E N D
1. Unit Operations Center
PBL Case Study for IDGA
2. Agenda UOC System Synopsis
Strategic Vision = Phased Sustainment
Business Case Analysis
Industry Day
Statement of Objectives
Performance Based Agreement w/ Warfighters
Implementation Approximately 30 minutes with a program update.
An update of UOC operations in Iraq.
Then Q&A.
Approximately 30 minutes with a program update.
An update of UOC operations in Iraq.
Then Q&A.
3. WWI to OIF-I PBL BUT HERE IS SOME BACKGROUND INFO
NO COMMON OPERATING PICTURE
NO JOINT CAPABILITY EVERY UNIT COMMAND OPERATION CENTER HAD DIFFERENT PIECE PARTS AND FUNCTIONALITY
MANY DIFFERENT
CONFIGURATIONS OFFICE MAX, HOME DEPOT, STAPLES
C2 CAPABILITIES
C2 STANDARDS
SUSTAINMENT COSTS
PBL BUT HERE IS SOME BACKGROUND INFO
NO COMMON OPERATING PICTURE
NO JOINT CAPABILITY EVERY UNIT COMMAND OPERATION CENTER HAD DIFFERENT PIECE PARTS AND FUNCTIONALITY
MANY DIFFERENT
CONFIGURATIONS OFFICE MAX, HOME DEPOT, STAPLES
C2 CAPABILITIES
C2 STANDARDS
SUSTAINMENT COSTS
4. Commonality Capability Sets (CapSets) integrate common building blocks
Networked workstations; support standard Tactical Data Systems
>95% COTS
System architecture
Tailored capability
Responsive to task organizations from battalion to Force level. Building blocks for shaping the correct capability supporting a particular Marine Corps mission: * Operations Trailer * GET Trailer
* Supplemental Equipment
UOC TAILORED TO COMMANDERS MISSION AND TO UNIT TASK ORGANIZATION
A standard capability, Marine Corps-wide. All on the same technological level. Concurrent Planning
Near-Real-Time information exchange / situational awareness for the entire staff Jupiter server: simultaneous multiple information streaming
Emphasis on COTS equipment; LEVERAGE LATEST TECHNOLOGY
Common Operating Picture (COP)
Example: With UOC, the Watch Officer can communicate via intercom and focus the entire staff or selected staff members, and in a collaborative manner, direct the staff regarding how a particular target will be attacked.
Building blocks for shaping the correct capability supporting a particular Marine Corps mission: * Operations Trailer * GET Trailer
* Supplemental Equipment
UOC TAILORED TO COMMANDERS MISSION AND TO UNIT TASK ORGANIZATION
A standard capability, Marine Corps-wide. All on the same technological level. Concurrent Planning
Near-Real-Time information exchange / situational awareness for the entire staff Jupiter server: simultaneous multiple information streaming
Emphasis on COTS equipment; LEVERAGE LATEST TECHNOLOGY
Common Operating Picture (COP)
Example: With UOC, the Watch Officer can communicate via intercom and focus the entire staff or selected staff members, and in a collaborative manner, direct the staff regarding how a particular target will be attacked.
5. Rapid Deployment UOC is designed for maximum deployment flexibility using a T3 design: Tents, Trailers, Transit Cases This is a Infantry Battalion Level Capability Set
The CapSet III, for Regimental use, is comprised of more of these same basic components.
Many Transit Cases
Uniform design
Weatherproof
Man-portable
Transit Cases adapt to deployment on all AIRCRAFT, SHIPS, VEHICLES, ETC.
CapSet IV(M): Task Organized, Man-Portable CapSet Configuration.
This is a Infantry Battalion Level Capability Set
The CapSet III, for Regimental use, is comprised of more of these same basic components.
Many Transit Cases
Uniform design
Weatherproof
Man-portable
Transit Cases adapt to deployment on all AIRCRAFT, SHIPS, VEHICLES, ETC.
