Mourad-MERZOUGUI -Meeting ASTEP Le 17 juillet 2008

Télescope ASTEP. Virole. Caisson. Mourad-MERZOUGUI -Meeting ASTEP Le 17 juillet 2008. Présentation. Télescope ASTEP. BOULE. Rotule tige1. Manchon 1. Tubes en carbone. Manchon 2. Rotule tige 2. Bride rotule. Base rotule. Caisson.

geri
Download Presentation

Mourad-MERZOUGUI -Meeting ASTEP Le 17 juillet 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Télescope ASTEP Virole Caisson Mourad-MERZOUGUI -Meeting ASTEP Le 17 juillet 2008

  2. Présentation Télescope ASTEP BOULE Rotule tige1 Manchon 1 Tubes en carbone Manchon 2 Rotule tige 2 Bride rotule Base rotule Caisson Mourad-MERZOUGUI -Meeting ASTEP Le 17 juillet 2008

  3. Télescope ASTEP Pièces à réaliser Mourad-MERZOUGUI -Meeting ASTEP Le 17 juillet 2008

  4. Mourad-MERZOUGUI -Meeting ASTEP Le 17 juillet 2008

  5. Temps estimé: • Réalisation des pièces à l’OHP du 01/09/2008 au 30/09/2008 • Toutes les pièces en sous traitance ,délai 2 mois • Concept et réalisation de l’outillage Octobre • Montage réglage de l’ensemble télescope début Décembre • Livraison du télescope avec procédures fin décembre Propositions de modifications: • Manchon 2 modification du M14 x 1,5 ou M12x1 • Manchon 1 modification du M12x1 • Rotule tige1 et 2 M14x1,5 ou M12x1 d’un cote et de l’autre M12x1 Mourad-MERZOUGUI -Meeting ASTEP Le 17 juillet 2008