Steven Cooley Rich Luquette Greg Marr Scott Starin

Micro-Arcsecond X-ray Imaging Mission, Pathfinder (MAXIM-PF). Flight Dynamics. Steven Cooley Rich Luquette Greg Marr Scott Starin. May 13-17, 2002. 5cm control 15 m m Knowledge. 200 km +/- 5 m. Requirements & Assumptions (1 of 2). Phase 1. Detector S/C. Optics Hub S/C. Phase 2.

gpayton
Download Presentation

Steven Cooley Rich Luquette Greg Marr Scott Starin

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Micro-Arcsecond X-ray Imaging Mission, Pathfinder (MAXIM-PF) Flight Dynamics Steven Cooley Rich Luquette Greg Marr Scott Starin May 13-17, 2002

  2. 5cm control 15 mm Knowledge 200 km +/- 5 m Requirements & Assumptions (1 of 2) • Phase 1 Detector S/C Optics Hub S/C • Phase 2 Optics Hub S/C 5cm control 15 mm Knowledge 20,000 km +/- 5 m Detector S/C FreeFlyer S/C 100-500 m separation Control to ~10 microns MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  3. Requirements & Assumptions (2 of 2) • Mission Orbit • L2 Lissajous • Heliocentric “Drift-Away” • Variations on Drift Away (e.g., DROs stay closer to Earth) • Orbit Control and Knowledge Requirements • Orders of Magnitude above Current Operational Missions • Not Addressed Here • V and Acceleration Magnitude Values • Very Coarse Approximations • No Noise • CRTBP or Free Space Model • No Perturbations (Moon, Jupiter, etc.) • No Navigation Errors • Further Analysis Required MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  4. Lissajous Orbit Option • Orbit Characteristics • Quasi Orbit Period of ~6 months • Can Choose small or Large Amplitude Lissajous • No Earth Eclipses • MAXIM Adds Requirement of No Lunar Shadows (MAP) • Advantages • Spacecraft do not Drift too Far from Earth • Communications (High Data Rate Missions) • Spacecraft can be More Easily Replaced/Repaired • Important for Long Missions • Small Launch Vehicle C3 (-2.6 for Phasing Loops, -0.7 for Direct) • Disadvantages • Unstable Complicated Dynamics • Can Lose Spacecraft (e.g., Propulsion Failure) • All s/c in formation require propulsion (Operational Complexity) • Formation Keeping Costs May be Greater (Further Analysis Needed) • May Have increased variation in Formation Keeping Control Acceleration Magnitude (Harder to size thrusters) • 6 Month Transfer Time • High Thrust Propulsion System Likely Needed (Need to Correct LV Errors QUICKLY) MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  5. Heliocentric Orbit Option • Orbit Characteristics • Drift Away Orbit (0.1 AU/year) • Advantages • Stable Dynamics • Simpler Operations • Potentially No Orbit Overhead Costs • Optics Hub may Not need propulsion • Relatively Short Transfer Times • May Require Less Formation Keeping Costs (?) • May be Able to Eliminate Need for High Thrust Propulsion System • Disadvantages • Higher Launch Vehicle C3 (0.4) • Drift Away Concerns MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  6. Lissajous Orbit Option Phase 1 MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  7. Lissajous Orbit Description(Phase 1) • Desired Characteristics • Two S/C in formation, 200km apart • Maintain inertial orientation of SC-to-SC line for 1 week observation • Optics Hub follows a ‘Ballistic’ lissajous orbit during Observation (the “Leader”) • Detector SC (the “Follower”) follows a shifted trajectory • For Given Observation, Position differs by a constant baseline vector • Driving Requirements • Time allocated for reorienting the SC-to-SC line • SC-to-SC line remains inertially fixed during observation MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  8. Formation Initialization • Direct Transfer (One LV with a C3 of -0.7 km2/s2) • Large ‘Halo’ Orbit • No Lunar Shadows • Max L2-Earth-Vehicle Angle  30 • Orbit Does Not “Collapse” • Detector SC is maneuvered to the shifted orbit 200 km away • Consider Initialization V as 6 Formation Re-Orientations • FreeFlyers Stay Attached to Optics Hub MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  9. Formation KeepingSolar Radiation Pressure (SRP) • Acceleration Magnitude (1 AU)  4.5 x 10-6 (1+r) A/M (m/s2) • A = Cross Sectional Area exposed to Sun (m2) • M = Mass of Spacecraft (kg) • r = Reflection Factor. (r  [0,1]) • Approximate Result for all Mission Orbits Considered • SMAD (3rd Edition, not 2nd edition) • SRP Acceleration Magnitude Differential Between 2 Spacecraft •  4.5 x 10-6 | (1+r1) (A1/m1) – (1+r2) (A2/m2)| • Assumed Dominant Term for 200 km Baseline (CRTBP model) • Assume Control Acceleration Magnitude  10-6 m/s2 Needed MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  10. Optics Hub 10 200 km 200 km Detector at Obs 2 Detector at Obs 1 Distance Formation Re-OrientationFree Space Analysis (1/4) • Preliminary “Drift-Away” Orbit Results • For “small” reorientation times (< 1 week), solar gravity has “small” effect on V costs. • Free space analysis (ie, gravity free) is a reasonable approximation for small reorientation times in a “Drift Away” • Further Study Needed (Especially for Applicability to Lissajous Orbits) MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  11. Formation Re-OrientationFree Space Analysis (2/4) • Impulsive Burn Analysis • One burn after obs 1 initiates translation of detector to the obs 2 location • Magnitude: VImpulse = distance / reorientation time • Equal but opposite burn stops translation when obs 2 location is reached • Total V = 2* VImpulse • Continuous Thrust Analysis • Acceleration is constant toward obs2 location for first half of the time • Acceleration is of the same magnitude, but reversed for the remaining time • Total V (m/s) = 4*Vimpulse • Acceleration = 4*Vimpulse / reorientation time = 4*distance/ (reorientation time)2 MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  12. Formation Re-OrientationFree Space Analysis (3/4) • V Costs (both Continuous and Impulsive) • Linear Relationship with Distance • Inverse Linear Relationship with Re-Orientation Time • Control Acceleration Magnitude (Continuous) • Linear Relationship with Distance • Inverse Square Relationship with Re-Orientation Time MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  13. Formation Re-OrientationFree Space Analysis (4/4) Notes: (1) 200 km baseline, (2) 10 re-orientation of Detector SC MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  14. Continuous Low Thrust SummaryDetector - Phase 1 Notes: (1) Formation Keeping Costs Highly Dependent on SRP and thus the relative A/M ratios for the spacecraft. (2) The Formation Re-Orientation Costs are based on Free Space Calculations. This number should be multiplied by a “CorrectionFactor” > 1 to account for the L2 orbit. Low Thrust Software Needed for Future Refinements. (3) The Formation Reorientation values are considered a “delta” above the baseline Formation Keeping costs. (4) All Numbers are Coarse approximations. MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  15. Lissajous Orbit Option Phase 2 MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  16. Optics Hub S/C 20,000 km 200 km Detector S/C (Phase 1) Detector S/C (Phase 2) 500 m FreeFlyer S/C Formation Initialization(Phase 2, 20000 km Baseline) • Possible Configuration • Optics Hub has Minimal or no Propulsion • Detector SC moves to a distance of 20,000 km from Optics Hub • FreeFlyer SC Separates from Optics hub to a maximum separation of 500 m • New Baseline May Require New Class of Continuous Thrusters for Detector SC MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  17. Formation Keeping(Phase 2) • Same 10-6 m/s2 from SRP Differential Assumed • Larger Baseline  Dynamics Plays a Greater Role • Control Acceleration Magnitude Depends on • Position of SC in its Orbit • Choice of Target • Sample Mission Orbit (Calculation Purposes Only) • Optics Hub at L2 • Detector SC moves in a Circle about L2 • 20,000 km Radius • In Ecliptic Plane • Clockwise Motion (360/yr) • Circular Restricted Three Body Problem • No Other Forces modeled • Control Acceleration  10-5 m/s2 • Combined Accel Mag  1.1 x 10-5 m/s2 MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  18. Formation Re-OrientationFree Space Analysis (Detector, Phase 2) Notes: (1) 20000 km baseline, (2) 10 re-orientation MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  19. Continuous Low Thrust SummaryDetector - Phase 2 Notes: (1) Formation Keeping Costs Highly Dependent on SRP and thus the relative A/M ratios for the spacecraft. (2) The Formation Re-Orientation Costs are based on Free Space Calculations. This number should be multiplied by a “Correction Factor” > 1 to account for the L2 orbit. Low Thrust Software Needed for Future Refinements. (3) The Formation Reorientation values are considered a “delta” above the baseline Formation Keeping costs. (4) All Numbers are Coarse approximations. MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  20. Continuous Low Thrust SummaryFreeFlyer - Phase 2 Notes: (1) Formation Keeping Costs Highly Dependent on SRP and thus the relative A/M ratios for the spacecraft. (2) The Formation Re-Orientation Costs are based on Free Space Calculations. This number should be multiplied by a “CorrectionFactor” > 1 to account for the L2 orbit. Low Thrust Software Needed for Future Refinements. (3) The Formation Reorientation values are considered a “delta” above the baseline Formation Keeping costs. (4) 500 m baseline (5) All Numbers are Coarse approximations. MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  21. DeltaV Analysis (All Phases) MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  22. DeltaV Summary (1 of 3) • L2 Propulsion Insertion Module • Carries All SC in Formation • Launch Vehicle Correction • Contingency • Mid-Course Correction (MCC) • Lissajous Orbit Insertion (LOI) • 200 m/s – High Thrust MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  23. DeltaV Summary (2 of 3) • Detector SC • 125 m/s High Thrust for Lissajous Stabilization and Contingencies • 25 m/s * 5 years • 32 m/s Continuous Low Thrust for Formation Keeping in Phase 1 • 1e-6 m/s2 * 1 yr • 117 m/s Continuous Low Thrust for Re-Orientation (1 day) in Phase 1 • (45 targets) * (1e-6 + 1.9 e-5) m/s2 * (1 day to reorient) * (Correction Factor of 1.5) • 1389 m/s Continuous Low Thrust for Formation Keeping in Phase 2 • 1.1 e-5 m/s2 * 4 yr • 2042 m/s Continuous Low Thrust for Re-Orientation (7 day) in Phase 2 • (45 targets) * (1.1 e-5 + 3.8 e-5) m/s2 * (7 day to reorient) * (Correction Factor of 1.5) MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  24. DeltaV Summary ( 3 of 3) • Optics Hub • 125 m/s High Thrust for Lissajous Stabilization and Contingencies • 25 m/s * 5 years • FreeFlyer SC (per SC) • 100 m/s High Thrust for Lissajous Stabilization and Contingencies • 25 m/s * 4 years • 380 m/s Continuous Low Thrust for Formation Keeping (Phase 2) • 1e-6 m/s2 * 4 yr * (Correction Factor of 3) • 13 m/s Continuous Low Thrust for Re-Orientation in 1 day (Phase 2) • (45 targets) * (1 e-6 + 4.7 e-8) m/s2 * (1 day to reorient) * (Correction Factor of 3) Notes: (1) In Phase 2, the Detector SC re-orients in 1 week while the FreeFlyers re-orient in 1 day. (2) All V values for all SC do not include engineering penalties, ACS Penalties, and cant angles. (3) Formation Re-Orientation (10) values include the necessary Formation Keeping contribution. (4) Double Counting of Formation Keeping costs during a Re-Orientation used to account for formation Acquisition Costs. (5) Formation Initialization Costs not explicitly listed here MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  25. Flight DynamicsTechnologies Required • Control Law algorithm development • Improved Control Performance • Collision Avoidance • Re-Acquisition of Formation after Re-Orientation • Simulation • Continuous Thrust model • High Fidelity Force model • Relative Navigation needed • Current Ground based Orbit Determination : 5 km position knowledge MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  26. Flight DynamicsAdditional Trades to Consider • Continuous Low Thrust Transfer to L2 • Feasibility of Using Low Thrust for Lissajous Stabilization • Consider Surface Coatings on SC or Other Methods to minimize SRP Differentials • Formation Keeping Costs are a function of Both Position in Orbit and Choice of Target. By judicious choice of target sequence, Some V Optimization can be Realized. • Detailed Trajectory Design Study to Include Lissajous vs. Heliocentric Trade • Heliocentric Orbits