CapSet IV(M): Task Organized, Man-Portable CapSet Configuration.
6. Operational Trailer TAILGATE OPERATIONS.
The operational trailer is the key to the COC Common Module design. The design is based upon the M1102 trailer, towed primarily by the M1123 HMMWV
The trailer is modified to incorporate a rack structure for mounting the operational Transit Cased (TC) equipment. Additional operational TCs reside on the trailer bed with storage for tent furnishings, lights, etc. beneath the rack.
The Operational Trailer provides the necessary equipment and cabling for the COC.
Secure Network WAN, LAN, server
Non-Secure Network WAN, LAN, Server
RAID Servers
UPS
8 Operator Workstations, Intercom, Tables
OTM Capability
(Using Unit Provided EPLRS, VRC-92, PSC-5)
Public Address System
Transit Cased modules
Stay in the trailer to establish COC
Reducing the setup / tear-down time In operational configuration
Transit cases interconnected with cable harnesses permanently installed on rack.
All cable connections accessible from front of the equipment, where possible or from rear, where required, with sufficient cable service loops.
TAILGATE OPERATIONS.
The operational trailer is the key to the COC Common Module design. The design is based upon the M1102 trailer, towed primarily by the M1123 HMMWV
The trailer is modified to incorporate a rack structure for mounting the operational Transit Cased (TC) equipment. Additional operational TCs reside on the trailer bed with storage for tent furnishings, lights, etc. beneath the rack.
The Operational Trailer provides the necessary equipment and cabling for the COC.
Secure Network WAN, LAN, server
Non-Secure Network WAN, LAN, Server
RAID Servers
UPS
8 Operator Workstations, Intercom, Tables
OTM Capability
(Using Unit Provided EPLRS, VRC-92, PSC-5)
Public Address System
Transit Cased modules
Stay in the trailer to establish COC
Reducing the setup / tear-down time
7. Generator ECU & Tent Trailer (GETT) Generator, ECU,Tent, and Trailer (GETT) is a conglomerate of COTS items integrated by General Dynamics C4I
HMMWV towable
GET Trailer is a modified M1102 Chassis
Essentially the M1102 trailer fielded by the US Army
Marine Corps is a registered user.
20 kw generator
Southwest Products
404C-22T Perkins Diesel Engine
MECCALTE ECO 28 2L/4 Generator
* Weighs 1100lbs, half of the nearest USMC generator (MEP 805 30kW)
96000 BTU Environmental Control Unit
Applied
96000 BTU unit
REQUIREMENT FOR OPERATING AT TEMP EXTREMES OF 24F AND +131F
Generator, ECU,Tent, and Trailer (GETT) is a conglomerate of COTS items integrated by General Dynamics C4I
HMMWV towable
GET Trailer is a modified M1102 Chassis
Essentially the M1102 trailer fielded by the US Army
Marine Corps is a registered user.
20 kw generator
Southwest Products
404C-22T Perkins Diesel Engine
MECCALTE ECO 28 2L/4 Generator
* Weighs 1100lbs, half of the nearest USMC generator (MEP 805 30kW)
96000 BTU Environmental Control Unit
Applied
96000 BTU unit
REQUIREMENT FOR OPERATING AT TEMP EXTREMES OF 24F AND +131F
8. UOC in Iraq Urgent Universal Need Statements THERE ARE NINE SYSTEMS IN IRAQ for the last 14 months
AAO OF 355 , ACAT 3, awarded APR 2003 TO GENERAL DYNAMICS C4I THE INTEGRATOR
MS C LRIP, OT THIS SEPT
A standard expeditionary capability, Marine Corps-wide.
ALL POSITIVE!!! SELL
All on the same technological level. Concurrent Planning Near-Real-Time information exchange / situational awareness for the entire staff
simultaneous multiple information streaming
Emphasis on COTS equipment; LEVERAGE LATEST TECHNOLOGY
Example: With UOC, the Watch Officer can communicate via intercom and focus the entire staff or selected staff members, and in a collaborative manner, direct the staff regarding how a particular target will be attacked.
