WELCOME. HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation. Indian Power Grid – its Evolution. Phenomenal expansion since Independence Generation : 1349 MW 101,866 MW (in 1947) (in 2001) Grid :

greg
Download Presentation

WELCOME

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WELCOME HIS EXCELLENCY Mr. SAHBAN F. MAHJOOB Minister of Power GOVERNMENT OF IRAQ & The Delegation

  2. Indian Power Grid – its Evolution • Phenomenal expansion since Independence • Generation : 1349 MW 101,866 MW (in 1947) (in 2001) • Grid : Local grid – at the time of Independence. State Grids – emerged in 1960s. Regional Grids – in 1970s. Five Regional Grids – Northern, Western, Southern, Eastern & North-eastern National Grid – under progress.

  3. Back

  4. Indian Power Scenario – at a Glance Existing • Installed capacity - 101,866 MWCoal – 71% Hydro – 25% Nuclear & others – 4% • Peak demand Peak power - 78,000 MW Energy (average) - 1395 MU/day • Availability Peak power - 68,000 MW Energy (average) - 1288 MU/day • Shortage Peak power - 10,000 MW (12.8%) Energy - 107 MU/day (7.7%)

  5. Indian Power Scenario – at a Glance All figs. are in MW Region Peak Installed Peak Demand Capacity Surplus/Deficit Northern 21,000 27, 000 - 2,100 Western 25,000 30,800 - 4,500 Southern 20,400 24,800 - 2,600 Eastern 7,800 15,700 + 2,000 North-eastern 950 1,800 - 25 • Limited exchange of power between Regions ---Main Reasons: • Inadequate interconnectors, especially from Eastern Region • Lack of proper Commercial and administrative mechanisms

  6. Back

  7. Power Transfer Envisaged from ER and NER by 2012 Table

  8. NORTHERN REGIONAL POWER SYSTEMSalient features • Largest in geographical area amongst the five regions covering 30.7% of the area and 28% of the country’s population. • Maximum variation in weather conditions from severe cold to peak summer. • Large distances between generation centers and load centers and power is transmitted over long distances. • Availability of Hydro generation reduces drastically in winter months. • Largest number of constituents (8 states/UT’s, 3 Central Generating Companies, one Central Transmission Utility and Bhakra Beas Management Board).

  9. NORTHERN REGIONAL POWER SYSTEMSalient features • Establishment of the first super thermal power station (Singrauli STPS) and 400 kV transmission system in the country. • Establishment of the first High Voltage Direct Current (HVDC) long distance transmission system in the country (2x750 MW, + 500 kV Rihand-Dadri HVDC bipole). • First HVDC back-to-back interconnection with Western Region (2x250 MW back-to-back HVDC station at Vindhyachal). • First 400 kV Static Var Compensators (SVC’s) in the country (2x + 140 MVAR SVC at Kanpur). • Largest capacity of combined cycle gas power stations amongst the five regions (2480.47 MW) located along the 700 Kms. long Hazira-Bijaipur-Jagdishpur (HBJ) natural gas pipeline of GAIL.

  10. Grid Operation by POWERGRID • Earlier performed by personnel from Central Electricity Authority on the platform of REB • Transferred to POWERGRID in stages -SRLDC 1994 -ERLDC 1995 -WRLDC 1996 -NRLDC 1996 • Overall improvement in grid operation since takeover by POWERGRID

  11. Overall Improvements by POWERGRID • Better hydro-thermal mix through objective & rational Scheduling. • Better merit order operation enhancing the overall efficiency. • Effective use of transmission lines and enhanced utilisation of their capabilities, retaining stability margins. • Better commercial practices. • Improvement in grid parameters (e.g. voltage, frequency profiles). • Better utilization of Inter-regional links. • Infused the grid discipline. • Lower backing down of Power plants.

