Arterial Street Rehabilitation for Riverside Drive 24 th Street to 35 th Street. Public Informational Meeting July 22, 2014. Introductions. Doug Helt , P.E. City of Tulsa Transportation Lead Brooke Caviness, P.E. City of Tulsa Senior Engineer / Project Manager Tim Morgan, P.E.
E N D
Arterial Street Rehabilitation for Riverside Drive24th Street to 35th Street Public Informational Meeting July 22, 2014
Introductions • Doug Helt, P.E. City of Tulsa Transportation Lead • Brooke Caviness, P.E. City of Tulsa Senior Engineer / Project Manager • Tim Morgan, P.E. HNTB Corporation Project Manager
Overview • Roadway Improvements • Stormwater Improvements • Water Main Improvements • Sanitary Sewer Improvements • Anticipated Project Schedule • Questions
Roadway Improvements Roadway Geometry Improved = Safer Drive
Roadway Improvements • 35 mph Speed Limit • Median Separation Through Park • Lane Widths Increased • New Lighting (LED)
Stormwater Improvements • Travis Park RCB System • Swan Creek RCB System • Crow Creek Bridge Replaced • Riverside Drive Storm System Upgraded
Stormwater Improvements Pre-Project Storm Conveyance System
Stormwater Improvements Post-Project Storm Conveyance System
Water Main Improvements • Riverside Drive 12” Water Main • Gathering Place 8” Water Main • Creating Looped Water Main Systems • Improved Function and Flow in Neighborhoods
Water Main Improvements Pre Project Water Main Network
Water Main Improvements Post Project Water Main Network
Sanitary Sewer Improvements • Existing Systems are 60-100 years old • Reconstruction of Major Sanitary Mains • High Strength Fiberglass for New Systems • No Impact to Users
Sanitary Sewer Improvements Pre-Project Sanitary Sewer Network
Sanitary Sewer Improvements Sanitary Sewer Replacements
Anticipated Project Schedule • Fall 2014 - Construction Contract Award • Winter 2014/2015 - Construction Begins • Spring 2015 - Riverside Drive Closure • 2016 - Riverside Drive Pavement Construction • 2017 - Project Completed