Urgent Universal Need Statements THERE ARE NINE SYSTEMS IN IRAQ for the last 14 months
AAO OF 355 , ACAT 3, awarded APR 2003 TO GENERAL DYNAMICS C4I THE INTEGRATOR
MS C LRIP, OT THIS SEPT
A standard expeditionary capability, Marine Corps-wide.
ALL POSITIVE!!! SELL
All on the same technological level. Concurrent Planning Near-Real-Time information exchange / situational awareness for the entire staff
simultaneous multiple information streaming
Emphasis on COTS equipment; LEVERAGE LATEST TECHNOLOGY
Example: With UOC, the Watch Officer can communicate via intercom and focus the entire staff or selected staff members, and in a collaborative manner, direct the staff regarding how a particular target will be attacked.
9. UOC Common Operating PictureThe Bottom Line SITAUATIONAL AWARENESS
Performance Based acquisition programSITAUATIONAL AWARENESS
Performance Based acquisition program
10. PBL: Mission Impossible?
POSITIVE NO NEGATIVES
AS A PERFORMANCE BASED ACQUISITION WITH REGARD TO PERFORMANCE SPECS IN TESTING, NOT A SUSTAINEED LEVEL OF PERFORMANCE.
SO THE PRIME CONTRACTOR HAS A LOT OF LATTITUDE IN THE DESIGN TO MEET THE REQUIREMETNS
PM MANAGES FUNCTIONAL CONFIGURATION BASELINE AND THAT IS ALL
PM DOESNT DO CM IN THE TRADITIONAL SENSE, THAT IS AN OEM RESPONSIBILITY
PM DOES NOT DICTATE INCLUSION OF SPECIFIC COMPONENTS (PM IS DIRECTING USE OF MCHS FOR COST-CONTROL)
PM DOES NOT CONTROL TECHNICAL DRAWINGS
THE SYSTEM USES SOME RUGGEDIZED COTS COMPONETS
PERFORMANCE BASED ACQUISITION BUT NO PERRFOANCE BASED LOGISTICS SUSTAINMENT IN THE BASIC CONTRACT.
IT IS TRADITIONAL CLS WITH A SMALL IRON MOUNTAIN BEHIND IT
.
THOUGH WE ARE AN ACAT 3 PROGRAM WE ARE DOING A BCA TOGET AN OBJECTIVE RECOMMNEDATION ON SUSTAINMENT STATEGIES. POSITIVE NO NEGATIVES
AS A PERFORMANCE BASED ACQUISITION WITH REGARD TO PERFORMANCE SPECS IN TESTING, NOT A SUSTAINEED LEVEL OF PERFORMANCE.
SO THE PRIME CONTRACTOR HAS A LOT OF LATTITUDE IN THE DESIGN TO MEET THE REQUIREMETNS
PM MANAGES FUNCTIONAL CONFIGURATION BASELINE AND THAT IS ALL
PM DOESNT DO CM IN THE TRADITIONAL SENSE, THAT IS AN OEM RESPONSIBILITY
PM DOES NOT DICTATE INCLUSION OF SPECIFIC COMPONENTS (PM IS DIRECTING USE OF MCHS FOR COST-CONTROL)
PM DOES NOT CONTROL TECHNICAL DRAWINGS
THE SYSTEM USES SOME RUGGEDIZED COTS COMPONETS
PERFORMANCE BASED ACQUISITION BUT NO PERRFOANCE BASED LOGISTICS SUSTAINMENT IN THE BASIC CONTRACT.
IT IS TRADITIONAL CLS WITH A SMALL IRON MOUNTAIN BEHIND IT
.
THOUGH WE ARE AN ACAT 3 PROGRAM WE ARE DOING A BCA TOGET AN OBJECTIVE RECOMMNEDATION ON SUSTAINMENT STATEGIES.