  12. Overall Improvements by POWERGRID • Optimum capacity utilisation • Better co-ordination among constituents. • Transparency in grid operation. • Documentation of Grid Code, Regional operating Procedures, Black Start Procedures etc. • Introduction of modern State-of-the-art technology in grid operation. • Better communication facilities • Introduction of modern SCADA & EMS scheme (ULDC)

  13. MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs

  14. UNIFIED LOAD DESPATCH & COMMUNICATION (ULDC) SCHEMES POWERGRID IS IMPLEMENTING ULDC SCHEMES IN ALL THE FIVE REGIONS WITH STATE OF THE ART SCADA ENERGY MANAGEMENT SYSTEM AND DEDICATED COMMUNICATION SYSTEM

  15. OBJECTIVES • REAL TIME MONITORING & CONTROL OF POWER SYSTEM OPERATION • REAL TIME ENERGY MANAGEMENT SYSTEM • * OPERATION SCHEDULING • * POWER SYSTEM ANALYSIS • * OPTIMUM LOAD GENERATION BALANCE • DYNAMIC PLANNING FOR RELIABLE SYSTEM OPERATION • REAL TIME EVALUATION OF IMPACT OF POSSIBLE CONTINGENCIES ON THE SYSTEM • PREVENTIVE ACTION TO ENSURE SYSTEM STABILITY

  16. QUICK RESTORATION OFGRID IN CASE OF DISTURBANCE • COORDINATED CONTROL OF MVAR & LOAD FLOW TO MAINTAIN OPTIMUM VOLTAGE & FREQ. PROFILES • OPERATION OF SYSTEM AT IT’S FULL CAPACITY THROUGH CONTINUOUS CONTINGENCY ANALYSIS • EFFICIENT, RELIABLE & SECURED OPERATION OF GRID WITH ALL SYSTEM PARAMETERS & NETWORK CONDITIONS UPDATED EVERY 4 TO 15 SEC • REAL TIME ENVIRONMENT FOR TRAINING DESPATCHERS TO COPE WITH CONTINGENCIES

  17. H Himachal Pradesh Uttar Pradesh Madhya Pradesh SYSTEM CO-ORDINATION & CONTROL PROJECT (NORTHERN REGION) • J&K SEB • 1 SLDC • 1 Sub-LDC • 13 RTUs • HPSEB • 1 SLDC • 2 Sub-LDC • 16 RTUs Jammu & Kashmir China Bemina Pakistan F • PSEB • 1 SLDC • 2 Sub-LDC • 19 RTUs • BBMB • 1 SLDC • 4 Sub-LDC • 21 RTUs Gladni Jallandhar (B) Hamirpur Ganguwal (B) Jallandhar (P) Jutog F Kunihar F F H F F Punjab H H Chandigarh,BBMB Laltonkalan F ana Rishikesh F Patiala Panipat (BBMB) F H Narwana • DVB • 1 SLDC • 4 Sub-LDC • 31 RTUs F Panipat(HSEB) • HVPNL • 1 SLDC • 2 Sub-LDC • 40 RTUs Hary F J Moradabad DESU F Dadri (B) F H F N e pa l F F Delhi F Dadri (H) F Ratangarh Rajasthan Panki H H F Lucknow F Heerapura • UPPCL • 1 SLDC • 5 Sub-LDC • 82 RTUs F Sultanpur • RVPN • 1 SLDC • 3 Sub-LDC • 21 RTUs F Kota F Bhilwara F Varanasi Gujarat • RLDC • NEW DELHI • 38 RTUs • CPCC • KANPUR • 4 RTUs SLDC Sub - LDC H F

  18. Control System Hierarchy For Northern Region RSCC Delhi RTUs - 36 SLDC UPSEB SLDC HVPNL SLDCPSEB SLDC RVPNL SLDCJ&K SLDCBBMB SLDC HPSEB SLDCDVB CPCCKanpur Sub-LDC (RTUs) Sub-LDC (RTUs) Sub-LDC (RTUs) Sub-LDC (RTUs) Sub-LDC (RTUs) Sub-LDC (RTUs) Sub-LDC (RTUs) Sub-LDC (RTUs) RTUs - 6 Moradabad (17) Panipat (12) Patiala (12) Heerapura ( 12) Gladini (8) Dadri (5) Hamirpur (8) Bawana (5) Bhilwara (29) Panki (13) Narwana (15) Jalandhar II (20) Bemina (8) Ganguwal (6) Kunihar (8) Bamanauli (12) Kota (11) Rishikesh (27) Dadri (14) Lalton Kalan (8) Jalandhar I (4) Gazipur (8) Ratangarh (12) Sultanpur (8) Panipat (5) Gopalpur (5) (RTU-L) Panipat Varanasi (16) (RTU-L) Chandigarh (RTU-L) Minto Road (RTU-L) Lucknow

