1 / 40

Tour numérique DMG CTX ALPHA 500

Tour numérique DMG CTX ALPHA 500. CTX APHA 500 2 broches 2 axes C (+/- 0.003) Axe Y (+/- 40mm) Ф maxi : 500mm Ф usinable: 200mm L usinable: 500mm Tourelle outils: 12 postes Outils entrainés: 12 Porte outils: VDI 3425 Règle optique axe X Package d’outils

gerard
Download Presentation

Tour numérique DMG CTX ALPHA 500

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tour numérique DMG CTX ALPHA 500 Alain Roussel 26 Novembre 2010

  2. CTX APHA 500 2 broches 2 axes C (+/- 0.003) Axe Y (+/- 40mm) Ф maxi : 500mm Ф usinable: 200mm L usinable: 500mm Tourelle outils: 12 postes Outils entrainés: 12 Porte outils: VDI 3425 Règle optique axe X Package d’outils Commande numérique Siemens 840D DMG ERGO line Control et shop Turn Alain Roussel 26 Novembre2010

  3. L’architecture de la Machine Alain Roussel 26 Novembre2010

  4. Caractéristiques principales de la machine: Alain Roussel 26 Novembre2010

  5. Alain Roussel 26 Novembre2010 5

  6. Implantation Alain Roussel 26 Novembre2010

  7. Les réalisations Alain Roussel 26 Novembre2010

  8. Le pupitre de commande Alain Roussel 26 Novembre2010

  9. Les logiciels de commande Alain Roussel 26 Novembre2010 9

  10. Valeurs ajoutées d’un tour numérique avec un axe de fraisage. • Modernisation du parc actuel • Pilotage par commande numérique • Précision des usinages, modifications rapides des programmes • Répétabilité dimensionnelle des usinages • Pièces finies sans démontage et sans perte de référence • Usinage de formes complexes • Préparation des programmes en temps masqué (FAO) • Sécurité pour les utilisateurs Alain Roussel 26 Novembre2010 10

  11. Emplacement dans l’atelier Alain Roussel 26 Novembre2010 11

  12. Equipement 2011 – Tour numérique • Coût du projet 140k€ HT+9k€ • coFinancement du Projet • Ministère 41k€ HT • OCA 9k€ HT • S2M 4K€ HT • FIZEAU/GEOASUR 15K€ HT • MRCT 80K€ HT • INSU 20K€ HT Alain Roussel 26 Novembre2010 12

  13. Un peu d’histoire Alain Roussel – Dominique Cruzalèbes 26 Novembre2010

  14. HISTORIQUE du Bâtiment Machine à vapeur charbon Alain Roussel 26 Novembre2010

  15. Avant 2005 Alain Roussel 26 Novembre2010

  16. -Maintenant S2M- Alain Roussel 26 Novembre2010

  17. - S2M - Alain Roussel 26 Novembre2010

  18. Alain Roussel – Dominique Cruzalèbes 26 Novembre2010

  19. Recrutement demandé O.C.A / S2M pour 2011 - Poste de mécanicien : Technicien d’atelier Poste CUI 24 mois : Thierry PARRA - Stagiaire en productique Lycée Don Bosco 2 stagiaires 1er année bac pro 1 mois Formation adulte 3 semaines Alain Roussel – Dominique Cruzalèbes 26 Novembre2010

  20. Budget – Recettes 2010 OCA 2009 – Quadriennal 8 000.00 € Facturations travaux20082009 2010 MEN850.00 €4415,00 € 3 286,25 € CNRS1 050.00 € 6 270,00 € 8 677,46 € 24 548,71 € Total recettes S2M (Quadriennal + Facturations)32 548,71 € Report 2009 CNRS 11 338.72 € Total recettes 43 887,43 € Reste à percevoir (MEN et CNRS)6 673,80 € Alain Roussel – Dominique Cruzalèbes 26 Novembre2010