with Better Communication • Some can be Achieved Via Only Launch Vehicle Considerations • Distant Retrograde Orbits (~200 m/s) MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  27. Flight DynamicsIssues and Concerns • Continuous Thrusting will make OD more Difficult • Very Difficult to Choose Class (acceleration magnitudes) of Propulsion Systems Needed • Very Coarse Estimates of Control Acceleration Magnitudes • Different Phases of Mission • New Technology: Thrusters with Greater Range of Thrust Modulation? • Relative Orbit Position Control & Knowledge Requirements Orders of Magnitude above Current Operational Capability • Collision Avoidance • Further extensive analysis required • High fidelity simulation w/ all force perturbations and sensor/actuator noise and error • Control Law Evaluation • Continuous Low Thrust Simulations • Continuous Low Thrust Trajectory Optimization Software Needed MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  28. Supplementary Material MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  29. Miscellany • Satellite Operators Should employ strategies to balance the fuel usage amongst all the SC in the Formation MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  30. Supplementary Material – Lissajous Orbit MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  31. Sample Impulsive Re-Orientation (1 of 2)(20,000 km baseline, 10 in 7 days) • Force model • Full Ephemeris • Sun/Earth/Moon/Jupiter Point Mass • SRP • Both SC Have same A/M Ratio (Cr A/M = 0.013) • Initial Optics Hub State (ECI MJ2000) • UTC Gregorian Date: 23 Jan 2003 05:02:45.56 UTC Julian Date: 2452662.71024955 • X: -993733.7803065266900000 km Vx: -0.3149752411661734 km/sec • Y: 913746.5347422765300000 km Vy: -0.2540742769815505 km/sec • Z: 396534.8804631549300000 km Vz: -0.0421253073023613 km/sec • Initial Detector State • Offset Position by b1 = 20000*(1, 0, 0) • Identical Velocity • Final Optics Hub State • UTC Gregorian Date: 30 Jan 2003 05:02:45.56 • X: -1.1621310681357966e+006 km Vx: -0.2462221518003097 km/sec • Y: 757799.1103539797500000 km Vy: -0.2561905904275567 km/sec • Z: 369320.0722157274700000 km Vz: -0.0457073285913774 km/sec • Final Detector State • Offset Position by b2 = 20000*(cos(10),sin(10), 0) • Identical Velocity MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  32. Sample Impulsive Re-Orientation (2 of 2) • Astrogator Simulation • First Maneuver Magnitude of 7.3 m/s • Second Maneuver Magnitude of 4.4 m/s • Total Maneuver Magnitude of 11.7 m/s • Free Space Approximations (Impulsive) • Two Equal Impulsive Maneuvers of 6 m/s • Total V of 12 m/s • Comparison of Astrogator vs. Free Space • Fairly Good Agreement for this Sample Case • Small Re-Orientation Times • Astrogator’s Unequal Maneuver Size  Need for Previously Discussed “Correction Factor” MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  33. Sample Lissajous Orbit Delta-V Budgets Notes: (1) Total does not include engineering penalties,ACS Penalties, finite burn losses, cant angle, contingencies. Low Thrust not Considered here. (2) No Corresponding Chart for Heliocentric Orbit Option MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  34. Direct vs. Phasing Loop Transfer(Lissajous Orbit Option) • Phasing Loops with Lunar Swingby • More Robust • Operationally Complex • 10 Launch Days per Month (MAP 3 & 5 loop option) • Reduced C3 Costs (Not really a factor here) • Direct Transfer • Higher Risk (Little Time to React to Unforeseen Contingencies) • Simpler Operationally • 22 Launch Days per Month Constellation-X Example. Courtesy Lauri Newman MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  35. Libration Point Trajectory Manifolds L4 Earth/Moon L3 L1 L2 Y L5 x ~1.5 x106 km view from the ecliptic north pole z ecliptic north pole MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  36. Selected Lissajous Orbit Option Issues • Define Lissajous Orbit Parameters • Phasing Loop vs. Direct Transfer • Define Maximum L2-Earth-Spacecraft Angle for Communication Purposes (MAP was 10.5 degrees) • Define how sensitive Spacecraft is to Shadow in Phasing Loops • Review