9.36.2. Building Envelope – General

9.36.2. Building Envelope – General . Significant Comments Log Wall Construction Material Values (wood, insulation, brick) Calculation Method: Consistency & Assumptions Framing percentages (59187, 59201) Resolution Add wood species, reference ICC 400 calculation method

hank
Download Presentation

9.36.2. Building Envelope – General

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 9.36.2. Building Envelope – General • Significant Comments • Log Wall Construction • Material Values (wood, insulation, brick) • Calculation Method: Consistency & Assumptions • Framing percentages (59187, 59201) • Resolution • Add wood species, reference ICC 400 calculation method • Correct wood species values, add Insulation RSI values, standard references, LTTR note, correct brick value • Spell out assumptions and use consistent method • Parallel path vs. isothermal planes method • Add examples and illustrations • Add assumptions made for framing percentages

  2. 9.36.2. BE – General – cont’d • Significant Comments • Include requirements for vestibules (59369) • Consistency with Standards (59338) • Require protection of all thermal bridges (59251) • “conditioned” space (Régiedubâtimentdu Québec) • Clarity and Consistency • Resolution • Future task • Differences are small – leave as is • not the intent of the requirement – future task • Use defined term – Editor’s Revisions • Editor’s revisions and suggested clarifications / additions

  3. Calculation methods • Revisions that affect the required minimum RSI values • Change • RSI/mm for SPF • From 0.0087 m²K/W per mm • To 0.0085 m²K/W per mm • Exterior sheathing • from 11 mm OSB (0.1087 m²K/W) • to 12.7 mm Gypsum (0.0775 m²K/W) • Calculation Method • From Parallel Path Method • to Isothermal Method

  4. Calculation methods • Requirement changes due to wood value and sheathing revisions • Ceiling below attics - Parallel7.268.7310.13Cathedral ceilings and flat roofs - Parallel4.635.04Walls - Parallel2.933.163.304.19Floors over unheated spaces - Parallel4.635.04Rim joists - Parallel3.313.563.724.56Foundation walls - Parallel2.053.163.574.17

  5. Calculation methods • Parallel Path Method

  6. Calculation methods • Isothermal Planes Method

  7. Calculation methods • Requirement changes due to Calculation Methods