  21. Dépenses Fonctionnement/Equipement 2010 : - Outillages 11 861,66 € 27,03 % -Anodisation277,30 € 0,06 % -Fournitures + Divers1 163,43 € 0,27 % - Missions484,90 € 0,11 % - Equipement 1 103,65 € 0,25 % Total dépenses 14 890,94 € 33,93 % Dont crédits MEN 11 926,99 € 100,00 % crédits CNRS 2 963,95 € 6,75 % Total recettes43 887,43 € 100,00 % Alain Roussel – Dominique Cruzalèbes 26 Novembre2010

  22. Prévisionnel 2011 Fonctionnement - Outillages 9 k€ - Traitement de surface 1 k€ - Fournitures + Divers 1 k€ - Missions 1 k€ - Maintenance logiciel 1,5 k€ Alain Roussel – Dominique Cruzalèbes 26 Novembre2010

  23. Equipement 2011 -Demande tour numérique 140 k€ (cofinancement) - machine numérique 4 k€ Informatique 1 k€ Instruments de contrôle 1 k€ Alain Roussel – Dominique Cruzalèbes 26 Novembre2010 23

  24. Locaux :Aménagement 2011 Phase B : zone de montage et espace de contrôle Début des travaux 1er semestre 2011 Coût de l’opération : 93 k€ Alain Roussel – Dominique Cruzalèbes 26 Novembre2010

  25. Les travaux 2011 Alain Roussel – Dominique Cruzalèbes 26 Novembre2010 25

  26. Les travaux 2011 Alain Roussel – Dominique Cruzalèbes 26 Novembre2010 26

  27. Zone actuelle de tests Alain Roussel – Dominique Cruzalèbes 26 Novembre2010 27

  28. Travaux 2010 Calern : Picard sol, sirius, Samain, Artémis, Dieudonné, Tarot, Observatorium, Persée, Collège de France, Dieudonné, 470 h Nice : 14 demandes Dieudonné, Artémis, Matisse, DPI, lpmc, GéoAZUR, PBL, Observatorium, Divers 491 h Alain Roussel – Dominique Cruzalèbes 26 Novembre2010 28

  29. Travaux année 2011 Persée modification du module source de référenceEtude et fabrication 1mois/ 100h Matisse maquette ascenseur (système de verrouillage) Fabrication 60h Validation des supports miroirs à aiguilles Fabrication 100h Glissières à lames Fabrication 50h Equipement de tests de vibrations sur miroirs OMN/OML Fabrication 30h Périscope Fabrication 100h POLV in situ (OOV) Etude et fabrication 2mois/300h Réhabilitation des télescopes (soir d’été)Etude et fabrication 1mois/200h DIEUDONNE suite (50h) ARTEMIS ? IPMC? INLN ? Géo Azur projet Fabrication + instrumentation (12,5k€) Total 860h Alain Roussel – Dominique Cruzalèbes 26 Novembre2010

  30. Galerie des travaux Persée Alain Roussel – Dominique Cruzalèbes 26 Novembre2010 30

  31. Modification du module source de PERSEE Alain Roussel – Dominique Cruzalèbes 26 Novembre2010

  32. Caméra Structure Tripode support moteur Double bassin Ballast Laboratoire DIEUDONNE Germain Rousseau Maissa Philippe Alain Roussel – Dominique Cruzalèbes 26 Novembre2010 32

  33. DIEUDONNE Germain Rousseau Philippe Maissa Coin à vagues sur parallélogramme Alain Roussel – Dominique Cruzalèbes 26 Novembre2010

  34. ARTEMIS Alain Roussel – Dominique Cruzalèbes 26 Novembre2010 34

  35. PBL Alain Roussel – Dominique Cruzalèbes 26 Novembre2010

  36. Alain Roussel – Dominique Cruzalèbes 26 Novembre2010

  37. Atelier de Nice Alain Roussel – Dominique Cruzalèbes 26 Novembre2010

  38. Atelier de Calern Alain Roussel – Dominique Cruzalèbes 26 Novembre2010

  39. Questions diverses Une évolution du S2M S3M Sébastien OTTOGALLI Date de la prochaine réunion du Comité des Programmes Alain Roussel – Dominique Cruzalèbes 26 Novembre2010

  40. vous remercie de votre participation Alain Roussel – Dominique Cruzalèbes 26 Novembre2010