Lessons Learned from Other Libration Point Missions such as MAP & Triana • Insure that Thrusters are sized large enough to produce Desired DeltaV in a Reasonable time (For Transfer Trajectory) MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  37. Large Lissajous / Direct Transfer projection onto ecliptic plane(ie, top view) projection onto xz plane (ie, side view) projection onto yz plane (ie, view from earth) MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  38. Small Lissajous / Direct Transfer projection onto ecliptic plane(ie, top view) projection onto xz plane (ie, side view) projection onto yz plane (ie, view from earth) MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  39. Small Lissajous / Lunar Gravity Assist • Y-Amp ~ 200k • Z-Amp ~ 300k projection onto ecliptic plane(ie, top view) projection onto xz plane (ie, side view) projection onto yz plane (ie, view from earth) MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  40. Triana (L1 Lissajous Orbit) DSN/USN Support Requirements(Example from Triana Peer Review) Note: Since USN had planned Dedicated Triana Support, Some of these Requirements may be Overkill. Data Courtesy Greg Marr. MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  41. MAP Lunar Shadows (L2 Lissajous Mission Orbit) • Sample Worst Cases • MAP is a small amplitude Lissajous • Moon Farther from L2 • 8 Hour Shadow with Maximum Depth of 4.5% • Moon Closer to L2 • 6 Hour Shadow with Maximum Depth of 13% Note: Data courtesy Mike Mesarch MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  42. Supplementary Material – Heliocentric Orbit MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  43. MAXIM-PF Range From Earth(Heliocentric Orbit Option) Reference: August 99 MAXIM IMDC Study MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  44. MAXIM-PF Trajectory in Solar Rotating Coordinates(Heliocentric Orbit Option) Reference: August 99 MAXIM IMDC Study MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  45. Heliocentric Orbit Option Phase 1 MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  46. Formation Initialization • One LV with a C3 of 0.4 km2/s2 • Needed to put the trajectories beyond Earth’s sphere of influence (SOI is ~106 km) Relatively Quickly • One SC is maneuvered to the shifted orbit 200 km away from the other’s origin MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  47. Heliocentric Orbit Description(Phase 1) • Desired Characteristics • Two S/C in formation, 200km apart • Maintain inertial orientation of SC-to-SC line for 1 week observation • One SC follows a circular, heliocentric orbit • Other SC follows a shifted, circular, heliocentric trajectory with orbit plane parallel to the plane of the first SC • Center of shifted trajectory lies on the Sun-target line 200km from Sun • Driving Requirements • Time allocated for reorienting the SC-to-SC line • SC-to-SC line remains inertially fixed during observation MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  48. Formation Keeping (1/2)(Heliocentric Orbit, Phase 1, 200 km Baseline) • Apply control accelerations continuously to maintain the inertial orientation of the SC-to-SC line • ~0.01 m/s per week • Only Solar Gravity modeled • Circular Earth Orbit about Sun • SRP Differential Acceleration not considered here (Very Important Term) • Maximum control accelerations are needed when the trajectories are coplanar (it’s counter-intuitive) • 0.8 x 10-8 to 1.6 x 10-8 m/s2 • 8 to 16 micro-newton thrust for a 1000 kg SC Control acceleration magnitude -vs- time since station-keeping starts MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  49. Formation Keeping (2/2)(Heliocentric Orbit, Phase 1, 200 km Baseline) • Control Acceleration Magnitude Depends on • Position of SC in its Orbit • Choice of Target • Control Acceleration Magnitude Varies (Approximately) Linearly with Baseline Assuming: • For Our Range of Baselines • Ecliptic Target with RA=DEC=0 • Only Solar Gravity modeled • Circular Orbit MAXIM-PF, May 13-17, 2002Goddard Space Flight Center

  50. Supplementary Material – General MAXIM-PF, May 13-17, 2002Goddard Space Flight Center