The LHC Beam Dumping System

The LHC Beam Dumping System. The LHC Beam Dumping System V.Kain, R. Suykerbuyk Input from: E. Carlier, B. Goddard. Contents: LHC Extraction in LSS6 – LHC Beam Dumping System (LBDS) Equipment, Interfaces, Software Testing – Reliability tests, Scenario tests Summary.

hani
Download Presentation

The LHC Beam Dumping System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The LHC Beam Dumping System The LHC Beam Dumping System V.Kain, R. Suykerbuyk Input from: E. Carlier, B. Goddard • Contents: • LHC Extraction in LSS6 – LHC Beam Dumping System (LBDS) • Equipment, Interfaces, Software • Testing – Reliability tests, Scenario tests • Summary 08Nov07

  2. LHC Extraction in LSS6 – LHB Beam Dump System (LBDS) • Fast extraction (kicker and septa) • Dilution • Beam dump • Protection Dump block Dilutionkickers Extraction septum Diluter block Extraction kickers 08Nov07

  3. LBDS Beam Instrumentation • Additional beam instrumentation, shown for one beam • BLMs missing…(32 per beam, 2 special ones on TCDQ) 08Nov07

  4. LBDS Interfaces FMCM Interfaces: triggering, synchronisation, energy tracking, arming, BIS, injection BIS 08Nov07

  5. LBDS Software No mention of the internal LBDS controls software (slow control software, fast acquisition, synchronisation unit, …). • “LBDS Monitoring GUI” ← does not exist yet, no person assigned (maybe Eric) • like WinCC • shows alarms • IPOC results • shows status of different sub-systems • shows status of BETS • can be used to re-arm LBDS • XPOC 08Nov07

  6. LBDS software – XPOC (1) • LSA software • External Post Operational Check after EACH beam dump • LBDS safety critical • analysis of last beam dump to verify that worked correctly • IPOC (beam dump hardware) + BI + … • even if postmortem event suppressed, XPOC carried out • XPOC analysis could cover enough even for “bad programmed dump” (no PM event) • ‘Operational state’ of beam dump depends on XPOC result • analysis specified not to take longer than 5 s • XPOC triggered on ‘beam dump’ event • XPOC on server. Data collection and analysis start automatically. • event generated by timing as soon as permit loop broken • during analysis beam permit removed via SIS • SDDS file structure in event trees • results are written to file in event tree • XPOC GUI: browser, model builder, view analysis results • XPOC references MCS settings • List: LHC-TD-ES-0001 08Nov07

  7. LBDS software – XPOC (2) 08Nov07

  8. LBDS software – XPOC (3) • XPOC Status • analysis packages so far only for • BTVDD traces • MKD waveforms • MKB waveforms • signals not written to event tree file structure yet • no GUI with browser yet • no references in LSA yet 08Nov07

  9. LBDS - Controls Requirements (1) • “No” LSA settings – LBDS core is hardcoded • But: • Q4 currents, discussion: critical settings • MSD currents, discussion: cirtical settings • TCDQ functions • Only command: ARM (before first injection) • Logging • to be defined • e.g. BETS logged with 1 Hz, during pulse higher frequency • Fixdisplays • to be defined • BTVDD, BLMs in extraction region, BPMSE update each dump …N2 pressure at TDE continuous update,… • MCS • XPOC references • BETS look-up tables: MKD/MKB strengths vs. energy, Q4/MSD current vs. energy, DCCTs vs. energy, … • Q4, MSD current? • Alarms • to be defined for operations. Alarms on FESA level defined → WINCC • OASIS • idea for the time being: 1+15 MKD kicker waveform, revolution frequency, circulating beam signal • Maybe not required: IPOC FESA class preapres everything digitally • TCDQ: collimator control 08Nov07

  10. LBDS - Controls Requirements (2) • Applications for BI: • BTVs: application of Fabio • BPMs: BPMD in a separate FESA class • BPMD probably only for XPOC • Interlocked BPMs? • Probably YASP, critical settings, like CNGS • (fast position interlock for later on) • BLMs: normal ones in dump line? • Special ones on TCDQ? • FBCTs: application of Markus 08Nov07

