An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. POWER Carbon-Aware Energy Capacity Planning for Datacenters Chuangang Ren, Di Wang, BhuvanUrgaonkar, AnandSivasubramaniam Computer Science and Engineering The Pennsylvania State University Aug. 9th, 2012

  2. Energy Consumption of Datacenters • Increase in number/size of datacenters due to heavy reliance on Internet services • Datacenters, if treated as a country, fifth in the world for electricity use • Datacenter electricity usage expected to double in next 5 years and requires 12 new power plants Environmental Cost Economic Cost

  3. Electricity Cost of Datacenters Electricity Cost for Datacenters (billion US $) Year Sources: Koomey 2011 and IDC 2009

  4. Monthly Costs of a 10MW Datacenter Other Utility Bill 8% Servers 24% Power Infrastructure 30.5% Chart: Source: Book by Barroso et al., Assumption: 20,000 servers, 1.5 PUE, 15$/W Cap-ex, Duke Energy Op-ex, 4yr server & 12 yr infrastructure amortization (Tier-2) 37.5% All cost are amortized at a monthly granularity 4

  5. Monthly Costs of a 10 MW Datacenter Peak power draw Other 8% Utility Bill 24% Power draw (W) Servers Energyconsumption (area under this curve) 30.5% Power Infrastructure Month 37.5% Chart: Source: Book by Barroso et al., Assumption: 20,000 servers, 1.5 PUE, 15$/W Cap-ex, Duke Energy Op-ex, 4yr server & 12 yr infrastructure amortization (Tier-2) All cost are amortized at a monthly granularity

  6. Environmental Cost of Datacenters CO2 Emission by Country in 2007 (megatons CO2 per year) Trend: Cap the carbon footprint of large electricity consumers (including datacenters) Regulations: • Emission Capping and Trading Schemes (e.g. cap-and trade) • Carbon Tax • Penalties if one fails to comply with the carbon regulations 340 178 146 142 80 Datacenter 2020 Datacenter 2007 Sources: Mckinsey on Business Technology 2008

  7. Ways to Reduce Datacenter CO2 Emissions • Power demand reduction • Numerous endeavors on energy-proportional computing technologies • Smart cooling system control

  8. Ways to Reduce Datacenter CO2 Emissions • Power demand reduction • Numerous endeavors on energy-proportional computing technologies • Smart cooling system control • Renewable energy penetration • Oklahoma Wind to Power Google Data Center • Facebook’s solar-powered datacenter

  9. Poor Renewable Usage by Datacenters Today Sources: Greenpeace International 2012

  10. Ways to Reduce Datacenter CO2 Emissions • Power demand reduction • Numerous endeavors on energy-proportional computing technologies • Smart cooling system control • Renewable energy penetration • Oklahoma Wind to Power Google Data Center • On-site solar based renewable generation at Google’s headquarter • Smarter electricity sourcing strategies

  11. Datacenter Power Sourcing Off-site Utility Energy Grid On-site Datacenter

  12. Datacenter Power Sourcing Off-site Utility Energy Grid On-site Diesel Generator Datacenter

  13. Datacenter Power Sourcing Off-site Utility Energy Grid On-site Diesel Generator Datacenter

  14. On-site Renewable Generation + Negligible transmission and distribution loss + Power peak shaving + Tolerate grid outage - Real-estate concerns may limit its efficacy - Not necessarily the best location with the right renewable energy potential (low kWh/sq) Off-site Utility Energy Grid On-site Diesel Generator On-site Renewable Datacenter

  15. Off-site Renewable Generation Off-site Renewable Off-site Utility Energy Grid On-site Banking Fee $ $ Wheeling Fee Diesel Generator On-site Renewable Datacenter

  16. Off-site Renewable Generation Off-site Renewable + Good renewable energy potential (higher kWh/sq) + Grid reduces intermittency of renewable energy • Transmission losses • Wheeling and banking charges Off-site Utility Energy Grid On-site Banking Fee $ Wheeling Fee $ Diesel Generator On-site Renewable Datacenter

  17. Renewable Energy Products Renewable Energy Products Off-site Renewable Off-site Utility Energy Grid On-site Diesel Generator On-site Renewable Datacenter

  18. Renewable Energy Products • Power Purchase Agreement (PPA): • A long-term contract to buy electricity output from a renewable energy provider, e.g., Google, Microsoft. • Giving renewable power project developers the access to financing they need to build new projects that contribute to new green power to the grid

  19. Renewable Energy Products Off-site Renewable Renewable Energy Products Carbon Offsetting Market Off-site Utility Energy Grid On-site Diesel Generator On-site Renewable Datacenter

  20. Renewable Energy Certificate (REC) • A REC is a certificate that represents 1 MWh of electricity generated from renewable energy • Two products: commodity electricity and REC • REC can be sold or traded separately from commodity electricity + REC

  21. Datacenter Power Sourcing Renewable Energy Products Carbon Offsetting Market Off-site • Expensive + Eliminate the need of capex and opex investment + Immunity to the renewable intermittency Utility Energy Off-site Renewable On-site Grid On-site Renewable Diesel Generator Datacenter