  19. Unique Features of Northern Region ULDC Scheme • Three Level Hierarchical Control centres • More than ten electrical utilities involved • Highly Complex system First Time attempted in the world as a Single Project • Dedicated communication Infrastructure • Live Line Fibre Optic Cable Stringing • More than 30 control centres and 400 RTUs • Advance Despatcher training Simulator

  20. SLDC SLDC SLDC SUB LDC SUB LDC SUB LDC RTU RTU RTU TYPICAL HIERARCHICAL REGIONAL CONTROL CENTRE SETUP REGIONAL LOAD DESPATCH CENTRE ERLDC WRLDC NRLDC SRLDC NERLDC STATE LOAD DESPATCH CENTRE AREA LOAD DESPATCH CENTRE REMOTE TERMINAL UNIT (AT SUB-STATIONS & GENERATING STNS)

  21. IMPLEMENTATION STATUS OF REGIONAL ULDC SCHEMES IN VARIOUS REGIONS

  22. POWERGRID’s Strategic PlanforDiversification into Telecom Business

  23. CONVERGENCE • Convergence - merging and overlapping of traditionally unrelated industries to provide essential services • provides opportunity to add value to the business • Power Transmission utilities can provide alternative broadband network at incremental cost • Valuable Right-of-Way readily available • Optimal utilisation of infrastructure • Sturdy and stable infrastructure • Less prone to vandalism and rodent menace • Proven technology

  24. FIBRE OPTIC CABLE INSTALLATION OPGW WRAP AROUND ADSS

  25. AERIAL OPTICAL FIBRE CABLES ALUMINIUM TUBE LOOSE TUBE ACSR STRANDS FIBRE FIBRE STRENGTH MEMBERS OPGW ADSS WRAP AROUND

  26. LDCA TAX LDCA TAX FIBRE PAIRS TO BEUSED BY POWERGRID DARK FIBRE PAIRS Single pair of fibres SDH / DWDM Capacity Eq. voice channels Transport Module STM - 1 155 Mbps 1920 STM - 4 622 Mbps 7500 STM - 16 2.5 Gbps 30000 STM - 64 10.0 Gbps 120000 DWDM N * 2.5 N*2.5 Gbps N*30000 N *10 N*10 Gbps N*120000 For example 32*2.5 80 Gbps 960000 32*10 320 Gbps 3840000

  27. WORLDWIDE DIVERSIFICATION IN TELECOM • World wide utilities like electric, gas, railways, water and roads have successfully diversified into telecom business • Electric - 63% , Gas - 18%, Railways - 12%, Water - 7% and Roads - 2% • Majority of these utilities are Transmission Utilities • Out of about major 50 utilities, 30 are Transmission Utilities in UK, Germany, Italy, Spain, Japan , USA etc. • New entrants have been successful in penetrating long distance market

  28. BUSINESS RISK / REWARD ASSESSMENT Business Reward Optimal point Business Risk Do Nothing Lease Wayleave Lease Dark Fibre Selective Commercial Service Full Network Service

  29. Phased Scheme of Implementation POWERGRID plans to enter Telecom business in a phased manner • Phase-I (Selective Commercial Services) • Utilise the spare/ excess capacity already available under modernisation of load despatch and communication facilities • Enter Telecom business as IP-II & introduce value added services • Internet Data Centers and Managed Network Services to be introduced in 1-2 year time • International Connectivity • Phase-II (NLDO Participation) • To enter into NLDO segment with a strategic partner by forming a Joint Venture Company

  30. Telecom Road Map • POWERGRID Builds and operates Capacity Business and Value Added Services on a focused network ( ~14,000 Km) • Delhi - Mumbai progressively by Mid, 2002 • Hyderabad – Bangalore – Chennai by October 2002 • Delhi – Hyderabad by October 2002 • Hyderabad – Calcutta by December 2002 • Delhi – Calcutta by December 2002 • Network to be completed by December 2003 Telecom Network – Map (Audio Visual)

