Industrial Training Presentation

Industrial Training Presentation. Presentation Intro. Summary: I had my industrial training in VISL Bhadravathi,Karnatka . My work was focusing on finding energy saving opportunities in process. Presentation Topics: Details of my training Bhadravathi . Process Flow chart of Visl

grover
Download Presentation

Industrial Training Presentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Industrial Training Presentation

  2. Presentation Intro • Summary: • I had my industrial training in VISL Bhadravathi,Karnatka. My work was focusing on finding energy saving opportunities in process. • Presentation Topics: • Details of my training Bhadravathi. • Process Flow chart of Visl • Suggestion and Findings.

  3. Training History Work Sequence: First 10 Days Understanding the Steel making at VISL and finding energy saving opportunities. Next 7 Days Work had focused on developing strategies to save energy and workout technical feasibility of suggestions. Last 4 Days Writing the final report to submit to VISL.

  4. Work Contribution • Findings and Suggestions • .BOF Oxygen blowing end point determination. Due to manual determination of end of blow point of oxygen, lot of iron is getting wasted as slag. This reduces the yield factor of the BOF process and increases the amount of CO2 gas released into the atmosphere. If a dynamic model can be implemented on the basis of flue gas composition and temperature, productivity and the yield factor of BOF process can be significantly improved. • In Cooling Tower possibility 11.25 kW power generation with of 3 micro Hydel power plant .

  5. Work Contribution Micro Hydel power Plant from cooling Tower Height of tower(H)= 4m Discharge(Q) = 0.375m3/sec= 375l /s Efficiency( )= .75 The Tower has three outlet so we suggested three Micro Hydel power Plant.

  6. Basic oxygen Furnace(BOF)

  7. BOF Automation End Point Detection using Dynamic Method

  8. BOF Automation End Point Detection using Dynamic Method

  9. Conclusion • Industrial Training Objectives fulfilled. • Problems faced during training. • Project Fulfilment: • Importance of Project for VISL • Door still open for improvement. • . • Benefits from Training.

  10. Thank you for listening, Any Questions..? Thank you for listening, Any Questions..? Thank you for listening, Any Questions..?