11. UOC PBL BCA
Validate expectations
Metrics
Objectivity
Orients Program Office, Commercial & DoD Industry
Market Research and Analysis
Periodic updates
Best value WHAT DID WE GET OUT OF OUR BCA TO DATE?
ITERATIVE PROCESS, KEEPS PROGRAM ON TRACK AND OR VALIDATES
BEST VALUE ASSESSMENT BASED ON COST, PERFORMANCE, PRODUCIBILITY, RELIABILITY, MAINTAINABILITY, & SUPPORTABILITY DECISIONS
WE WANTED TO HAVE FEEDBACK DURING PROGRAM EXECUTION THAT OUR PLANNED BENEFITS WILL BE ACHIEVED AT THE PROGRAMS COMPLETION
BCA INDEPENDENCE HAS TO STAND UP TO CRITICAL REVIEW CANNOT BE TAINTED MUST BE ABLE TO BE REFRESHED PERIODICALLY
IT ORIENTED THE REST OF THE TEAM on sustainment !!!!
A STEP IN OUR BCA WAS TO HAVE AN INDUSTRY DAY.TO ORIEIINTINDUSTRY.
WHAT DID WE GET OUT OF OUR BCA TO DATE?
ITERATIVE PROCESS, KEEPS PROGRAM ON TRACK AND OR VALIDATES
BEST VALUE ASSESSMENT BASED ON COST, PERFORMANCE, PRODUCIBILITY, RELIABILITY, MAINTAINABILITY, & SUPPORTABILITY DECISIONS
WE WANTED TO HAVE FEEDBACK DURING PROGRAM EXECUTION THAT OUR PLANNED BENEFITS WILL BE ACHIEVED AT THE PROGRAMS COMPLETION
BCA INDEPENDENCE HAS TO STAND UP TO CRITICAL REVIEW CANNOT BE TAINTED MUST BE ABLE TO BE REFRESHED PERIODICALLY
IT ORIENTED THE REST OF THE TEAM on sustainment !!!!
A STEP IN OUR BCA WAS TO HAVE AN INDUSTRY DAY.TO ORIEIINTINDUSTRY.
12. UOC Industry Day Published in Fed BizOpps
Website: Search UOC PBL
Draft Statement Of Objectives
Industry and Government responsiveness
Approximately 65% follow-up STAY POSITIVE !! NO NEGATIVE!! SELL
THE BCA ORIENT THE PO WHERE WE ARE IN REGARDS FOR STRIVING TO A PBL ENVIRONMENT
WE WANTED TO GET THE WORD OUT AND ORIENT INDUSTRY AS TO WHAT UOC IS DOING, AND LOOKING FOR
THE SOO IS A DRAFT. A DRAFT I TELL YOU! DID I MENTION THAT IT WAS A DRAFT! AND WE WELCOME INDUSTRY TO TELL US WHAT OBJECTIVES OF THEIR OWN THAT THEY CAN MEET.
ABOUT 70 PEOPLE ATTENDED, REPRESENTING ABOUT 20 COMPANIES AND FIVE GOVT AGENCIES
FOLLOW UP BY COMPANIES INTERESTED IN SUSTAINING UOC. SO THE BCA PAVES THE OBJECTIVE ROAD AHEAD.
STAY POSITIVE !! NO NEGATIVE!! SELL
THE BCA ORIENT THE PO WHERE WE ARE IN REGARDS FOR STRIVING TO A PBL ENVIRONMENT
WE WANTED TO GET THE WORD OUT AND ORIENT INDUSTRY AS TO WHAT UOC IS DOING, AND LOOKING FOR
THE SOO IS A DRAFT. A DRAFT I TELL YOU! DID I MENTION THAT IT WAS A DRAFT! AND WE WELCOME INDUSTRY TO TELL US WHAT OBJECTIVES OF THEIR OWN THAT THEY CAN MEET.
