TGs LA Closing Report Author: Date: 2011-01-20 Dee Denteneer (Philips)
Abstract TGs closing report for the January 2011 meeting. Extensively discussed most likely timeline, which would lead to a request for Unconditional Approval in July and a publication date around September 2011. Worked on resolutions to the comments received during the first Sponsor Ballot. Expect a first recirculation after the TG s ad hoc in Munich Dee Denteneer (Philips)
Status • Before meeting • TGs passed its first Sponsor Ballot based Draft 8.0 with 95.6% approval rate (closed: January 10 2011). • We received 367 technical comments • During meeting • Reviewed the timeline, joint with a REVmb and in the editors’ meeting. • Resolved comments Dee Denteneer (Philips)
Timeline review • During meeting, we reviewed the timeline, joint with a REVmb and in the editors’ meeting; see 11-11/107r1. Dee Denteneer (Philips)
Comment resolution • During meeting, we resolved 290 comments, or approximately 80% of the comments received in the recirculation; see 11-11/0027r5. Straw polls gave clear directions on the resolutions of remaining comments. Dee Denteneer (Philips)
Plan First recirculation targeted mid february after the Eindhoven ad hoc, February 7-9, hosted by Philips Prepare tutorial for March plenary