1 / 3

eSENS WP3: Task 3.1

eSENS WP3: Task 3.1. Preparation phase : M1-M6 EE (2) +DE(1), GR(1), IT(2), LU(4), NL(2), TR(2), OpenPEPOL(1) Task leader: Jaak Tepandi; jaak@tepandi.ee T3.1.1 Documentation of format and defining criteria T3.1.2 Research update and input for the analysis

glenda
Download Presentation

eSENS WP3: Task 3.1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. eSENS WP3: Task 3.1 • Preparation phase: M1-M6 • EE(2) +DE(1), GR(1), IT(2), LU(4), NL(2), TR(2), OpenPEPOL(1) • Task leader: Jaak Tepandi; jaak@tepandi.ee • T3.1.1 Documentation of format and defining criteria • T3.1.2 Research update and input for the analysis • D3.1 Guidelines to the assessment the sustainability and maturity of building blocks

  2. eSENS WP3: Task 3.1 • Defining criteria in line with the EIA and EIF in ccoperation with WP6 and WP5 • Based on CAMSS methodology • Input: • D5.1 requirements framework • D6.1 baseline architecture • Library: http://joinup.ec.europa.eu/ and former LSP material • Output: Guidelines to the assessment the sustainability and maturity of building blocks

  3. Task 3.1: First Steps • Identifying stakeholders for cooperation/ consulting • Establishing connections, esp with WP6 and WP5 • Developing / agreeing assessment principles • First draft of the guidelines for discussions Thank you!

More Related