ABOUT 70 PEOPLE ATTENDED, REPRESENTING ABOUT 20 COMPANIES AND FIVE GOVT AGENCIES
FOLLOW UP BY COMPANIES INTERESTED IN SUSTAINING UOC. SO THE BCA PAVES THE OBJECTIVE ROAD AHEAD.
13. Mission Accomplishment Determine the best value option
the recommended path
Logistics: Phased Performance Increases
Phase I: Hybrid CLS (HCLS)
Phase II: Hybrid or Component PBL (HPBL)
Phase III: Full PBL W/PSI
Phase IV: Full PBL w/ PSSI for Refresh, SLEPs and Reprocurements
Confirmed through BCA updates THE BCA WILL HELP CLARRIFY WHAT THE BEST OPTION IS
PHASE I: NOW WE ARE USING CLS BECAUSE IT IS EFFECTIVE FOR WHAT WERE INVOLVED IN TODAY, IN IRAQ.
* 9 SYSTEMS IN IRAQ
* AN IMMEDIATE NEED FOR SYSTEM SUSTAINMENT THAT EXCEEDED ORGANIC MARINE Corps SKILLS AT THE TIME
PHASE II: FY06 WE ARE NOT SURE OF THE NEXT STEP, TO BEGIN WALKING. THE BCA WILL HELP WITH THIS DECISION.
PHASE III: FY07 or earlier WE WANT A LEAN, SMART, PROGRESSIVE, CONFIDENT PBL ENVIRONMENT.
PHASE IV FY 08
THE BCA WILL HELP CLARRIFY WHAT THE BEST OPTION IS
PHASE I: NOW WE ARE USING CLS BECAUSE IT IS EFFECTIVE FOR WHAT WERE INVOLVED IN TODAY, IN IRAQ.
* 9 SYSTEMS IN IRAQ
* AN IMMEDIATE NEED FOR SYSTEM SUSTAINMENT THAT EXCEEDED ORGANIC MARINE Corps SKILLS AT THE TIME
PHASE II: FY06 WE ARE NOT SURE OF THE NEXT STEP, TO BEGIN WALKING. THE BCA WILL HELP WITH THIS DECISION.
PHASE III: FY07 or earlier WE WANT A LEAN, SMART, PROGRESSIVE, CONFIDENT PBL ENVIRONMENT.
PHASE IV FY 08
14. NOW we are doing Hybrid Contractor Logistics Support (HCLS)
Who are the current team members, though this slides only list five organizations, as the ILSO I feel like have more like six subs
The are GD C4I AS THE INERGRATOR, FIELD SERVICE AND OIF SUPPLY CHAIN ,
GD NETWORK SYSTEMS A DIFFERENT PROFIT CENTER FROM THE GD C4 DOING CONUS SUSTINMENT AND SUPLY CHAIN ALONG WITH SOME OIF DEPLOYED SUPPORT ,
USMC LGISTICS COMMAND,
SPAWAR,
MCCTSSA
Program Office Management
3PL is USMC Logistics Command and SPAWAR out of Charleston SC, PSP Field Techs is GDNS,
Contract funding manager for the Marine Corps out of Albany GA Logistics COMMNAD to CLS contract managed by Warner Robins AFB, executed by General Dynamics Network Systems
Teamed Field Engineer support in Iraq (9 systems) two different PSP in theater providing similar services.
The General Dynamics Network Systems has one performance metric of Turnaround Time but not incentive
SPAWAR Charleston coordination Transportation, SMEs
Working on metrics but no incentives.