  22. Question Given all renewable energy options, how to achieve a target carbon footprint at minimal cost?

  23. Talk Outline Motivation 1 • Renewable Power Sources 2 • Framework for Provisioning 3 Evaluation 4 Conclusions 5

  24. Methodology Renewable Energy Products Carbon Offsetting Market Max. Demand () Off-site Utility Energy On-site Grid Powercap () Power (W) Time t=10min

  25. Peak Power Impact on Utility Bill 15-min Peak power draw 12 $/KW Average draw Power draw (W) Peak to Average ratio 3:1 5 c/KWh Energyconsumption (area under this curve) Month Duke Utility Tariffs (12 $/KW, 5 c/KWh) Note: Tariff rates collected from Duke Energy Utility.

  26. Methodology Renewable Energy Products Carbon Offsetting Market Max. Demand () Off-site Utility Energy On-site Grid Powercap () Power (W) Time t=10min

  27. Methodology Renewable Energy Products Carbon Offsetting Market Max. Demand () Off-site Utility Energy On-site Grid Powercap () Power (W) Time t=10min

  28. Methodology Renewable Energy Products Carbon Offsetting Market Max. Demand () Off-site Utility Energy On-site Grid Powercap () Power (W) Time t=10min

  29. Optimization Problem: Objective • Minimize: • UtilityBill + OnSiteCost + OffSiteCost + MarketCost + ESD Cost + DGOpEx

  30. Optimization Problem: Constraints Renewable Energy Products Carbon Offsetting Market Off-site Utility Energy On-site Grid Power sourcing:

  31. Optimization Problem: Constraints Off-site Off-site On-site On-site Max. Demand () Powercap () Power (W) Time On-site Constraints t=10min (1) Peak power cap:

  32. Optimization Problem: Constraints Off-site Off-site On-site On-site On-site Constraints (1) Peak power cap: (2) On-site renewable availability:

  33. Optimization Problem: Constraints Renewable Energy Products Carbon Offsetting Market Grid Off-site On-site Off-site renewable availability:

  34. Optimization Problem: Constraints Carbon Constraint 0% 50% 90%

  35. Talk Outline Motivation 1 • Renewable Power Sources 2 • Framework for Provisioning 3 Evaluation 4 Conclusions 5

  36. Realistic Power Profiles

  37. Realistic Power Profiles

  38. Renewable Trace Profiles On-site Off-site On/Off-site Source: NREL, Western Wind and Solar Integration Study

  39. Datacenter Configuration: Baseline Off-site Utility Energy Grid On-site Datacenter

  40. Datacenter Configuration: Base-DG Off-site Utility Energy Grid On-site Diesel Generator Datacenter

  41. Datacenter Configuration: Base-DG-ESD Off-site Utility Energy Grid On-site ESD Diesel Generator Datacenter

  42. Datacenter Configuration: All Renewable Energy Products Carbon Offsetting Market Off-site Utility Energy Off-site Renewable On-site Grid Diesel Generator On-site Renewable Datacenter

  43. Datacenter Cost Optimization Facebook Datacenter Power Cost (No Carbon Requirement) 3761 3700 3678 3669 • On-site renewables help reduce peak power drawn, hence lower cost • On-site renewables can supplement ESD and DG in their role in peak reduction at a lower cost Total Cost per Day ($)

  44. Impact of Carbon Target Facebook Datacenter Power Cost 3841 3700 3717 3682 3761 3669 Total Cost per Day ($) $ Carbon Reduction Goal (%) add baseline here

  45. Impact of Carbon Target (cont.) • On-site only: Base-DG-ESD + on-site renewable generation • Off-site only: Base-DG-ESD + off-site renewable generation • Market only: Base-DG-ESD + REC/PPA 3 1 2 Total Cost per Day ($) Carbon Reduction Goal (%)

  46. Impact of Carbon Target (cont.) • On-site only: Base-DG-ESD + on-site renewable generation • Off-site only: Base-DG-ESD + off-site renewable generation • Market only: Base-DG-ESD + REC/PPA • Hybrid solution as high carbon reduction increases • Renewable penetration goes beyond carbon offsetting, even lower cost 1 3 2

  47. Concluding Remarks • Framework for energy capacity planning to achieve carbon footprints target at minimal cost • Key findings: • Renewable penetration lower carbon footprints and costs • On-site renewables helpful for peak power reduction • Hybrid solution depending on carbon footprint targets

  48. Thank you! http://csl.cse.psu.edu/ Penn State University

  49. Backup Slides

  50. Electricity Cost of Datacenters Other Power and Cooling Cost for Datacenters (billion US $) Utility Bill 8% Servers 24% Power Infrastructure 30.5% Chart: Source: Book by Barroso et al., Assumption: 20,000 servers, 1.5 PUE, 15$/W Cap-ex, Duke Energy Op-ex, 4yr server & 12 yr infrastructure amortization (Tier-2) Year 37.5% Sources: Koomey 2011 and IDC 2009