1 / 4

TG1 Closing Report for September 2013

TG1 Closing Report for September 2013. Authors:. Date: 2013-09-18.

edith
Download Presentation

TG1 Closing Report for September 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TG1 Closing Report for September 2013 Authors: Date:2013-09-18 Notice:This document has been prepared to assist IEEE 802.19. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. StanislavFilin, NICT

  2. Results of the Week • Comments • 101 technical comments are resolved • 1 general comment is resolved • 28 editorial comments are resolved • Comment resolution status is in contribution 19-13-0057r15 StanislavFilin, NICT

  3. Schedule before November Meeting • TG1 technical editor will prepare draft before September 30, 2013 • TG1 would like to kindly ask the IEEE 802.19 WG Chair to start the next WG Letter Ballot recirculation before October 5, 2013 • Intended teleconference schedule • October 23, 1 AM EDT (2 PM Tokyo time) • October 30, 1 AM EDT (2 PM Tokyo time) • November 6, 0 AM EST (2 PM Tokyo time) StanislavFilin, NICT

  4. Intended Timeline • 2012 October: Second WG Letter Ballot • 2013 April: 1st Recirculation • 2013 August: 2nd Recirculation • 2013 October: 3rd Recirculation • November 2013: Sponsor Ballot • 2014 March: 1st Recirculation • 2014 July: Final WG and IEEE 802 EC Approval • 2014 September: RevCom/Standards Board Approval • 2014 October: Publication StanislavFilin, NICT