NOW we are doing Hybrid Contractor Logistics Support (HCLS)
Who are the current team members, though this slides only list five organizations, as the ILSO I feel like have more like six subs
The are GD C4I AS THE INERGRATOR, FIELD SERVICE AND OIF SUPPLY CHAIN ,
GD NETWORK SYSTEMS A DIFFERENT PROFIT CENTER FROM THE GD C4 DOING CONUS SUSTINMENT AND SUPLY CHAIN ALONG WITH SOME OIF DEPLOYED SUPPORT ,
USMC LGISTICS COMMAND,
SPAWAR,
MCCTSSA
Program Office Management
3PL is USMC Logistics Command and SPAWAR out of Charleston SC, PSP Field Techs is GDNS,
Contract funding manager for the Marine Corps out of Albany GA Logistics COMMNAD to CLS contract managed by Warner Robins AFB, executed by General Dynamics Network Systems
Teamed Field Engineer support in Iraq (9 systems) two different PSP in theater providing similar services.
The General Dynamics Network Systems has one performance metric of Turnaround Time but not incentive
SPAWAR Charleston coordination Transportation, SMEs
Working on metrics but no incentives.
15. SPEAK OUT THE APPRVIAITIONS
FUNDING DEPENDANT, PBA WITH THE WARFIGHETER may only want partial or componet PBL
MAYBE THIS PHASED IS SKIPPED OR MAYBE WE WANT TO SOLIDIFY THE PLAN AND CONFIRM THE CAPABILITIES OF VARIOUS ENTITIES.
HYBRID PBL OR PBL BY COMPONENT. STILL MAYBE SOME CLS, SOME ORGANIC, SOME PBL CONTRACTS. THIS WILL GIVE THE PROGRAM OFFICE A BETTER UNDERSTANDING OF THE CHALLENGES AND ISSUES FOR A POTENTIAL PSI. OBSERVE STRENGTHS AND WEAKNESS OF EXISTING PSPS.
AVENUES FOR FUNDING O & M FROM THE WARFIGHTER OR NAVY WORKING CAPITAL
BY COMPONENT PBL CONTRACTS OR PARTIAL
SPEAK OUT THE APPRVIAITIONS
FUNDING DEPENDANT, PBA WITH THE WARFIGHETER may only want partial or componet PBL
MAYBE THIS PHASED IS SKIPPED OR MAYBE WE WANT TO SOLIDIFY THE PLAN AND CONFIRM THE CAPABILITIES OF VARIOUS ENTITIES.
HYBRID PBL OR PBL BY COMPONENT. STILL MAYBE SOME CLS, SOME ORGANIC, SOME PBL CONTRACTS. THIS WILL GIVE THE PROGRAM OFFICE A BETTER UNDERSTANDING OF THE CHALLENGES AND ISSUES FOR A POTENTIAL PSI. OBSERVE STRENGTHS AND WEAKNESS OF EXISTING PSPS.
AVENUES FOR FUNDING O & M FROM THE WARFIGHTER OR NAVY WORKING CAPITAL
BY COMPONENT PBL CONTRACTS OR PARTIAL
16. All components and services firing on all cylinders PBLAll components and services firing on all cylinders PBL
17. PSSI
Reprocurements
Tech refreshes
Service Life Extension Programs SLEPS
THE PROGRAM MANAGEMENT OFFICE WILL HAVE ENGAGED A PSI
THE PSI WILL BE IDENTIFIED AND UNDER A PERFORMANCE CONTRACT WITH PERFORMANCE METRICS
THE PRODUCT SUPPORT PROVIDER OR PROVIDERS MAY BE MANAGING ON SITE MAINTENANCE, SPARE PARTS SUPPLY, COTS IT END-OF-LIFE ISSUES, ETC.
THE PSI HAS THE EXPERIENCE AND EVOLVES TO A PRODUCT SYSTEM SUPPORT INTEGRATOR, A PSSI.
HAS GREATER ROLE IN THE PROGRAM
.A ROLE INVOLVING ACQUISITION BEYOND PROCURING COTS IT REPLACEMENTS
THIS IS NEW GROUND
IT IS REVOLUTIONARY AND TRANSFORMATIONAL
ITS AN IDEA
IT WILL TAKE TIME
.IT MAY NOT FINALLY BE ARTICULATED AS DEPICTED.
