1 / 15

CE 515 Railroad Engineering

CE 515 Railroad Engineering. Operations of Railways. “Transportation exists to conquer space and time -”. Safety. FRA responsible for safety Safety never deregulated All accidents reported Safety and Loss Control Department. Tracks.

Download Presentation

CE 515 Railroad Engineering

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CE 515 Railroad Engineering Operations of Railways “Transportation exists to conquer space and time -”

  2. Safety • FRA responsible for safety • Safety never deregulated • All accidents reported • Safety and Loss Control Department

  3. Tracks • Main tracks: governed by one or more methods of control. Should not be occupied without permission or authority • Other than main tracks: occupancy without authority, the locomotive engineer should look for other movements, usually max 20mph

  4. Speed • Higher speed: improve capacity and productivity but also risk and maintenance cost • Separate speed according to the type of train • Temporary Speed Restrictions (TSR) and Permanent Speed Restrictions (PSR)

  5. Rail Traffic Control Systems • Track Warrant Control (TWC) • Direct Traffic Control (DTC) • Automatic Block Signal (ABS) • Centralized Traffic Control (CTC)

  6. Rail Traffic Control Systems • TWC, DTC: Non-signalized systems • Use radio communication and computers • Rail Traffic Controller (RTC): order transferred by radio and written by crew

  7. Automatic Block Signal (ABS) • Series of consecutive blocks governed by block signals, cab signals, or both. Signals activated by a train moving through the block, or by certain conditions that affect the block use. • Developed in 1872, Dr. William Robinson • Divide “tracks” into blocks, only one train per block • Directional operations, two or more tracks • Designated current of traffic, low-density single tracks

  8. Automatic Block Signal (ABS) • Track circuit • Fail-safe design • Length of block: equal to longest normal stopping distance • “Two-block, three-indication”, “Three-block, four-indication” • Remained ABS systems: operated by TWC rules

  9. Automatic Block Signal (ABS) http://www.youtube.com/watch?v=U8yGNKH2t3g

  10. Centralized Traffic Control (CTC) • Track territories, double track sections: crossing over is allowed. • Rail Traffic Control Center: all track circuits connected, controlled together • Panel: showing position of each train

  11. Centralized Traffic Control (CTC) http://mysite.du.edu/~jcalvert/railway/ctc.htm

  12. Centralized Traffic Control (CTC)

  13. Centralized Traffic Control (CTC) • Authority to enter a CTC main track: by signal. • Crew requests for permission by radio • Opposing movements: not allowed, only following train movements • “Intermediate signals”: facilitate fleeting of trains

  14. Centralized Traffic Control (CTC) • Single track: 70% of capacity of double track with ABS • Railways: shift to CTC: excess capacity

  15. Questions?

More Related