  31. Technology • State-of-the-art Technology adopted • Transmission Equipment • Synchronous Digital Hierarchy (SDH) and Dense Wave Division Multiplexing (DWDM) • Optical Ground Wire (OPGW) • Mostly Live line installation without disturbing the power system • Capable of carrying SDH & DWDM • Network Management System (NMS) • Network to have a dedicated NMS for monitoring & maintenance of the telecom network from central location • Four remote independent Regional NMS • Future Proof

  32. FibreTo Be Installed POWERGRID Transmission Lines UNDERGROUND FIBRE CABLE Udhampur * Kishenpur * Existing/Under Construction Fibre Glandi Jallandhar (Jammu) Hamirpur II POWERGRID ULDC Project * Kunihar Gagal * Jutogh (Shimla) * * Moga POWERGRID Transmission Line Project * Panchkula * * Chandigarh Ludhiana Dhulekot * (Ambala) Access Link. Panipat * NEWDELHI Muradnagar Badarpur * * * Moradabad Balipara * Tezpur Kahelipara Ballabhgarh * * Dadri Bongaigaon Agra Lucknow * * Misa * * Patna Sasaram Guwahati * * Kopili * * Khandong Jaipur Umium I * Nehu Varanasi * Kanpur * * Khleihriat Malda Umium III * * Shillong * Biharsariff Dimapur Allahabad Badarpur * * * * Bhopal Farakka * * Kohima Khalgoan Kumarohat * * Singrauli Agartala GPP (Ahmedabad) * Durgapur * Imphal Dehgam * Agartala Vindhyachal * * Jabalpur * Itarsi Asoj Jeerat * * Indore Jam’pur * * Korba * * CALCUTTA Vadodara * Rourkela * Gandhar * * Baruch Raipur Koradi * * * Bhilai Kawas (Nagpur) Talcher * * Dhule * Rengali (Surat) * * Bhubaneswar Nasik * Chandrapur * Padghe * Indravati MUMBAI Ramagundam * Lonikhand * Jeypore * (Pune) Khamam * * Gazuwaka HYDERABAD (Vishakapatnam) * Vijayawada N’Sagar * * Nellore * Gooty BANGALORE CHENNAI Mysore * Salem * * Neyveli Kozikode * Coimbatore * * * Trichy Trichur * Udumalpet * Kalamassery * Madurai (Eranakulum) Trivandrum

  33. SERVICES End-to-End Bandwidth POWERGRID Telecom SERVICES • Internet Data Centre (IDC) • Web Hosting • Co-location services • Dedicated Server Products • Application Service Provision Virtual Private Networks (VPN) International Connectivity • NLD • Services

  34. NEW MILLENNIUM INFOCOM NETWORK MUMBAI DELHI NATIONAL LONG DISTANCE NETWORK (POWERGRID) Town 2 Town 3 KOLKATTA Town 1 EHV NETWORK State Network City1 City 2 Town 4 City 3 DISTRIBUTION NETWORK Access Network Within City/Town using LT distribution Network LT DISTRIBUTION NETWORK HOMES EDUCATIONAL INSTITUTES HOSPITALS PCO FACTORY GOVT. OFFICES MARKETS BANK DEPARTMENTAL STORES

  35. POWERGRID Strength is from Concept to Commissioning • Trained Manpower • > 70 Engineers for Planning, Design and Engineering • > 150 Engineers in field Implementation • Telecom, SCADA, DMS, EMS Consultancy for • - BSES • - NDMC • - PONDICHERRY • - DVB • Acknowledging strength of POWERGRID M/S KEMA (Consultants of International Repute) Signed MOU for providing consultancy in International Market

  36. SCADA/EMS/DMS Consultancy System Design & Engineering Feasibility Studies SCADA/EMS Consultancy Turnkey Execution Project Implementation • Ready to extend Consultancy in other countries • MOU With KEMA

  37. Financial Management Design of Network Feasibility Studies Project Implementation Regulatory and Market Assessment O & M Business Option Evaluation Turnkey Execution Telecom Business Consultancy Telecom Business Consultancy • Ready to extend arm in other countries • Joint Ventures • Equity stakes

  38. Thank You