1 / 10

Preparing and Submitting PS&E Packages What does ODOT need?

Preparing and Submitting PS&E Packages What does ODOT need?. Local Agency Project Delivery Conference May 2 & 3, 2006. Support Systems for Quality Projects. Research Policies & Procedures Training Technical Assistance Project Development Quality Program Design Performance Specifications

grady-yang
Download Presentation

Preparing and Submitting PS&E Packages What does ODOT need?

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Preparing and Submitting PS&E PackagesWhat does ODOT need? Local Agency Project Delivery Conference May 2 & 3, 2006

  2. Support Systems for Quality Projects • Research • Policies & Procedures • Training • Technical Assistance • Project Development Quality Program • Design Performance Specifications • Pre-Letting Review • Quality Control (QC) for Every Project • Quality Assurance “Audits” or Reviews • Quality Program Management

  3. Definitions • Design Performance Specifications • Common specifications for all design providers that set design expectations • Pre-Letting Review • Brief review of all projects for general completeness, major risk elements and readiness for advertisement for bids • Quality Control • Each Item Produced is Inspected (Quality Monitoring throughout Development of Project) • Quality Assurance • Only a Sampling of All Items Produced are Inspected (Quality Verification or Affirmation (Auditing)) • Quality Program Management • Ongoing evaluation to monitor, manage and improve provider performance and program performance

  4. Office of Pre-Letting Website www.oregon.gov/ODOT/HWY/OPL

  5. What are the PS&E deliverables? Deliverables are listed on our Project Completeness Memo www.oregon.gov/ODOT/HWY/SEOPL/docs/forms/PD-02_project_completeness_memo.doc

  6. Is there a “How-to Guide”? Yes, “A User’s Guide to PS&E Delivery” http://www.oregon.gov/ODOT/HWY/SEOPL/docs/manuals/a-users-guide-to-pse-delivery.pdf

  7. Looking for a form or manual? http://www.oregon.gov/ODOT/HWY/OPL/manuals_forms_etc.shtml

  8. Pre-Letting Reviews • Overview of projects going to bid • Complete Submittals due 24 days + ad length prior to bid let date • Checklists and PS&E guide are available on our website

  9. What does ODOT need? • Complete PS&E packages 24 days + bid length prior to bid let date

  10. Website Resources and Contact Info Websites:www.oregon.gov/odot/hwy/qa www.oregon.gov/odot/hwy/opl Questions? Dustin.j.haas@odot.state.or.us (503) 986-3751

More Related