REMEMBER, NO PLAN SURVIVES FIRST CONTACT
PROCURING PERFORMACE
AND GET IT MANAGED EFFECTIVELY AND EFFICIENTLY
THROUGH AN EMPOWERED
PRODUCT SUPPORT INTEGRATOR
MANAGE CM
SOON, MANY DIFFERENT CONFIGURATIONS. EVENTUALLY, EVERY SINGLE UOC WILL HAVE A SLIGHTLY DIFFERENT CONFIGURATION.MANAGE CONTINUOUS MODERNIZATION. MANAGE DIMINISHED RESOURCES AND MANUFACTURING SOURCES
(OBSOLESCENCE)) (COMPANIES COME AND GO)
WE ARE THE PSI TODAY, BUT THAT HAS GOT TO CHANGE AND IT WILL
You feel my pain if you had an PSI you could manage more programs
..PSSI
Reprocurements
Tech refreshes
Service Life Extension Programs SLEPS
THE PROGRAM MANAGEMENT OFFICE WILL HAVE ENGAGED A PSI
THE PSI WILL BE IDENTIFIED AND UNDER A PERFORMANCE CONTRACT WITH PERFORMANCE METRICS
THE PRODUCT SUPPORT PROVIDER OR PROVIDERS MAY BE MANAGING ON SITE MAINTENANCE, SPARE PARTS SUPPLY, COTS IT END-OF-LIFE ISSUES, ETC.
THE PSI HAS THE EXPERIENCE AND EVOLVES TO A PRODUCT SYSTEM SUPPORT INTEGRATOR, A PSSI.
HAS GREATER ROLE IN THE PROGRAM
.A ROLE INVOLVING ACQUISITION BEYOND PROCURING COTS IT REPLACEMENTS
THIS IS NEW GROUND
IT IS REVOLUTIONARY AND TRANSFORMATIONAL
ITS AN IDEA
IT WILL TAKE TIME
.IT MAY NOT FINALLY BE ARTICULATED AS DEPICTED.
REMEMBER, NO PLAN SURVIVES FIRST CONTACT
PROCURING PERFORMACE
AND GET IT MANAGED EFFECTIVELY AND EFFICIENTLY
THROUGH AN EMPOWERED
PRODUCT SUPPORT INTEGRATOR
MANAGE CM
SOON, MANY DIFFERENT CONFIGURATIONS. EVENTUALLY, EVERY SINGLE UOC WILL HAVE A SLIGHTLY DIFFERENT CONFIGURATION.MANAGE CONTINUOUS MODERNIZATION. MANAGE DIMINISHED RESOURCES AND MANUFACTURING SOURCES
(OBSOLESCENCE)) (COMPANIES COME AND GO)
WE ARE THE PSI TODAY, BUT THAT HAS GOT TO CHANGE AND IT WILL
You feel my pain if you had an PSI you could manage more programs
..
18. This IS BIG INTO DETAILS
THESE ARE COMMON TO MANY OF US, WERE ALL IN THIS TOGETHER *********
METRICS
THESE COME FIRST
WHAT IS IT THAT YOU (WARFIGHTER) NEED AND WANT UOC TO DO?
MUST INCLUDE PROGRAM MANAGERS METRICS (I.E., PERFORMANCE, SUSTAINMENT, RELIABILITY)
PBA
ALL stake holders must be involved
WARFIGHTER INVOLVEMENT
OMMC funding returned to the PM has never been done in the USMC
If we always do what we did. You will always get what you always got!!!!! Status quo!!
PM UOC AS THE CENTRAL FUNDING SOURCE.
