CE 515 Railroad Engineering

CE 515 Railroad Engineering. Line-haul Operations Source: Armstrong Ch 13. “Transportation exists to conquer space and time -”. Line-Haul Operations.

roscoe
Download Presentation

CE 515 Railroad Engineering

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CE 515 Railroad Engineering Line-haul Operations Source: Armstrong Ch 13 “Transportation exists to conquer space and time -”

  2. Line-Haul Operations • “To safely and efficiently conduct its line-haul operations a railroad must coordinate many otherwise independent activities across a rail network.” – Armstrong Ch. 13, pg 221 • What does this mean?

  3. Line-Haul Operations • Communication • Operational practices • Safety • Coordination

  4. Line-Haul Operations • We’ve already done this, so what?

  5. Line-Haul Operations • We’ve already done this, so what? Let’s see just how everything fits together.

  6. Line-Haul Operations • We are going on a train trip, on our very own East-West Railroad from chapter 2. • Train: High-priority General Merchandise train H-CHINYC [What does this code mean?] • Where? Chicago to New York ABS New York East & West RAILROAD Co. Chicago Pick-up CTC TWC

  7. Line-Haul Operations • Train schedule in database is activated to initiate operation • The following happens: • “Crew Call System” identifies the crew to be called for duty • Locomotives are prepared by Dispatcher & Service Track Foreman. • Yardmaster and mechanical crews ready cars ABS New York East & West RAILROAD Co. Chicago Pick-up CTC TWC

  8. Line-Haul Operations • When ready, locomotives are connected to the “head end of the train.” • Air brake system is charged and brake test performed. • When ready and given the highball by Yardmaster and Dispatcher, train departs. ABS New York East & West RAILROAD Co. Chicago Pick-up CTC TWC

  9. Line-Haul Operations • On the Steel Highway! • When encounter “yard limits” along the way. • Main track controlled by track warrant or dispatcher authority • Is considered priority in yard limits, but must be prepared to stop within one-half of line of sight unless signal indicates otherwise ABS New York East & West RAILROAD Co. Chicago Pick-up CTC TWC

  10. Line-Haul Operations • Most likely encountering CTC communications • Dispatcher has setup schedule so that the “Meets” and “Overtakes” are consistent with our priority level to other trains. • Can have priority change, if we are early, late, or cause early/late actions to other trains. [Even problems with the exceeding of Federal hours of service rules.] ABS New York East & West RAILROAD Co. Chicago Pick-up CTC TWC

  11. Line-Haul Operations • As we are a general merchandise, might have to set out or pickup blocks of traffic requiring; • Head end crew movement on ground alongside of train • Additional brake tests, one for each time the train is broken up or added to • May result in delays or needed help from yard mechanical crew. ABS New York East & West RAILROAD Co. Chicago Pick-up CTC TWC

  12. Line-Haul Operations • Enter upon ABS control, where; • Must get dispatcher permission to enter the “current of traffic” • Once in, signal indication is first level of communication • IF moving on single train against signals, are moving “against the current of traffic”, a track warrant will dictate the movements and extra care must be exercised ABS New York East & West RAILROAD Co. Chicago Pick-up CTC TWC

  13. Line-Haul Operations • If we happen to travel onto un-signalized territory, unlikely, but… • Must operate in blocks on DTC or TWC • Must obtain instructions and permission to travel within each and every block or “authority” • Use of forms to document instructions • Anything done in given “authority” must be documented and viewed carefully! ABS New York East & West RAILROAD Co. Chicago Pick-up CTC TWC

  14. Line-Haul Operations • Beware! We might encounter a train defect. • If we encounter an automatic detection on hot bearings, dragging equipment, truck-curving performance, or wheel defects we must; • Result, delays and possible loss of priority! ABS New York East & West RAILROAD Co. Chicago Pick-up CTC TWC

  15. Line-Haul Operations • Defects might be communicated from new system • AEI – Automated Equipment Identification, which reads computer chips that store information on cars, trailers, containers, locomotives, etc. • Railroad computers take any AEI notice, cross references to find out what train the offending item is on to report the defect to the crew. ABS New York East & West RAILROAD Co. Chicago Pick-up CTC TWC

  16. Line-Haul Operations • We arrived! • Upon arrival, enter into destination yards to receiving yards • Crew or local hostlers will disconnect locomotives for servicing ABS New York East & West RAILROAD Co. Chicago Pick-up CTC TWC

  17. Line-Haul Operations • Paperwork • Crew files reports including • If ending at home terminal, drive on home, • Otherwise lodging food and rest until next assignment back home. ABS New York East & West RAILROAD Co. Chicago Pick-up CTC TWC

  18. Line-Haul Operations • Review • Train operations to build the train • Communication systems to traverse the route • Train operations for en route changes • Actions for any defects or issues • End all operations with documentation East & West RAILROAD Co.