  11. LBDS - Controls Requirements- Sequencer • Has to arm the LBDS (+ BIS) • via LBDS FESA device • Has to manage the OPERATIONAL STATES of the LBDS. • depend on XPOC results, access in LSS6 • e.g. LBDS available for operation without beam/ pilot at 450 GeV • Provokes programmed dumps • depending on operational scenario: • unlink/link permit loops via BIC FESA class • prepare timing tables with events to: • dump beam • post mortem suppression/re-enable • For inject & dump, circulate & dump, injection intermediate, single beam MD • Set # turns on turn counter value at inject & dump LBDS hardware 08Nov07

  12. Other stuff • Access procedures? • Padlock dump caverns during run? • During shutdown needs to be accessed for maintenance of BTVDD electronics, radiation monitors, water pump • FMCM on MSD • Supervision application ready 08Nov07

  13. Testing… (1) • As LBDS is safety critical a RELIABILITY TEST is planned • Two phases: • ‘stand-alone’ reliability test • 10 weeks during hardware commissioning • ‘fully-connected’ reliability test • 450 GeV ‘fully-connected’: 2 weeks, during machine check-out • 7 TeV ‘fully-connected’: 4 weeks, during machine check-out • Documentation will be in MTF • A lot of open issues…parallelism? Availability of closed BIS loop,… • As soon as possible from CCC – running already in local • would need: • timing: XPOC triggering • sequencer – arming, timing 08Nov07

  14. Testing…(2) 08Nov07

  15. Reliability Testing (1) • ‘Stand-alone’ (10 weeks) – during hardware commissioning • NEEDS LOGGING CONFIGURED • NEEDS XPOC (to some extent) • (NEED IPOC) • Fake DCCT signals from MBs, Q4 and MSD to BEM/BETS from local FGCs • is there • No connection to access system • Fake RF signal from local FGC (for RF revolution frequency signal) • is there • BIS needed: if loop not closed yet, close locally • The arrival of the signals from DCCTs, access system,… have to be tested independently of the stand-alone reliability test during the hardware commissioning, also: • FMCM on MSD • MSD software interlocked? BETS tracking…. • TCDQ functions • IPOC fully tested after this phase 08Nov07

  16. Reliability Testing (2) • ‘Fully-connected’ – during check-out • 450 GeV (2 weeks) • allows beam operation at 450 GeV, pilot • Connection to LHC access system: the LHC needs to be CLOSED!! • TCDQ direct link BLMs • SLP distribution to be tested • Links to MKIs to be tested • Real DCCTs from MBs, MSD, Q4. • RF • BIS. Loop closed • Operational: MKD, MKB, MSD, Q4, BIS, TDE, Vac, TCDQ, TCS, BI, DCCTs, RF ref. freq. signal • LHC cycling • 7 TeV (4 weeks) • allows beam operation up to 7 TeV, pilot • XPOC will only be fully commissioned after first experience with beam 08Nov07

  17. Scenario Testing • We should foresee “scenario tests” • Emergency beam dump: permit loops are linked, PM not suppressed • USER_PERMIT change • Both permit loops broken • LBDS triggers both dumps • CTG detects open loop, sends beam dump event (XPOC) and PM event • XPOC • PM buffers frozen by PM event • PM data pushed to server • Programmed dump at end of fill: permit loops linked, PM not suppressed • Timing table executed containing events dump beam 1 and dump beam 2 • Removes CTG user permit • … • Dump only one beam at end of fill, need to suppress PM event for this beam • Inject & dump: • Injection warning, suppress beam 1 PM (with correct delay), dump beam 1 in timing table • Inject and dump hardware: set with the correct delay turns • Suppress the PM event for one beam, unlink permit loops • Inject and dump hardware counts number of turns and then removes user permit • .. • After dump re-arm BIS and LBDS • … 08Nov07

  18. Summary • LBDS equipment – installation – hardware commissioning: • Work in progress • Settings into LSA, XPOC, applications: • Most of it defined, people assigned • “LBDS Monitoring GUI” not assigned yet • Testing… • Big issue – parallelism,… • Need to discuss also “partial testing” for “Sector test” , etc. • Very much work in progress 08Nov07