LAUREL STREET OVERCROSSING 1/16/2014. Partnership. This is a City of San Diego project on a City owned bridge The State is a partner in order to facilitate the engineering The Federal government is funding the majority of the construction cost The State has contributed close to $5 million.
E N D
Partnership • This is a City of San Diego project on a City owned bridge • The State is a partner in order to facilitate the engineering • The Federal government is funding the majority of the construction cost • The State has contributed close to $5 million
SUMMARY OF PROJECT • Rehabilitate external surface concrete & power wash bridge • Make it STRONGER • Retrofit the columns with more concrete and tensioned cables • Tie it horizontally with post tensioning and steel pins - to restrain the mid-span joints • Deck: Replace existing pavement , improve deck drainage • Abutments: Rehabilitate all concrete, improve access for inspectors • Install accent lighting
Rehabilitate the undersides especially the mid-span joint area on the arches
Make the Bridge Stronger Retrofit: Add 10” of thickness and tensioned cables @ east/west walls
Make the Bridge Stronger Install post tensioning, steel shear pins and new concrete to restrain the mid-span joints Joint Detail
Footings: To remain undisturbed Pier 4, existing view
Accent/Aesthetic Lighting Pier 4, Photo simulation of light standard in ground at night
CONSTRUCTION SCHEDULE June 2014