1 / 20

SEKTOR TELUK SIRIH

SEKTOR TELUK SIRIH. PT PLN ( Persero ) PEMBANGKITAN SUMBAGSEL SEKTOR PEMBANGKITAN TELUK SIRIH. RAKOR TW IV 2013 “ Peningkatan Pengendalian Proses Bisnis Menuju World Class Company “. PT PLN ( Persero ) Pembangkitan Sumbagsel Sektor Pembangkitan Teluk Sirih. RINGKASAN PROYEK.

hang
Download Presentation

SEKTOR TELUK SIRIH

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SEKTOR TELUK SIRIH PT PLN (Persero) PEMBANGKITAN SUMBAGSEL SEKTOR PEMBANGKITAN TELUK SIRIH

  2. RAKOR TW IV 2013 “PeningkatanPengendalian Proses Bisnis Menuju World Class Company “ PT PLN (Persero) PembangkitanSumbagsel SektorPembangkitanTelukSirih

  3. RINGKASAN PROYEK

  4. ROAD MAP 2013 - 2017 2017 Word Class Standart Coal Power Plant in Indonesia 2016 Best Performance & Best Managing ‘China” Coal Power Plant • IMAP • OPI • Imp 5S • SMT • Zero Leakage • Plant Tour • Proper Hijau • Plant Health Improvement • Plant Performance Improvement Monitoring 2015 Best Performance “China” Coal Power Plant in Indonesia • IMAP • OPI • Imp 5S • SMT • Zero Leakage • Plant Tour • Proper Hijau • Plant Health Improvement • Plant Performance Improvement 2013 2014 Performance & Comissioning Best Performance “China” Coal Power Plant in Sumatera • IMAP • OPI • Imp5S • SMT • Zero Leakage • Plant Tour • Proper Hijau • Plant Health Assesment • Plant Performance Improvement • Set Up IMAP • Set Up OPI • Set Up 5S • Set Up SMT • Zero Leakage • Set Up Plant Tour • Proper Biru • Data Performance Peralatan • Training PeralatanPdM • PelaksanaanPdM • Set Up Plant Tour

  5. Road Maps Menuju World Class Services

  6. KinerjaTeknis (Technical System) Ket : Close Inprogress Open

  7. 112,6 MW 29,09 MW Unit 1 pada 15 Okt 2013 Unit 2 pada 30 Des 2013 Manajemen Stock Pile di Coal Shed Coal Yard (100.000 ton) & Coal Shed (30.000 ton)

  8. KegiatanMembantuPercepatanKomisioning Mengatasi Blocking Batubara di Coal Bunker padaOkt 2013 PenggantianExpantion Joint pada Nov 13 Pengisian Sand ke Boiler Meeting KonstruksiBersama PLN Proyek, CNTIC, & Konsultan

  9. Proses Bisnis (Process System) Ket : Close Inprogress Open

  10. Kegiatan Proses Bisnis SosialisasidenganPihakPenyediaTenagaKerja Pelaksanaan EMI Survey Set Up OPI STIR

  11. Mindset, Capability, & Leadership (People System) Ket : Close Inprogress Open

  12. Mindset, Capability, & Leadership (People System) LANJUTAN Ket : Close Inprogres/Rutin Open

  13. Mindset (Budaya Kerja) Mulai Kerja a. Berdoa Bersama sebelum Bekerja * b. Mendengarkan Lagu Mars PLN * c. COC setelah daily meeting pkl 09:00-09:30 d. Ucapan Penyemangat " Selamat Bekerja dan Raih yang Terbaik“ * Saat Istirahat a. Mendengarkan Annaouncement :" Waktu Memasuki Jam Istirahat, Selamat Beristirahat dan Mulailah Bekerja Tepat Waktu“ * b. Selama beristirahat diputar lagu-lagu instrument dengan volume lembut * c. Mendengarkan Annaouncement :" Waktu Istirahat akan berakhir, Selamat Bekerja dan Raihlah yang Terbaik“ * Saat Mengakhiri Pekerjaan a. Doa Bersama Sebelum Pulang * b. Dari Annaouncement :" Selamat Mengakhiri Pekerjaan Hari ini, dan Terima Kasih atas Karyanya Hari ini" (oleh Manajemen) dan diputar Lagu Hymne PLN * * Melalui Paging System

  14. Kegiatan Mindset Capabilities & Leadership Mini Family Gathering Sosialisasi & Penandatanganan “PLN Bersih No Suap” pada 15 Agust 13 JumatBersih RuangPenerimaanTamu

  15. Kegiatan Mindset Capabilities & Leadership Game untukmelatihKekompakan Weekly Meeting Pertandingan Tim Futsal STIR KM Assesment

  16. Sinergi PLN STIR dengan BAMUS & KAN Sinergi PLN STIR Lantamal II & Poltabes Sinergi PLN STIR – Duta Humas PLN Sinergi PLN STIR - GOWES

  17. e RENCANA RUMAH INAP OPERATOR DAN RENCANA RUMAH SINGGAH PEMELIHARAAN d UNIT 2 b a c PLANT TOUR CONCEPT

  18. TERIMA KASIH TERIMA KASIH

More Related