Facilities Facilities section is the first step in Division 1 that applies coding to determine what is going to be in the RFP. In the selected facilities step the project listed is based on what Facility Type was selected when you started the RFP Wizard project or whenever you go to edit the project. This selection determines what remover is used in 2.0 Scope portion of RFP.
Additional Requirements Information from the additional Requirements is from two different templates. The replacers are and found in paragraph 2 of RFP and everything else from the Additional Requirements step are for removers found in chapter 5 General Technical Requirements section of RFP. • Replacers: • SITE_ACRES_AVAILABLE • GFGI_ITEMS • Removers: • COMMISSIONING_OPTION_1 • COMMISSIONING_OPTION_2 • COMMISSIONING_OPTION_3 • LEED3 • LEED2_2 • WAIVE for parking underdrain system check box • PARKING_OPTION_1 • PARKING_OPTION_2 • PARKING_OPTION_3 • PARKING_OPTION_4 • VEHICLE_OPTION_1 • VEHICLE_OPTION_2 • VEHICLE_OPTION_3 • NON_WATER_URINALS • WATER_URINALS • NON_PREF_URINALS • Removers (cont.) • UMCS_NO • UMCS_BACNET • BACNET • DIACAP_CERT • DIACAP_PART • DIACAP_PART_CERT • WEBBASED • UMCS_INTEGRATE_NO • UMCS_INTEGRATE • INTEGRATE • LNS • STANDALONE • NONE • LONWORKS • NEW • NEW_LNS_NONLNS • STANDALONE_LON • CONFIG_OCC • OCC_MODE • NEW_NO • NEW_LNS_NONLNS_NO • NEW_LNS
Access Control Point • Facilities • ACP • Facility Subtype • Additional Requirements (same as generic)
Access Control Point • Access Control Point • (ACP) have multiple subtypes listed below. The only major step change is the step below ACP which list the facility subtype. • Facility Removers • Gatehouse ACP_GH ACP_GH_NO • Guard Booths ACP_GBACP_GB_NO • ID Check Area and Canopy ACP_IDCACACP_IDCAC_NO • Overwatch Position ACP_OWACP_OW_NO • Passenger Vehicle Search Area and Canopy ACP_PVSACACP_PVSAC_NO • Pedestrian Guard Booth ACP_PGBACP_PGB_NO • Search Area Building ACP_SABACP_SAB_NO • Truck Search Area and Canopy ACP_TSACACP_TSAC_NO • Visitor Control Center ACP_VCCACP_VCC_NO
Gatehouse • Replacers • ACP_GH_BALL_RESISTANCE • Removers • ACP_GH_NO • ACP_GH • ACP_GH_ROOF_PROTECTION
Guard Booths • Replacers: • ACP_GB_TYPE • ACP_GB_BALL_RESISTANCE • Removers: • ACP_GB_NO • ACP_GB • ACP_GB_ROOF_PROTECTION
Search Area Building • Removers: • ACP_SAB_NO • ACP_SAB • Replacers: • ACP_SAB_TYPE • ACP_SAB_GSF • ACP_SAB_ADDITIONAL_FEATURES
ID Check Area and Canopy • Removers: • ACP_IDCAC_NO • ACP_IDCAC • Replacers: • ACP_IDCAC_DEMAND • ACP_IDCAC_NUM_LANES
Advanced Individual Training Complex (AIT) • Facilities • AIT • Facility Subtype • Additional Requirements (same as generic)
AIT • This is the same form for all the AITs. • Replacers: • AIT_HARDWARE_FINISH_CODE • AIT_KEYING_SYSTEM • AIT_KEY_MANUFACTURER • Removers: • AIT_POV_NO • AIT_POV_YES • AIT_TRASH_DUMP • AIT_RECYC_DUMP • AIT_PT_NO • AIT_PT_YES • AIT_LOCKBOX_NO • AIT_LOCKBOX • SOLARWATER_HEATING_AIT • AIT_SMOKE1 • AIT_SMOKE2 • AIT_SMOKE3 • AIT_SMOKE4 • AIT_CW • AIT_SCD • AIT_VM • AIT_AEE • AIT_DUMP
B/COF • Replacers: • AITCOF_NUMBER • Removers: • AIT_FAN_YES • AIT_BOOTWASH • AIT_BOOTSCRAPER • AITCOF_NO • AITCOF
CCP • Replacers • AITCCP_MAX_GROSS • Removers: • AITCCP_NO • AITCCP
LEB • Replacers: • AITLEB_MAX_GROSS • Removers: • AITLEB_NO • AITLEB
