOOL Collaboration Meeting October 2002

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MUCOOLCollaboration MeetingOctober 2002 WELCOME

  2. Liq. H RF Liq. H RF Liq. H MUCOOL Goal: Develop & test all of the components needed for a cooling channel 5T Cooling Channel Solenoid – LBNL & Open Cell NCRF Cavity operated at Lab G – FNAL Bolometer detectors for Window Beam profile Measurements– U. Chicago High-Gradient RF Tests in High Magnetic Field – FNAL Liq.H Absorber – KEK To be tested at FNAL Thin absorber windows Tested – new technique – ICAR Universities Tested Be-Windows for RF Cavities -- LBNL COOLING CHANNEL DESIGN

  3. Lots to consider New Results New Ideas Timescales in the face of tough budgets Development of prototype MICE components

  4. Tuesday Morning 10/22 08:00   Continental breakfastChair: D. Kaplan 08:30  S. Geer         MUCOOL Introduction08:45  M. Popovic      MUCOOL Test Facility - status & plans09:15  D. Errede       MUCOOL Test Facility instrumentation - status & plans09:35  C. Johnstone    MUCOOL Test Facility beamline - status & plans10:00   CoffeeChair: D. Errede 10:20 M-A. Cummings   Absorber overview10:50 W. Lau          Window design11:10 E. Black        Forced-flow absorber design11:30     Discussion12:00   Lunch

  5. Tuesday Afternoon 10/22 Chair: A. Bross 13:30 J. Greenwood    Absorber window tests14:00 J. Norem        Schlieren flow tests14:15 M.-A. Cummings  Absorber safety14:45 D. Summers      Absorber window manufacture15:05    Discussion15:20    Coffee Chair: M. Zisman 15:40 S. Ishimoto   Convection-cooled absorber16:00 K. Cassel     Convection analyses16:20 Yang/Lau      Convection analyses16:40   Discussion17:00 K. Hoffman    Bolometry17:30 A. Bross      Fast timing detector R&D

  6. Wednesday Morning 10/2308:00  Continental breakfast Chair: R. Johnson08:30 A. Moretti  Lab G results - 109:00 D. Li          Lab G results - 209:30 Y. Torun       Lab G results - 310:00    Coffee Chair: S. Geer 10:20 Moretti/Norem Lab G plan10:50   Discussion 11:00 D. Li         201 MHz cavity design & plan11:20 J. Staples    201 MHz cavity simulations11:35 M. Alsharo'a  Grid R&D design & plan11:55 R. Johnson    High-pressure RF R&D12:15   MUCOOL wrap-up discussion12:30    Lunch13:30     Start of MICE Meeting

More Related