HAVE TO ENGAGE WARFIGHTERS REPRESENTATIVES FOR FISCAL SUPPORT
IDEAL WARFIGHTER DOESNT WORRY ABOUT HOW SUPPORT WILL BE FUNDED, PM DOES
HIGH LEVEL CULTURAL CHANGES TO DIRECT FUNDING FROM WARFIGHTER TO PM
OVERCOMING BUREACRATIC INERTIA IN GOVT AND INDUSTRY. THIS IS A GIGANTIC PARADIGN SHIFT FOR ALL OF US BUT IT GOT TO BE DONE FOR OUR SURVIVAL
This IS BIG INTO DETAILS
THESE ARE COMMON TO MANY OF US, WERE ALL IN THIS TOGETHER *********
METRICS
THESE COME FIRST
WHAT IS IT THAT YOU (WARFIGHTER) NEED AND WANT UOC TO DO?
MUST INCLUDE PROGRAM MANAGERS METRICS (I.E., PERFORMANCE, SUSTAINMENT, RELIABILITY)
PBA
ALL stake holders must be involved
WARFIGHTER INVOLVEMENT
OMMC funding returned to the PM has never been done in the USMC
If we always do what we did. You will always get what you always got!!!!! Status quo!!
PM UOC AS THE CENTRAL FUNDING SOURCE.
HAVE TO ENGAGE WARFIGHTERS REPRESENTATIVES FOR FISCAL SUPPORT
IDEAL WARFIGHTER DOESNT WORRY ABOUT HOW SUPPORT WILL BE FUNDED, PM DOES
HIGH LEVEL CULTURAL CHANGES TO DIRECT FUNDING FROM WARFIGHTER TO PM
OVERCOMING BUREACRATIC INERTIA IN GOVT AND INDUSTRY. THIS IS A GIGANTIC PARADIGN SHIFT FOR ALL OF US BUT IT GOT TO BE DONE FOR OUR SURVIVAL
19. UOC PBL Vision Conclusions
Map Logistics Performance back to
Requirements Document
Phased PBL
An evolution from CLS to PBL
THE COURSE WERE ON IS TO NOW WALK
Phase in PBLfor systems that are going into MS C
THE PBL ACCEPTANCE IS THERE, THE IMPLEMENTATION IS HARD TO DO
WE SEE THIS AS EVOLUTIONARY TO PBL
I WANT TO ACKNOWLEDGE THE SUPPORT OF GENERAL CATTO AND SENIOR MARINE CORPS SYSTEMS COMMAND LEADERSHIP FOR THEIR SUPPORT OF THE UOCS PIONEERING EFFORTS IN THE CORPS TO ADVANCE THE BENEFITS OF PBL.
THE COURSE WERE ON IS TO NOW WALK
Phase in PBLfor systems that are going into MS C
THE PBL ACCEPTANCE IS THERE, THE IMPLEMENTATION IS HARD TO DO
WE SEE THIS AS EVOLUTIONARY TO PBL
I WANT TO ACKNOWLEDGE THE SUPPORT OF GENERAL CATTO AND SENIOR MARINE CORPS SYSTEMS COMMAND LEADERSHIP FOR THEIR SUPPORT OF THE UOCS PIONEERING EFFORTS IN THE CORPS TO ADVANCE THE BENEFITS OF PBL.
20. UOC Points of Contact Mr. Kevin Holt, Program Manager, 703-432-4183
Mr. Mike Danhires, Logistics IPT Lead, 703-432-4150
Micheal.Danhires@usmc.mil
Capt Jason Hamilton, Logistician, 703-432-4180
Jason.A.Hamilton@usmc.mil
Mr. Jim Storey, Logistician, ASC/NGMS, 540-657-4511
Jim.Storey@ngc.com
21. KEEP YOUR EYES ON THE TARGET
PRODUCT SYSTEM SUPPORT INTEGRATOR, A PS2IKEEP YOUR EYES ON THE TARGET
PRODUCT SYSTEM SUPPORT INTEGRATOR, A PS2I
22. UOC PBL Vision Questions