Army Community Service Center (ACSC) • Replacers: • ACSC_SIZE • Removers: • ACSC
ACSC Additional Requirements • Replacers: • ACSC_KEYING_SYSTEM • Removers: • ACSC_MASS_YES • ACSC_MASS_NO • SOLARWATER_HEATING_ACSC • SOLARWATER_HEATING_ACSC_NO • ACSC_RANGE • ACSC_RANGE_NO • ACSC_DISPOSER • ACSC_DISPOSER_NO
Army Continuing Education System (ACES) • Replacers: • EDUCATE_MAX_AREA • Removers: • ACES
Army Fire Station (AFS) • Replacers: • AFS_FACILITY_TYPE • AFS_TYPE • AFS_STORIES • AFS_SIZE • EMS_PROVIDED • AFS_VEHICLES_ACCOMMODATED • AFS_ENTRANCE_SHELTER_TYPE • Removers: • AFS • AFS_HQ_2_3CO
Automated Combat Pistol/MP Firearms Qualification Course (CPQC/MPFQC)
Automated Combat Pistol/MP Firearms Qualification Course (CPQC/MPFQC) • Replacers: • CPQC_NNE • CPQC_PEI • CPQC_NNEUXO • CPQC_UXO • CPQC_ADA • CPQC_ATFP • Removers: • CPQC
Downrange Area • Replacers: • CPQC_LANES_STD • CPQC_LANES_NONSTD • CPQC_LANES_QTY • CPQC_LANES_WIDTH • CPQC_LANES_PERLANE • CPQC_WALK_GRAVEL • CPQC_WALK_OTHER • CPQC_WALK_SPECIFY • CPQC_MARKERS_LIMIT • CPQC_MARKERS_NIGHT • CPQC_MARKERS_LANE • CPQC_MARKERS_FIRING • CPQC_MARKERS_INTER • CPQC_EMP_BELOW • CPQC_EMP_ABOVE • CPQC_EMP_COMBO • CPQC_EMPMAT_CON • CPQC_EMPMAT_OTHER • CPQC_EMPMAT_SPECIFY • CPQC_POWER_HARD • CPQC_POWER_HARDPLUS • CPQC_POWER_BTRY • CPQC_POWER_OTHER • CPQC_POWER_SPECIFY • CPQC_BARRICADE_CONCRETE • CPQC_BARRICADE_CMU • CPQC_BARRICADE_OTHER • CPQC_BARRICADE_SPECIFY
ROC Tower • Replacers: • CPQC_TOW_QTY • CPQC_TOW_HEIGHT • CPQC_TOW_OBS • CPQC_TOW_CONS_DISC • CPQC_TOW_CONS_CMU • CPQC_TOW_CONS_METAL • CPQC_TOW_CONS_OTHER • CPQC_TOW_CONS_SPECIFY • CPQC_TOW_BI_EL • CPQC_TOW_BI_DN • CPQC_TOW_BI_LP • CPQC_TOW_BI_C2 • CPQC_TOW_BI_PA • CPQC_TOW_BI_TEL • CPQC_TOW_BI_COPFIB • CPQC_TOW_BI_FE • CPQC_TOW_BI_FD • CPQC_TOW_HVAC_POWER • CPQC_TOW_HVAR_BOTH • ZERO_TOW_HVAC_HEAT • CPQC_TOW_HVAC_FREEZE • CPQC_TOW_HVAC_VENT • CPQC_TOW_OTHER
OSB • Operations Storage Building (OSB) • Replacers: • CPQC_OSB_QTY • CPQC_OSB_CONS_DISC • CPQC_OSB_CONS_METAL • CPQC_OSB_CONS_OTHER • CPQC_OSB_CONS_SPECIFY • CPQC_OSB_BI_EL • CPQC_OSB_BI_DN • CPQC_OSB_BI_LP • CPQC_OSB_BI_INET • CPQC_OSB_BI_TEL • CPQC_OSB_BI_COPFIB • CPQC_OSB_BI_FE • CPQC_OSB_BI_FD • CPQC_OSB_HVAC_POWER • CPQC_OSB_HVAC_BOTH • CPQC_OSB_HVAC_HEAT • CPQC_OSB_HVAC_FREEZE • CPQC_OSB_HVAC_VENT • CPQC_OSB_OTHER
Classroom Facility • Replacers: • CPQC_GIB_QTY • CPQC_GIB_CONS_DISC • CPQC_GIB_CONS_METAL • CPQC_GIB_CONS_OTHER • CPQC_GIB_CONS_SPECIFY • CPQC_GIB_BI_EL • CPQC_GIB_BI_DN • CPQC_GIB_BI_LP • CPQC_GIB_BI_DC • CPQC_GIB_BI_INET • CPQC_GIB_BI_TEL • CPQC_GIB_BI_COPFIB • CPQC_GIB_BI_FE • CPQC_GIB_BI_FD • CPQC_GIB_HVAC_POWER • CPQC_GIB_HVAC_BOTH • CPQC_GIB_HVAC_HEAT • CPQC_GIB_HVAC_FREEZE • CPQC_GIB_HVAC_VENT • CPQC_GIB_OTHER
Covered Mess • Replacers: • CPQC_CM_QTY • CPQC_CM_CONS_DISC • CPQC_CM_CONS_METAL • CPQC_CM_CONS_OTHER • CPQC_CM_CONS_SPECIFY • CPQC_CM_BI_EL • CPQC_CM_BI_DN • CPQC_CM_BI_LP • CPQC_CM_OTHER
Ammunition Breakdown Building • Replacers: • CPQC_ABB_QTY • CPQC_ABB_CONS_DISC • CPQC_ABB_CONS_CMU • CPQC_ABB_CONS_METAL • CPQC_ABB_CONS_OTHER • CPQC_ABB_CONS_SPECIFY • CPQC_ABB_BI_EL • CPQC_ABB_BI_DN • CPQC_ABB_BI_LP • CPQC_ABB_BI_FE • CPQC_ABB_BI_FD • CPQC_ABB_HVAC_POWER • CPQC_ABB_HVAC_BOTH • CPQC_ABB_HVAC_HEAT • CPQC_ABB_HVAC_FREEZE • CPQC_ABB_HVAC_VENT • CPQC_ABB_OTHER