South Slough Bridge #91. 2008 APWA National Project of the Year Transportation Category, Projects Less Than $2 million. Remove Rail. Sawcutting concrete rail. Remove Fill. Excavate fill over arches. Place Light Weight Fill. Cellular concrete pumped onto arches. Place Slabs.
E N D
South Slough Bridge #91 2008 APWA National Project of the Year Transportation Category, Projects Less Than $2 million
Remove Rail Sawcutting concrete rail
Remove Fill Excavate fill over arches
Place Light Weight Fill Cellular concrete pumped onto arches.
Place Slabs Precast concrete slabs set by crane
Install Rails County Standard Bridge Rail
Paving Approaches Graded HMA paving
Bridge Complete Open to Traffic